• Title/Summary/Keyword: Remodeling Project

Search Result 175, Processing Time 0.022 seconds

A Process Model of Eco-friendly Demolition Work for Wall Type Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 (벽식구조 노후 공동주택을 대상으로))

  • Hwang, Young-Gyu;Kim, Ki-Hyun;Kim, Kyung-Ra;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.204-215
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 개발)

  • Hwang, Young-Gyu;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.85-92
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

  • PDF

The Economic Comparision through LCC Analysis on each Graded Alternatives for Green Remodeling of Public Building (공공건축물의 그린리모델링 수준별 LCC (Life Cycle Cost) 분석을 통한 경제성 비교)

  • Kim, Jaemoon;Lee, Junghyuk;Lee, Duhwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.38-49
    • /
    • 2018
  • Since the ratification of the Paris Agreement (COP21), the government is continuously strengthening policies for the reduction of greenhouse gas of the construction industry in accordance with the growing importance of reducing greenhouse gas and obligation of the government. Especially, the government emphasizes the need to improve the energy performance of old public buildings. Since 2014, the government is running a pilot project in which the government supports the construction cost of the green remodeling project of old public buildings and it is intended to develop the best practice of green remodeling and activate the green remodeling in the private sector. In this study, we analyzed the economical efficiency of the old public buildings by each level through green remodeling and conducted building related investigation and equipment measurement to plan the alternatives of the corresponding buildings. The improvement plan is a green remodeling plan that integrates alternatives. Five improvement plans were developed for each level to analyze the economic feasibility of each plan. As for the analysis method, the first energy demand amount calculation and the LCC analysis were performed through ECO2. In the LCC aspect, the improved 3/4 plan (middle level plan) was the most excellent and results were obtained in the order of the highest cost plan followed by the lowest cost plan. As a result, it is expected that it can be utilized as a basic data for future green remodeling performance plan and economic feasibility analysis in the future.

A Policy of Senior Community Center in Rural Area - Focused on Pilot Project of Senior Community Center - (농촌지역 고령자 공동시설의 추진방향 - '농촌고령자 공동시설지원 시범사업'을 중심으로 -)

  • Nam, Yun-Cheol
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.17 no.1
    • /
    • pp.121-128
    • /
    • 2015
  • The elderly rate in South Korea in 2013 is over 12%. Especially, the elderly rate in rural area is 36%, i.e., in rural area, one of three is people aged 65 and over. Senior community project in rural that is being promoted by the government. This project is to improve the quality of life health and welfare services for the elderly in rural Area. This paper investigates cases used as living space by interview and remodeling senior centers (village community center) for the elders living alone in rural areas. In Gimje two the nation's first senior centers were remodeled in 2006 (for both the village community center) and were begun to use these as group homes. Evaluation was a success. Since then, these were increased by approximately 20 centers per year by year and are currently 108 centers at the end of 2011. In Chungcheongnam-do, a pilot project has been begun for communal living by remodeling the senior center (for both the village community center) and elderly housing. Municipalities are similar in their business (is mostly). Senior community center projects can proceed smoothly in the direction of some of the following tips and suggestions to promote. Senior community center should be expanded for 'private room type'. Government must support the operating costs. It will increase employment in rural areas. Senior community center should be 'Home Atmosphere'.

School Building Remodeling Suggestion Responding to the Different Needs of Users - Case study under 'School Restroom Environment Remodeling Project in Seoul' - (사용자의 이용 요구 차이를 반영한 학교건축물의 개·보수 계획 - 서울시 학교 화장실 개·보수 사업 시행 사례 -)

  • Lee, Eunjoo
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.25 no.3
    • /
    • pp.13-24
    • /
    • 2018
  • Unlike other educational spaces in school facilities, restrooms have remained unpleasant spaces without reflecting the change in social awareness and students' lifestyle. In the process of the 'School Restroom Environment Remodeling Project in Seoul' by means of "user participatory design method", this study aimed to suggest a design of the school restroom environment responding to the different needs of actual users, who are students and school staffs. By surveying them, it was revealed that they have a variety of respective behavioral patterns and spatial needs according to their status, gender, age and working period. Implications of this study are as follows; First, it is necessary to establish a separate restroom facility standards that respond to the characteristics of elementary school students. Second, there should be an expansive approach to widely accommodate with the users' needs that were found out through 'user participation', more than just repairing pre-existing space. Third, it needs to have critical review of the maintenance and operation system itself as well as the improvement of the school restroom environment.

