• Title/Summary/Keyword: Reinforced foundation

Search Result 425, Processing Time 0.033 seconds

A Study on the Inter-Relational Interpretation of Street Plant Issues - Focus on Central Park Road in Incheon Metropolitan City - (가로수관련 문제유형의 관계론적 해석 - 인천광역시 중앙공원길을 중심으로 -)

  • Hong, Youn-Soon;Chung, Doo-Yong;Choi, Kang-Rim
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.36 no.1
    • /
    • pp.80-89
    • /
    • 2008
  • Generally, trees lining the streets are the most easily accessible green areas in the city and constitute the smallest basic unit in the formation of the urban linear green axis. This study attempts to interpret issues related to city trees from a comprehensive and relational viewpoint. The site of this study is Central Park Street in front of Incheon Metropolitan City Hall. This street is representative of those in Incheon City. This study is an inter-relational interpretation of issues by measuring the vitality of these trees. The following are results of this study: First, the vitality of city trees is higher in those trees growing in natural ground than those growing in plant gratings. This observation can lead to budget savings and increased natural areas in the city. Also, if planter and multi-layering planting methods are introduced where damage to trees is predicted, variation to urban landscape can be achieved while linking to reinforced rearing foundation of street-side trees. Second, there is need for a holistic approach to caring for street-side trees regarding the damage caused by drastic pruning and strong street lights. The typical functions of these trees, like supplying freshness in summer, absorbing solar radiation, and controlling the urban micro-climate are closely related to the vitality of the trees. Accordingly, the function and ecology should be understood holistically, not separately. In this aspect, the functional and ecological use of the multi-layering planting method is effective in protecting pedestrians from vehicles as well. Third, the fallen leaves of monotonous rows of trees have different ecological and functional effects. Not only is the index of greenness in the urban setting increased, but there are also aesthetic and symbolic effects. Fourth, in spite of being the street along which Incheon Metropolitan City Hall, major administrative buildings and Central Park are located, this street does not have its own special identity to discriminate it from other streets. It fulfills only functional criteria based on uniformity. If there is no paradigm shift from today's street system based on vehicles, the role of landscape architecture will be very passive in regards to street-side trees, the minimum unit of urban green. Fifth, on this particular street, many trees were planted in December, which reflects a deficiency of short and long-term strategy, like a street-tree master plan. In this aspect, we still lack a mature culture concerning these trees as a basic unit in urban greenery. Furthermore, there needs to be cultural introspection concerning present administrative practices.

Strength Properties of Wooden Model Retaining Wall Using Preservative Treated Square Timber of Domestic Pinus rigida Miller (리기다소나무 방부 정각재를 이용한 목재 옹벽의 강도 성능 평가)

  • Park, Jun-Chul;Kim, Keon-Ho;Lee, Dong-Heub;Hwang, Won-Joung;Hong, Soon-Il
    • Journal of the Korean Wood Science and Technology
    • /
    • v.38 no.6
    • /
    • pp.532-540
    • /
    • 2010
  • The strength properties of wooden model retaining wall made of pitch pine (Pinus rigida Miller) was evaluated. Three different types of wooden model retaining wall were made of the 11cm square timber treated with CUAZ-2 (Copper Azole). The retaining wall was made into the 4 layers of crossbar and the 3 layers of vertical-bar, of which the size was 86 cm high, 200 cm long and 96 cm wide. Type I was control and in Type II 20 cm vertical-bars and 93 cm vertical-bars were arranged alternately to decrease wood usage. TypeIII was similar to TypeII except that the connection between crossbars was reinforced with the wooden armature. In each type, the strength properties of retaining wall were investigated by horizontal loading test and the deformation of structure by image processing (AICON 3D DPA-PRO system). In horizontal loading test of Type I, Type II and Type III was 63.17, 57.80, and 60.97 kN/m, respectively. The deformation of the top layer in Type II was 1.5 times larger than in Type I and Type III. Consequently, the economic efficiency and strength performance were better in Type III than in Type I and Type II.

