• Title/Summary/Keyword: Relative Uncertainty

Search Result 289, Processing Time 0.031 seconds

Analysis on Upper and Lower Bounds of Stochastic LP Problems (확률적 선형계획문제의 상한과 하한한계 분석)

  • 이상진
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.27 no.3
    • /
    • pp.145-156
    • /
    • 2002
  • Business managers are often required to use LP problems to deal with uncertainty inherent in decision making due to rapid changes in today's business environments. Uncertain parameters can be easily formulated in the two-stage stochastic LP problems. However, since solution methods are complex and time-consuming, a common approach has been to use modified formulations to provide upper and lower bounds on the two-stage stochastic LP problem. One approach is to use an expected value problem, which provides upper and lower bounds. Another approach is to use “walt-and-see” problem to provide upper and lower bounds. The objective of this paper is to propose a modified approach of “wait-and-see” problem to provide an upper bound and to compare the relative error of optimal value with various upper and lower bounds. A computing experiment is implemented to show the relative error of optimal value with various upper and lower bounds and computing times.

A Study on the Point Placement Task of Robot System Based on the Vision System (비젼시스템을 이용한 로봇시스템의 점배치실험에 관한 연구)

  • Jang, Wan-Shik;You, Chang-gyou
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.13 no.8
    • /
    • pp.175-183
    • /
    • 1996
  • This paper presents three-dimensional robot task using the vision control method. A minimum of two cameras is required to place points on end dffectors of n degree-of-freedom manipulators relative to other bodies. This is accomplished using a sequential estimation scheme that permits placement of these points in each of the two-dimensional image planes of monitoring cameras. Estimation model is developed based on a model that generalizes known three-axis manipulator kinematics to accommodate unknown relative camera position and orientation, etc. This model uses six uncertainty-of-view parameters estimated by the iteration method.

  • PDF

Exploring the factors responsible for variation in streamflow using different Budyko-base functions

  • Shah, Sabab Ali;Jehanzaib, Muhammad;Kim, Min Ji;Kim, Tae-Woong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.140-140
    • /
    • 2022
  • Recently an accurate quantification of streamflow under various climatological and anthropogenic factors and separation of their relative contribution remains challenging, because variation in streamflow may result in hydrological disasters. In this study, we evaluated the factors responsible for variation in streamflow in Korean watersheds, quantified separately their contribution using different Budyko-based functions, and identified hydrological breakpoint points. After detecting that the hydrological break point in 1995 and time series were divided into natural period (1966-1995), and disturbed period (1996-2014). During the natural period variation in climate tended to increase change in streamflow. However, in the disturbed period both climate variation and anthropogenic activities tended to increase streamflow variation in the watershed. Subsequently, the findings acquired from different Budyko-based functions were observed sensitive to selection of function. The variation in streamflow was observed in the response of change in climatic parameters ranging 46 to 75% (average 60%). The effects of anthropogenic activities were observed less compared to climate variation accounts 25 to 54% (average 40%). Furthermore, the relative contribution was observed to be sensitive corresponding to Budyko-based functions utilized. Moreover, relative impacts of both factors have capability to enhance uncertainty in the management of water resources. Thus, this knowledge would be essential for the implementation of water management spatial and temporal scale to reduce the risk of hydrological disasters in the watershed.

  • PDF

Uncertainty Analysis of the Eddy-Covariance Turbulent Fluxes Measured over a Heterogeneous Urban Area: A Coordinate Tilt Impact (비균질 도시 지표에서 측정된 에디 공분산 난류 플럭스의 불확실성 분석: 좌표계 편향 영향)

  • Lee, Doo-Il;Lee, Jae-Hyeong;Lee, Sang-Hyun
    • Atmosphere
    • /
    • v.26 no.3
    • /
    • pp.473-482
    • /
    • 2016
  • An accurate determination of turbulent fluxes over an urban area is a challenging task due to its morphological diversity and associated flow complexity. In this study, an eddy covariance (EC) method is applied over a highly heterogeneous urban area in a small city (Gongju), South Korea to investigate the quantitative influence of 'coordinate tilt' in determining the turbulent fluxes of sensible heat, latent heat, momentum, and carbon dioxide mass. Two widely-used coordinate transform methods are adopted and applied to eight directional sections centered on the site to analyze a 1-year period EC measurement obtained from the urban site: double rotation (DR) and planar fit (PF) transform. The results show that mean streamline planes determined by the PF method are distinguished from the sections, representing morphological heterogeneity of the site. The sectional pitch angles determined by the DR method also compare well with those in the PF method. Both the PF and DR methods show large variabilities in the determined streamline planes at each directional section, implying that flow patterns may form in a complicate way due to the surface heterogeneity. Resulting relative differences of the turbulent fluxes, defined by $(F_{DR}-F_{PF})/F_{DR}$, are found on average +13% in sensible heat flux, +21% in latent heat flux, +37% in momentum flux, and +26% in carbon dioxide mass flux, which are larger values than those reported previously for fairly homogeneous natural sites. The fractional differences depend significantly on wind direction, showing larger differences in northerly winds at the measurement site. It is also found that the relative fractional differences are negatively correlated with the mean wind speed at both stable/unstable atmospheric conditions. These results imply that EC turbulent fluxes determined over heterogeneous urban areas should be carefully interpreted with considering the uncertainty due to 'coordinate tilt' effect in their applications.

