• Title/Summary/Keyword: Repair Cost

Search Result 689, Processing Time 0.025 seconds

Development of Uncertainty-Based Life-Cycle Cost System for Railroad Bridges (불확실성을 고려한 철도 교량의 LCC분석 시스템 개발)

  • Cho, Choong-Yuen;Sun, Jong-Wan;Kim, Lee-Hyeon;Cho, Hyo-Nam
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1158-1164
    • /
    • 2007
  • Recently, the demand on the practical application of life-cycle cost effectiveness for design and rehabilitation of civil infrastructure is rapidly growing unprecedentedly in civil engineering practice. Accordingly, it is expected that the life-cycle cost in the 21st century will become a new paradigm for all engineering decision problems in practice. However, in spite of impressive progress in the researches on the LCC, so far, most researches in Koreahave only focused on roadway bridges, which are not applicable to railway bridges. Thus, this paper presents the formulation models and methods for uncertainty-based LCCA for railroad bridges consideringboth objective statistical data available in the agency database of railroad bridges management and subjective data obtained form interviews with experts of the railway agency, which are used to anew uncertainty-based expected maintenance/repair costs including lifetime indirect costs. For reliable assessment of the life-cycle maintenance/repair costs, statistical analysis considering maintenance history data and survey data including the subjective judgments of railway experts on maintenance/management of railroad bridges, are performed to categorize critical maintenance items and associated expected costs and uncertainty-based deterioration models are developed. Finally, the formulation for simulation-based LCC analysis of railway bridges with uncertainty-based deterioration models are applied to the design-decision problem, which is to select an optimal bridge type having minimum Life-Cycle cost among various railway bridges types such as steel plate girder bridge, and prestressed concrete girder bridge in the basic design phase.

  • PDF

Four-Wheel Tractor Utilization in Korea(II) -Repair and Maintenance- (농용(農用) 트랙터 이용(利用)에 관(關)한 조사연구(調査硏究)(II) -고장(故障) 및 수리실태분석(修理實態分析)-)

  • Park, Ho Seok;Lee, Yong Kook
    • Journal of Biosystems Engineering
    • /
    • v.6 no.2
    • /
    • pp.65-76
    • /
    • 1982
  • This survey was conducted to investigate the status of repair and maintenance of 4 wheel tractor for a basic reference to the improvement of quality and proper utilization of tractors. Thirty two counties from eight provinces, except Jeju, were covered in this study in order to investigate annual break-down and repair of tractor in 1980. The analyzed results are summarized as follows; 1. The average number of break-down of large size tractors(47ps) was 5.0 times in a year and it was about twice of that of small size tractors(19-23ps). The break-down frequency per 100 hours of use was 1.11 times in the large size and 0.65 times in the small size tractors. 2. 75.6 percent of total break-down was occured in main body of tractor and 24.4 percent in attachments. In particular, the break-down of plow and rotavator was more than 80 percent of total break-down of the small size tractor attachments. 3. The large size tractors which were occured more than one times of break-down a year was 75 percent and its rate of the small size tractor was 62 percent. But 9 percent of tractor surveyed had more than ten times of break-down in a year 4. The frequency of break-down had a peak in May, and it was directly proportional to the hours of use. 5. The causes of break-down were poor maintenance and operation by 29.8 precent, old parts by 30.2 percent, poor quality of parts by 20.6 percent, poor field condition by 16.3 percent and others by 3.1 percent. 6. Annual number of repair was 5.5 times and among them 55.6 percent was done by shop and 44.4 percent by operator. 7. Total required repair time was 30.6 hours a year in the large size tractor and 19.9 hours in the small size tractor. Average repair time was 3.62 hours a time. 8. Annual repair cost was 278 thousand won in the large size tractor and 70 thousand won in the small size tractor. The repair cost per hour of use was 621 won in the large size and 198 won in the small size tractor. 9. The repair cost rate of tractor(Y) was regulated with tractor age (X) as follow; Y=0.752X In case of the service life of tractor was 10 years, the total repair cost rate was 64 percent.

