Journal of The Korean Society of Agricultural Engineers
/
v.56
no.6
/
pp.63-73
/
2014
In this study, the large scale test was performed to investigate the behavior of failure on the embankment and spillway transitional zone by overtopping. The pore water pressure, earth pressure, settlement and failure behaviors according to several reinforcing method were compared and analyzed. The pore water pressure showed a small change in the spillway transition zone and core, indicating that the riprap and geotextile efficiently reinforced the embankment, but non-reinforcement showed a largely change in pore water pressure. The earth pressure by riprap and geotextile at upstream slope and bottom core increased rapidly with the infiltration of the pore water by overtopping. And the earth pressure at crest showed a smally change due to effect of the inclined core. A settlement by riprap showed a small change and the geotextile decreased a rapidly due to failure of crest. The width of failure by riprap at intermediate stage (50 min) showed a largely due to sliding of crest. But, the width and depth of the seepage erosion after the intermediate overtopping period (100 min) were very small due to the effect of riprap than geotextile and non-reinforcement which delayed failure. It has the effect that protect reservoir embankment from erosion in the central part. The pore water pressure at the spillway transition zone due to overtopping increased a rapidly in the case of non-reinforcement, but the reinforced methods by geotextile and riprap showed a smally change. Therefore, the reinforced method by riprap and geotextile was a very effective method to protect permanently and the emergency an embankment due to overtopping, respectively.
In this study, a large laboratory model experiment was conducted with the aim of developing an embankment reinforcement method to prevent overtopping, which is the main cause for the failure of agricultural reservoirs. The model experiment was carried out with concrete and asphalt as a permanent reinforcement method and with geomembrane as the emergency method at a deteriorated homogeneous reservoir. Under the non-reinforced conditions, the pattern of the failure appeared in several scour directions from the downstream slope as the overtopping began, and the width and depth of the erosion were magnified as it gradually moved to the dam crest. Under the conditions reinforced with asphalt and concrete, the overtopping was stabilized. In the case of the concrete reinforcement, it was found that the slope of the riprap boundary exhibited downward erosion by the current; thus, it was necessary to construct an extension up to the riprap joint of the upstream and downstream sides to prevent the expansion of the failure. Under the conditions reinforced with the geomembrane sheet, the overtopping was stabilized, and no seepage was found that required the emergency reinforcement method. Asphalt, concrete, and geomembrane sheet reinforcements have been shown to be capable of delaying failure for about 1 hour and 40 minutes compared to the non-reinforcement conditions. The reinforcement method is considered to be a very effective method to prevent disasters during overtopping. The pore water pressure can be used as useful data to predict the risk of failure at an embankment.
It is known that individual factors as cognitive, perception, emotion, and motivation may greatly influence on recovery from neurologic region. This study was to investigate the effects of environmental reinforcement through motivation to perform the tasks voluntarily on motor and cognition function in rats with focal ischemic brain injury. Focal ischemic brain injury was induced in Sprague-Dawley rats (15 rats, $250{\pm}50$ g) through middle cerebral artery occlusion (MCAo). And then, experiment groups were randomly divided into three groups; The control group: MCAo induction ($n_1$=5), the environmental reinforcement (ER) group: the application for ER after MCAo induction ($n_2$=5), the environmental reinforcement through motivation (ERM) group: the application for ERM after MCAo induction ($n_3$=5). The climbing test (CT) and the modified limb placing tests (MLPTs) to measure the motor function and the Morris water maze acquisition test (MWMAT) and the Morris water maze retention test (MWMRT) to measure the cognitive function were performed. For the CT, the ERM group was significantly larger than the ER group. For the MLPTs, the ERM group was significantly decreased compared to other groups. For the MWMAT, the time to find the circular platform in the ERM group significantly decreased compared to other groups. For the MWMRT, the time to dwell on the quadrant circular platform in the ERM group was significantly increased compared to other groups. These results suggested that the ERM could improve the motor and cognitive functions in the rats with focal ischemic brain injury.
Journal of the Korean Society of Environmental Restoration Technology
/
v.9
no.3
/
pp.76-81
/
2006
The reinforcement of soil shear strength by nylon net as substitute materials simulating a fine root system was evaluated by soil strength parameters(apparent cohesion(c) and internal friction angle(tan${\phi}$), using simple shear tester which clearly depicts shear deformation and controls soil suction. And the results of shear test by using bamboo as a substitute materials simulating a main root system and using nylon net as a substitute materials simulating a fine root system were compared. The reinforcement of soil strength by nylon net are expressed by apparent cohesion more than internal friction angle. In addition the increment of apparent cohesion by nylon net reached a peak in suction 60 $cmH_2O$. Different from with bamboo, the possibility of the change on internal friction angle(tan${\phi}$) caused by the soil water condition was shown in shear strain 20% condition. These results show that the mechanism of reinforcement by substitute materials simulating root system may be different in the condition of various soil water content.