Physical Environment Change and Occupancy Evaluation on Green-Remodeled University Dormitory (그린리모델링 기숙사의 물리적환경 변화와 거주자평가)

  • Choi, Yoon-Jung;Lee, Ho-Yeon;Lee, Hyun-Jung;Kim, Won-bae
    • Journal of the Korean housing association
    • /
    • v.28 no.1
    • /
    • pp.37-44
    • /
    • 2017
  • This study focuses on the university dormitory remodeled toward energy efficiency. The study has its purpose on deriving the aspects to be concerned for later green remodeling and enhancing the effects of green remodeling, by analyzing the changes of physical environment, changes of energy consumption amount, and needs of the residents. For this purpose, the study went through the review of project report from government office for green remodeling, field investigation of remodeling elements, and the occupancy evaluation by Focus Group Interview. FGI means interviewing small group of the residents who lived in the subjected dormitories both before and after the remodeling. As results, the elements of green remodeling in targeted dormitories were inner wall insulation, top-floor ceiling insulation, replacement of windows, installment of automatic entrance door and making transfer space connected the entrance door. As the parts of equipment system, EHP high-efficiency cooler, highly efficient radiator, upgraded LED lightings with covers, and automatic control system (only one building) were installed. Energy consumption was declined, and the satisfaction of residents was increased after the green remodeling. However, the aspects which were not improved or unsatisfying also have been detected. Therefore, the study states the suggestions each for the administrators, designers and planners, and residents to concern for enhancing the effects of green remodeling or construction of new dormitories.

A Study on Normal Project Period for Parking Lot of Aged Apartment Housing (노후 공동주택 주차장 리모델링 공사 표준공기 설정에 관한 연구)

  • Bang, Seongbae;Jang, JunYoung;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.107-119
    • /
    • 2021
  • Recently, interest in remodeling apartment houses has been increasing due to problems such as a lack of parking spaces for old apartment houses. However, no method was suggested to predict the construction period of the apartment remodeling project. Unlike general apartment new construction, apartment remodeling construction involves demolition or reinforcement work, so a realistic remodeling construction period calculation plan differentiated from the existing construction period should be proposed. Therefore, this study intends to present a model for deriving the construction period of the underground parking lot of the apartment remodeling construction. Each construction period was calculated based on 19 activities of underground parking lot remodeling work through review of previous studies and expert advice. Activity's workload data and productivity data were derived to calculate the construction period, and the number of inputs and equipment inputs by Activity were determined to correct the productivity data. The construction period of Activity was calculated using the derived data, and the criteria for calculating the overlapping period for each Activity were presented to enable realistic construction period and scheduled schedule. As a result of predicting the accuracy of the construction period through the verification of the case complex, it is expected that it will be possible to predict the approximate construction period of the underground parking lot of the apartment remodeling construction in the future.

The Analysis of the Importance of Influencing Factors in the Planning Stage of the Long-Term Public Rental Housing of Remodeling Project (장기공공임대주택 리모델링 사업의 기획단계 영향요인 중요도 분석)

  • Jung, Yong-Chan;Jin, Zheng-Xun;Hyun, Chang-Taek;Lee, Sanghoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.3-16
    • /
    • 2024
  • The government announced the Housing Welfare Roadmap (November 2017), to expand the supply of public rental housing by reconstructing aged long-term public rental complexes. Also, remodeling projects for complexes with low business feasibility of reconstruction projects are recognized as an alternative to supplying public rental housing in urban area. This study analyzed influence factors by dividing them into project feasibility, architectural plan, urban & residential environment plan, and legal system groups in order to establish a plan for long-term public rental housing remodeling project. Futhermore, this work conducted the principal component analysis to get the principal component factors among the influence factors of each group, and the weight analysis to calculate weighting of them. In addition, major influence factors were derived by calculating the relative importance score (RIS) of each factor. Lastly this paper validated the major influence factors and applicability of the procedure to select 3 complexes that can be reviewed for remolding project among 33 long-term public rental housing complexes located in Seoul. The results of this study are expected to be useful when establishing a remodeling project plan for long-term public rental housing.

The policy issues for the apartment remodeling projects (공동주택 리모델링 정책의 현황과 개선방향)

  • Yoon Young-Sun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.42-45
    • /
    • 2002
  • Building remodeling concept includes maintenance & repair and renovation. We have long-term repair plan and special repair fund system for the apartment maintenance & repair, but they do not operate well. And laws and ordinances are being revised in relation with renovation. However, more policy improvement and assistance are needed in order to activate the apartment remodeling project. Especially preferential loan and tax reduction policy and deregulation of building provisions are the main tasks for the apartment remodeling.

  • PDF

Selection Method for Component Alternatives of Considering Building Systems Correlation in Remodeling Projects (리모델링 프로젝트에서 건축시스템 상관관계를 고려한 부위별 대안선정 방법)

  • Park Chan-Gil;Lee Dong-Jun;Shin Chang-Hyung;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.402-405
    • /
    • 2003
  • As Remodeling is proceed in the limited condition that is utilization of existing resource, the selection of remodeling objects and scope are affected by the correlation of building systems. Unexpected problems have occurred in construction phase by lack of the consideration about correlation of building systems; increasing of cost, delaying of schedule etc. Therefore, this research suggests the Building System Correlation Diagram Model and the method for selecting the alternative reasonably in remodeling project.

  • PDF