  • PDF

An Uncertainty Analysis of Calculating Life Cycle Maintenance and Energy Costs for Technical Proposals (기술제안입찰을 위한 유지관리 및 에너지 비용 산출방식의 불확실성 분석)

  • Chung, Sung Young;Kim, Sean Hay
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.3-9
    • /
    • 2018
  • Although Life Cycle Cost (LCC) must be evaluated by experts, sometimes it may not allow a sufficient time for even the experienced LCC expert to make rational decisions. Therefore, it often ends with relatively comparing the final numbers. We have broken down 110 technical proposals that are actually bade and accepted for large construction projects, and then have analyzed the uncertainty of Maintenance and Energy (M&E) cost during building life cycle, which turns out be the most volatile factor in uncertainty of LCC. Also we suggest "Value Engineering Index (VEI)" - the reduced M&E cost that is normalized by the reduced first cost. It is analyzed that the most uncertain factors of the M&E cost include repair and replacement term differing from each project, duplicated repair and replacement, non-standard repair items, and site-specific energy cost. Eventually we propose a VEI population with a mean of 1.38 and a standard deviation of 1.19, which is obtained by individually and exclusively applying the uncertain factors of the M&E cost to the 35 standard sample of technical proposals. The LCC evaluators may be able to use the VEI population as the benchmark to select the technical proposal with the most reasonable LCC among many others in two suggested manners; the one is to deterministically calculate the probability of single VEIs, and the other is to stochastically calculate the probability of the VEIs where uncertainty is quantified.

A study on the present operation status and the efficient maintenance program of the air-conditioners in each train model (철도차량용 냉방기의 차종별 운용현황고찰과 효율적인 유지보수방안 연구)

  • Hwang, Myeong-Yeon;Sin, Myeong-Ho
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.05a
    • /
    • pp.426-430
    • /
    • 2008
  • Though the air-conditioners in each train model have almost identical function, there is incompatibility between them because of their different electric capacity and parts, even spares manufactures are different in the manufactured year. It cause over cost in the maintenance and repair of the each air-conditioner. In this paper, all the air-conditioners in each train model have been classified by their capacity and features so that grasp the operation status and the repair process of the air-conditioners, and draft systematically cost-effective solutions. By finding a way to deal with the emergency repair and extending the air-conditioner life though improvement of checking up progress, increase of passenger revenue can be reached considerably.

  • PDF

A Study on the Minimum Standards of Housing Repair for Older People Living in the Community (지역사회 노인을 위한 주택수리 및 개조 최저기준에 관한 연구)

  • Hong, Hyung-Ock
    • Journal of Families and Better Life
    • /
    • v.23 no.2 s.74
    • /
    • pp.11-22
    • /
    • 2005
  • The purpose of this study is 1) to clarify that the house is no long the safe place through the cases of the senior safety accidents and to argue the need for housing repair and 2) to present the minimum standards for housing repair by comparing the cases here as well as the abroad and to back up the standards with the current senior housing environment 300 people at least 60 years old living in Seoul$\cdot$Metropolitan area were interviewed using the structured questionnaire. As the result, the following conclusions were made: 1. There was high accident rates of the senior residents due to physical deficits within the house, causing excessive medical cost and decreased housing satisfaction. This problem can be sufficiently prevented by housing repair which can not only solve the safety problem but also support self sufficient living for the senior residents. 2. Proper housing repair required the architectural know how as well as the expertise knowledge of the physical characteristics of the senior people. Therefore, it is essential to secure the professional (i.e., occupational therapist) who can analyze the needs of the senior residents and evaluate and/or predict the obstacles during repair. Furthermore, development and distribution of the standardized manual are also needed. 3. The minimum standard for housing repair could be approached in view of 'barrier-free' concept. First, the bumps should be removed, slippery prevented, and safety grab-bar installed for safety. Second, the entrance should be widened and the bathroom and kitchen restructured to support for the senior residents' self sufficiency. To make housing repair policy more efficient, the legal basis is required. It can be incorporated into the existing senior citizens 'Welfare Act' or the 'Senior Residents Medical Insurance' which will be effective starting in 2007.