Study of Stochastic Techniques for Runoff Forecasting Accuracy in Gongju basin (추계학적 기법을 통한 공주지점 유출예측 연구)

  • Ahn, Jung Min;Hur, Young Teck;Hwang, Man Ha;Cheon, Geun Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.1B
    • /
    • pp.21-27
    • /
    • 2011
  • When execute runoff forecasting, can not remove perfectly uncertainty of forecasting results. But, reduce uncertainty by various techniques analysis. This study applied various forecasting techniques for runoff prediction's accuracy elevation in Gongju basin. statics techniques is ESP, Period Average & Moving average, Exponential Smoothing, Winters, Auto regressive moving average process. Authoritativeness estimation with results of runoff forecasting by each techniques used MAE (Mean Absolute Error), RMSE (Root Mean Squared Error), RRMSE (Relative Root Mean Squared Error), Mean Absolute Percentage Error (MAPE), TIC (Theil Inequality Coefficient). Result that use MAE, RMSE, RRMSE, MAPE, TIC and confirm improvement effect of runoff forecasting, ESP techniques than the others displayed the best result.

Assessment of predictability of categorical probabilistic long-term forecasts and its quantification for efficient water resources management (효율적인 수자원관리를 위한 범주형 확률장기예보의 예측력 평가 및 정량화)

  • Son, Chanyoung;Jeong, Yerim;Han, Soohee;Cho, Younghyun
    • Journal of Korea Water Resources Association
    • /
    • v.50 no.8
    • /
    • pp.563-577
    • /
    • 2017
  • As the uncertainty of precipitation increases due to climate change, seasonal forecasting and the use of weather forecasts become essential for efficient water resources management. In this study, the categorical probabilistic long-term forecasts implemented by KMA (Korea Meteorological Administration) since June 2014 was evaluated using assessment indicators of Hit Rate, Reliability Diagram, and Relative Operating Curve (ROC) and a technique for obtaining quantitative precipitation estimates based on probabilistic forecasts was proposed. The probabilistic long-term forecasts showed its maximum predictability of 48% and the quantified precipitation estimates were closely matched with actual observations; maximum correlation coefficient (R) in predictability evaluation for 100% accurate and actual weather forecasts were 0.98 and 0.71, respectively. A precipitation quantification approach utilizing probabilistic forecasts proposed in this study is expected to enable water management considering the uncertainty of precipitation. This method is also expected to be a useful tool for supporting decision-making in the long-term planning for water resources management and reservoir operations.

Uncertainty evaluation for the determination of creatinine in urine by LC-MS/MS (LC-MS/MS를 이용한 소변 중 크레아티닌 분석의 측정불확도 평가)

  • Kim, Jin-Young;Kwon, Woon-Yong;Suh, Sung-Ill;In, Moon-Kyo
    • Analytical Science and Technology
    • /
    • v.25 no.1
    • /
    • pp.83-90
    • /
    • 2012
  • The objective of the study was to estimate the measurement uncertainty associated with determination of creatinine (Cr) in urine samples by liquid chromatography-tandem mass spectrometry (LC-MS/MS). Centrifuged urine samples (10 ${\mu}L$) were diluted with 390 ${\mu}L$ of distilled water. To 20 ${\mu}L$ aliquots of diluted urine samples, 30 ${\mu}L$ of internal standard solution (Cr-$d_3$, 5 ${\mu}g/mL$) and 10 ${\mu}L$ of acetonitrile were added and filtered. The samples (1 ${\mu}L$) were introduced into LC-MS/MS with no further pretreatment. Cr was separated on a multi-mode ODS column (Scherzo SM-C18, 75 ${\times}$ 2.0 mm I.D., 3 ${\mu}m$) and quantified by LC-MS/MS operating in MRM mode (Cr, m/z 114.0${\rightarrow}$ 86.0; Cr-$d_3$, m/z 117.0${\rightarrow}$ 89.1). The four factors that contribute uncertainty to the final result were extracted and evaluated. The principal factors of contribution to combined standard uncertainty were sample dilution, calibration curve and repeatability, while the preparation of standard solution was only a minor factor. Relative extended uncertainty of the measured concentration was 14.2% in a real urine sample.

