• Title/Summary/Keyword: Reliability Growth Management

Search Result 221, Processing Time 0.029 seconds

Application of Reliability Growth Management for Construction Equipment Development Process (건설장비 개발과정에서 신뢰성성장관리 적용방법에 대한 연구)

  • So, Young-Kug;Jeon, Young-Rok;Ryu, Byeong-Jin
    • Journal of Applied Reliability
    • /
    • v.13 no.3
    • /
    • pp.175-190
    • /
    • 2013
  • This study considers reliability growth management as the excellent method for construction equipment development with the effect on decreasing COPQ(Cost of Poor Quality Cost) of new products. MIL-HDBK-189A(1981) and RADC-TR-84-20(1984) standards provide a general concept of reliability growth management including to reliability growth test, models and FRACAS(Failure Reporting and Corrective Action System). There is no study how to apply reliability growth management to construction equipment(or machine) development. This paper propose the method to apply it to construction equipment development process from the reliability target setting for developing products to launching them at market. It is expecially showing how to set target reliability for new developing equipment and the development risk to reach the reliability target in detail.

Reliability Prediction Based Reliability Growth Management : Case Study of Surveillance System (신뢰도 예측 기반 신뢰도 성장 관리 : 감시체계 사례)

  • Kim, SB;Park, WJ;You, JW;Lee, JK;Yong, HY
    • Journal of Korean Society for Quality Management
    • /
    • v.47 no.1
    • /
    • pp.187-198
    • /
    • 2019
  • Purpose: In this study, a reliability prediction based reliability growth management is suggested especially for the early development phase of a system and the case study of surveillance system is given. Methods: The proposed reliability prediction based reliability growth management procedures consists of 7 Steps. In Step 1, the stages for reliability growth management are classified according to the major design changes. From Step 2 to Step 5, system reliability is predicted based on reliability structures and the predicted reliabilities of subsystems (Level 2) and modules (Level 3). At each stage, by comparing the predicted system reliability with that of the previous stage, the reliability growth of the system is checked in Step 6. In Step 7, when the predicted value of sustem reliability does not satisfy the reliability goal, some design alternatives are considered and suggested to improve the system reliability. Results: The proposed reliability prediction based reliability growth management can be an efficient alternative for managing reliability growth of a system in its early development phase. The case study shows that it is applicable to weapon system such as a surveillance system. Conclusion: In this study, the procedures for a reliability prediction based reliability growth management are proposed to satisfy the reliability goal of the system efficiently. And it is expected that the use of the proposed procedures would reduce, in the test and evaluation phase, the number of corrective actions and its cost as well.

A Method of Reliability Growth Management Test Design for Continuous System (연속형 시스템의 신뢰성 성장 관리 시험 설계 방안)

  • Seo, Yang Woo;Yoon, Jung Hwan;Lee, Seung Sang;Um, Chun Sup
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.16 no.2
    • /
    • pp.87-96
    • /
    • 2020
  • In this paper we proposed the test design method of reliability growth management. First, we presented the process for establishing the reliability growth management test design considering the number of failures and the termination test time. Reliability growth analysis of continuous system was performed in accordance with the test design process presented. In case the reliability test result is not met with the reliability target value after more than three failures occurred, the required test times were analyzed that 1,725 hrs for one corrective action, 1,950 hrs for two corrective actions. If the number of failures is less than three, design a reliability demonstration test according to confidence level 80% and 90% was performed using RGA 11 Software. As a result, it is possible to establish the reliability growth management test design with sufficient use of available resources. The results of this study can be used when establishing a test design for assessment of reliability growth management of all continuous systems.

Reliability Growth Management for Armed Vehicle : Launcher System Case Study (기동장비 신뢰도 성장 관리 연구 : 발사대 체계 사례)

  • Lee, YJ;Bae, GB;Heo, YM;Seo, JH;Kim, SB;Choi, JK;Park, WJ
    • Journal of Korean Society for Quality Management
    • /
    • v.45 no.4
    • /
    • pp.981-994
    • /
    • 2017
  • Purpose: In this study, the reliability growth management procedures for armed vehicle is suggested and an illustrative case study of launcher system is given. Methods: Crow-AMSAA model is adopted to manage reliability growth of armed vehicle using failure data acquired from development test phase to field operation phase. Between the development test phase and the production phase, the suggested reliability growth procedures for armed vehicle entails accelerated life test of the selected module whose design is changed to improve its reliability for assuring the target system reliability. And it can be verified through estimating the system reliability based on the failure data of field operation phase. Results: It is shown that the proposed reliability growth management procedures are effective for armed vehicle based on the case study of launcher system. After estimating the reliability of launcher system at every development test, some items are selected to change their designs for improving reliability. Accelerated life test is performed to prove the reliability improvement and finally it is verified through the field operation. Conclusion: The reliability growth management procedures for armed vehicle is suggested and the case study of launcher system shows it can be effective for managing the reliability growth of the armed vehicle.