Kim, Young-Ik;Yeon, Kyu-Seok;Kim, Ki-Sung;Jeong, Jong-Woo;Kim, Yong-Seong
Journal of The Korean Society of Agricultural Engineers
/
v.53
no.2
/
pp.27-33
/
2011
This study is a preliminary investigation into the development of a construction method that will protect a reservoir even during over flows caused by severe flooding. Through hydraulic modeling tests, the destructive phenomena caused by spillway-junction scour during reservoir overflow were modeled, and the effects on the embankment during such an overflow and the spillway-junction movements are discussed. The reservoir destruction model used the Tanbu reservoir, located in Gangwondo Chuncheon-si Namsanmyeon (H=22 m, L=115 m), as the model reservoir and created an embankment with a 1/60 ratio. We review the spillway-junction safety factor during overflow and embankment movement following reinforcement measures for three different cases: no reinforcement, cemented sand and gravel (CSG) reinforcement and water-blocking sheet reinforcement. The results of this study confirmed that when the spillway-junction is exposed to soil, it is very vulnerable to overflow and that a water-blocking sheet or CSG reinforcement are very effective measures in preventing embankment destruction in the long-term period.
Jo, Byung Wan;Kang, Seok Won;Park, Cheol;Kim, Jang Wook
Journal of the Korea institute for structural maintenance and inspection
/
v.17
no.3
/
pp.65-73
/
2013
Recently the exterior attaching reinforcement method is being often used by using FRP (Fiber Reinforced Polymer) as a method of strengthening concrete structure. this FRP exterior attaching reinforcement method has several advantages like high intensity, stiffness, good durability and easy installment comparing to its weight. but its structure is airtight covered by reinforcement material whose water permeability is low and water can't be discharged, thus it may provoke a damage to the structure after a long while. the main purposes of this study are to develop GFRP reinforcement material which can discharge the surface water properly and to measure its special functions. for this, we have changed the normal reinforcement material to water permeable structure and measured its water permeance modulus by an indoor test which shows the process of water permeance with the parameter of contained GFRP quantity. also tried to verify the measured value of the water permeance modulus in theory by analyzing the numbers on water permeance process. the test result showed that the biggest quantity of water, 0.5129 g/h $m^2$ was discharged when the fiber contained quantity reached at 75% and the tensile strength was also biggest by 476.6MPa at 75%, so it appeared that COSREM GP panel with 75% fiber contained quantity is the best in ventilation and structure.
Interest to basal reinforced piled embankments is increasing recently due to their rapid construction and reliability. A comprehensive parametric study is conducted to determine effects of pile properties, reinforcement stiffness, embankment properties and soft soil properties into settlements, pressures and excess pore water pressure development and dissipations. Results which are obtained by using one-layer reinforcement during construction are compared with the results obtained by using two-layer reinforcement during construction. Finite element method is used during the parametric study. Second layer of reinforcement is placed in five different positions in order to reveal effects of reinforcement position into behaviour. Traffic load is also taken into consideration during the study. Differences between the results without presence of traffic loading and with presence of traffic loading is stated in this the study.
When braced excavation with temporary retaining wall installation, is performed in loose sand with high ground water level boiling may be induced and considerable damage on the excavation works and structures in the vicinity can take place. Recently, for the purpose of reinforcement of ground and cut-off of ground water behind the temporary retaining wall, high pressure jet grouting is widely used. The purpose of this paper is to investigate the effects of jet grouting on ground reinforcement and cut -off of the ground water behind temporary retaining walls for braced excavation. A series of both laboratory and field tests has been performed. The test results show that high pressure jet grouting has sufficient effects on reinforcement of stiffness of ground and retaining wall. The permeability of the improved ground was 10-f_ 10-3cm l s smaller than those of the original ground. Therefore, the effect on cut off of ground water behind temporary retaining walls could be improved by high pressure jet grouting method.
In this paper, a series of centrifuge tests were performed to evaluate the seepage characteristic of reinforced embankment. The centrifuge models simulated an actual embankment reinforced by enlargement of levee cross-section. The centrifuge models have the same conditions except the locations of enlargement with low permeable material : water-side and land-side. In addition, the prototype embankment is constructed on low permeable clay layer. In the case of water-side reinforcement, the reinforced zone makes water head down and the saturated zone of embankment propagates slowly. In the case of land-side reinforcement embankment, the saturated zone enlarged relatively faster but the amount of exit water at land-side toe was very small because of the land-side reinforcement zone. The low permeable clay foundation layer was being continuously saturated by the inflow from the embankment as well as the uplift flow from the permeable layer induced by the excess pore water pressure.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.