A Study on Relative Importance of Project team members Competencies Using AHP (AHP를 활용한 프로젝트 팀 구성원의 개인역량 상대적 중요도 연구)

  • Kim, Yeoungdae;Lee, Jinah;Oh, Minjeong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.3
    • /
    • pp.216-227
    • /
    • 2020
  • The purpose of this paper is to identify a relative importance and priority of the factors of Competencies of project team member. It aims to present the differential competency factors from a differentiated perspective by applying the Leadership Development Questionnaire, which is the competency dimension required for manager, to team member. (1) Background: The diverse needs of customers and companies, and the uncertainty, complexity, ambiguity, and volatility of the environment surrounding the company in the era of the Fourth Industrial Revolution threaten the survival of company. In this respect, companies should implement the project management approach and strive to increase the capabilities of each team member. (2) Methods: AHP method was used to prioritize which factors were considered more importance level and the gap of relative importance level between project manager group and team members group. (3) Results: In the analysis of the relative importance of the upper class, weights were derived in the order of managerial competence, intellectual competence, and emotional competence. The sub-factor that respondents prioritize was communication as the 1st priority, and it was analyzed in the order of strategic perspective, achieving, critical analysis and judgement, and vision and imagination. There were some differences in the ranking of the relative importance of achieving and vision and imagination attributes between the PM group and TM group, it was analyzed that there was no significant difference overall. (4) Implications: The results of this study confirmed the recognition that team members are required to have the same competencies as the project manager. And based on the priorities of the competencies required of team members, companies are expected to cultivate professional and competent team members, and expand the roles and authority of team members so that they can actively carry out projects.

A Study on Spacial Characterristics of MVRDV's Architecture (MVRDV의 건축에 나타난 공간 구성 수법에 관한 연구)

  • Cho, Young-Bae
    • Korean Institute of Interior Design Journal
    • /
    • v.17 no.1
    • /
    • pp.77-83
    • /
    • 2008
  • MVRDV is most important architect as created interesting architectural space in contemporary architecture, and so they applies to the unique theory in their architecture. They used to architectural diagram, program, datascape, density as a design tool. Especially, they have create new architectural space and form in using architectural diagram, program, datascape, density, and void. So, this study is purposed to explain how they use as architectural tool to make composition of it's architectural space and is purpose to explain what is their main concept in architectural space. MVRDV's architectural space has fundamental methodology. That is Datascape on uncertainty and continuity between urban space and architectural space. The former consist in using diagram and architectural program and the latter consist in operating architectural void and inner continuity surface. The conclusion is follows 1. The mode of spacial composition by architectural void is correspond density of city as MVRDV's architectural thinking. 2. The mode of spacial composition by architectural program is ambiguous to the boundary between inner and exterior space by transparency. 3. The mode of spacial composition by architectural diagram make to generate the architectural form and space, through the reinterpretation and relocation of architectural program. 4. The mode of spacial composition inner continuity plane is make relative between site and inner space.

Numerical simulation of 3-D probabilistic trajectory of plate-type wind-borne debris

  • Huang, Peng;Wang, Feng;Fu, Anmin;Gu, Ming
    • Wind and Structures
    • /
    • v.22 no.1
    • /
    • pp.17-41
    • /
    • 2016
  • To address the uncertainty of the flight trajectories caused by the turbulence and gustiness of the wind field over the roof and in the wake of a building, a 3-D probabilistic trajectory model of flat-type wind-borne debris is developed in this study. The core of this methodology is a 6 degree-of-freedom deterministic model, derived from the governing equations of motion of the debris, and a Monte Carlo simulation engine used to account for the uncertainty resulting from vertical and lateral gust wind velocity components. The influence of several parameters, including initial wind speed, time step, gust sampling frequency, number of Monte Carlo simulations, and the extreme gust factor, on the accuracy of the proposed model is examined. For the purpose of validation and calibration, the simulated results from the 3-D probabilistic trajectory model are compared against the available wind tunnel test data. Results show that the maximum relative error between the simulated and wind tunnel test results of the average longitudinal position is about 20%, implying that the probabilistic model provides a reliable and effective means to predict the 3-D flight of the plate-type wind-borne debris.