A Comparison of Reliability Growth Assessment Models Centered on MIL-HDBK-189C (MIL-HDBK-189C의 신뢰성성장 평가 모델의 비교)

  • Kim, Myung Soo;Chung, Jae Woo;Lee, Jong Sin
    • Journal of Applied Reliability
    • /
    • v.13 no.3
    • /
    • pp.217-227
    • /
    • 2013
  • Reliability growth is defined as the positive improvement in a reliability parameter over a period of time due to implementation of corrective actions to system design, operation or maintenance procedures, or the associated manufacturing process. In recent, the importance of reliability growth management has emerged in the military authority and industries. For effective application of reliability growth models, it is necessary to understand their characteristics and differences. This paper presents the concepts of reliability growth management and compares the features of reliability tracking and projection models centered on MIL-HDBK-189C for selecting the appropriate model for an one-shot system under development.

Reliability growth management for the delayed fixes and development cost in the reliability growth development phase (신뢰성 성장 개발단계에서 지연수정과 개발시험비용을 고려한 신뢰성 성장관리)

  • Kim, Jun-Hong;Jung, Won
    • Journal of Applied Reliability
    • /
    • v.5 no.3
    • /
    • pp.381-391
    • /
    • 2005
  • The level of reliability attained largely depends upon the investment in reliability growth programs during development phase. In order to find the relationship between reliability growth test time and BRTE(basic reliability tasks effectiveness) in a reliability improvement program that minimizes LCC in which contains the reliability growth cost, repair and replacement costs, and spare parts ordering costs in service with given service rate in management policy, the growth rate has been suggested proper LCC versus growth rate. This model employs the reliability growth projection with delayed fixes in avionic equipment based on AMSAA.

  • PDF

Practical Reliability Growth Management for RAM Growth Monitoring (RAM 성장모니터링을 위한 실용적인 신뢰성 성장관리)

  • Jung Won
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.258-263
    • /
    • 2005
  • The purpose of this research is to present a practical method for efficiently monitoring a reliability growth process using AMSAA(Army Materiel Systems Analysis Activity) reliability growth model. The presented method is viable for identifying failure modes, incorporating design changes and monitoring reliability progress on an on-going basis during the early stages of a product development program. According to the Application Guide for EN 50126(RAM part for Rolling Stock), reliability growth monitoring is essential part of the main tasks of design phase in RAM growth monitoring. Implementation of reliability growth management program will provide very useful information on concept selection, product/process reliability, and cost effectiveness without too much time, money and engineering effort being spent on the development of failure suspect parts.

  • PDF

The Impact of Reliability Growth on Spares Provisioning

  • Jung, Won
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.18 no.2
    • /
    • pp.157-173
    • /
    • 1993
  • Reliability growth modeling can be a requirement when bidding on large military hardware systems. Under current reliability warranty legislature, the reliability growth model can be later translated into necessary reliability performance which must be demonstrated over an extended period of usage. In this paper the modeling situation is concerned with determining the number of spares needed to support a projected reliability growth both at the fightine and in a depot inventory. The model differs from existing models for logistics planning in that we allow for the phenomena of reliability growth. The model can also be used to determine central depot staffing requirements based upon a specified system utilization.

  • PDF

A Classification and Selection of Reliability Growth Models

  • Jung, Won;Kim, Jun-Hong;Yoo, Wang-Jin
    • Journal of Korean Society for Quality Management
    • /
    • v.31 no.1
    • /
    • pp.11-20
    • /
    • 2003
  • In the development of a complex systems, the early prototypes generally have reliability problems, and, consequently these systems are subjected to a reliability growth program to find problems and take corrective action. A variety of models have been proposed to account for the reliability growth phenomena. Clear guidelines need to be established to assist the reliability engineers for model selection. In this paper, some of more well-known growth models are surveyed and classified. These models are classified based upon distinguishing model features. A procedure for model selection is introduced which is based on this classification.