Optimization of Software Cost Model with Warranty and Delivery Delay Costs

  • Lee, Chong-Hyung;Jang, Kyu-Beom;Park, Dong-Ho
    • Communications for Statistical Applications and Methods
    • /
    • v.12 no.3
    • /
    • pp.697-704
    • /
    • 2005
  • Computer software has gradually become an indispensable elements in many aspects of our daily lives and an important factor in numerous systems. In recent years, it is not unusual that the software cost is more than the hardware cost in many situations. In addition to the costs of developing software, the repair cost resulting from the software failures are even more significant. In this paper, a cost model with warranty cost, time to remove each fault detected in the software system, and delivery delay cost is developed. We use a software reliability model based on non-homogeneous Poisson process (NHPP). We discuss the optimal release policies to minimize the expected total software cost. Numerical examples are provided to illustrate the results.

Report on VE & LCC (Value Engineering, Life Cycle Cost) Technics Introduction about the Electric Power Equipment (전력시설물에 대한 VE 와 LCC기법 도입에 관한 연구)

  • 김상직;장우진
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2003.11a
    • /
    • pp.81-86
    • /
    • 2003
  • Recently the introduction of VE & LCC techniques for large size electric power facilities be achieved in various kinds form, of and tends to evaluate to the beginning investment cost when think about cost of electric power facilities usually, but must consider all life cycle cost (maintenance cost, repair cost, improvement cost, operation cost, electric power cost etc.). This treatise applies design techniques that consider copper loss related by voltage drop at power supply of long distance in trunk design and all life cycle cost techniques

  • PDF

Maintenance of air filter system in clean room (청정실내의 공기 필터 시스템의 보전)

  • 구자항;고명훈
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.19 no.40
    • /
    • pp.341-349
    • /
    • 1996
  • In this paper, we deal with the problem of maintenance policies for an air filter system in clean room. Two types of maintenance policies are considered, one based on the reliability of equipment and the other one determined by the total cost including minimal repair cost. For these models, we obtain the structure of the optimal maintenance Policy which minimize the total cost. Finally we give the numerical example.

  • PDF

Optimal Periodic Preventive Maintenance with Improvement Factor (개선지수를 고려한 주기적 예방보전의 최적화에 관한 연구)

  • Jae-Hak Lim
    • Journal of Korean Society for Quality Management
    • /
    • v.31 no.3
    • /
    • pp.193-204
    • /
    • 2003
  • In this paper, we consider a periodic preventive maintenance(PM) policy in which each PM reduces the hazard rate but remains the pattern of hazard rate unchanged. And the system undergoes only minimal repairs at failures between PM's. The expected cost rate per unit time is obtained. The optimal number N of PM and the optimal period x, which minimize the expected cost rate per unit time are discussed. Explicit solutions for the optimal periodic PM are given for the Weibull distribution case.

An EMQ Model in An Unreliable Machine (불완전한 생산 시스템에서의 경제적인 생산량 결정)

  • Kim, Chang-Hyun;Hong, Yu-Shin;Kim, Soo-Young
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.20 no.2
    • /
    • pp.3-17
    • /
    • 1994
  • This paper presents an EMQ model which determines an optimal manufacturing lot size in an unreliable machine. The machine has an exponentially distributed life time, and requires a constant time to repair when it fails. We 1) derive an average cost function, 2) obtain an optimal lot size and show that it is unique, 3) carry out sensitivity analysis to examine the effect of machine parameters (life time, time to repair) to optimal lot size.

  • PDF