The Evaluation on the Governance of Andong International Mask Dance Festival (안동국제탈춤페스티벌의 거버넌스 특성과 평가)

  • Hwang, Hwa-Seok;Lee, Chul-Woo
    • Journal of the Korean association of regional geographers
    • /
    • v.18 no.2
    • /
    • pp.141-160
    • /
    • 2012
  • This paper evaluates the governance of the Andong International Mask Dance Festival. The evaluation focuses on mutual cross-assessment of agents engaging in governance relating to four elements: social justification, reliability, professionalism and transparency. Governance based on co-operative partnership was the essential factor leading to the mask festival's success. Governance of the Andong International Mask Dance Festival in 2011 was privately initiated governance having horizontal and open partnership among festival specialists, civil society organizations, regional business organizations, volunteers and local government, with the Andong Festival Tourism Foundation as the central figure. Three of governance elements were successfully carried through; the exception was transparency. The agents who gave more positive evaluations were those who played leading roles in planning and conducting events, as well as in assessing those events. The reasons for positively assessing the elements are the significance of the festival and the guarantee of agents' participation in social justification; the ability of agents, as well as cognitional and institutional trust in reliability; expert knowledge, capacity to suggest alternatives and duality of business in professionalism; and effective communication, the guarantee of opening of information and information sharing in transparency. To improve the effectiveness of governance, the system for allowing passive agents to contribute usefully should be strengthened. Mutual communication and sharing of information among agents, as well as between agents and residents, also should be more strongly reinforced.

  • PDF

Evaluation of Ultimate Bearing Capacity on Granular Compaction Pile Considering Various Stresses in a Ground (지중응력의 변화를 고려한 조립토 다짐말뚝의 극한지지력 평가)

  • Kang, Yun;Yun, Ji-Yeon;Chang, Weon-Ho;Kim, Hong-Taek
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.2
    • /
    • pp.115-124
    • /
    • 2004
  • Granular compaction pile has the load bearing capacity of the soft ground increase and has the settlement of foundation built on the reinforced soil reduce. The granular compaction group piles also have the consolidation of the soft ground accelerate and prevent the liquefaction caused by earthquake using the granular materials such as sand, gravel, stone etc. However, this method is not widely used in Korea. The granular compaction piles are constructed by grouping them with a raft system. The confining pressure at the center of bulging failure depth is a major variable in estimating the ultimate bearing capacity of the granular compaction piles. Therefore, a share of loading is determined considering the effect of load concentration ratio between the granular compaction piles and surrounding soils, and the variation of the magnitude of the confining pressure. In this study, a method for the determination of the ultimate bearing capacity is proposed to apply a change of the horizontal pressure considering bulging failure depth, surcharge, and loaded area. Also, the ultimate bearing capacity of the granular compaction pile is evaluated on the basis of previous study(Kim et al., 1998) on the estimation of the ultimate bearing capacity and compared with the results obtained from laboratory scale model tests and DEM numerical analysis using the PFC-2D program.

BIM-Based Quantity Takeoff and Cost Estimation Guidelines for Reinforced Concrete Structures (철근콘크리트골조 BIM기반 수량산출 및 견적 가이드라인 수립)

  • Joo, Seon U;Kim, Chee-Kyeong;Kim, Si-Uk;Noh, Jun-Oh
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.6
    • /
    • pp.567-576
    • /
    • 2017
  • The object of this research is an establishment of BIM-based quantity takeoff(QTO) and cost estimation guidelines for reinforcement concrete structures focused on improvement of field applicability in transition period from 2D drawing-based environment to 3D BIM-based environment. Preliminary studies on existing guidelines and standards for BIM modeling, QTO and cost estimation of reinforcement concrete structures are performed, and then a standardization of BIM-based cost estimation process is proposed through comparative analysis between 2D drawing-based cost estimation process and 3D BIM-based. In addition, modeling, QTO, and cost estimation processes of cost-BIM model for RC structures are conducted. The contributions of this research and the guidelines suggested by this research are 1) lowering barriers to entity to the new BIM-based environment for small size companies, 2) reducing construction cost by a close estimate, 3) establishing the foundation for integrated management of informations through construction project life cycle, 4) and ultimately, developing the BIM ecosystems.

Evaluation of Deformation Characteristics and Vulnerable Parts according to Loading on Compound Behavior Connector (복합거동연결체의 하중재하에 따른 변형 특성 및 취약부위 산정)

  • Kim, Ki-Sung;Kim, Dong-wook;Ahn, Jun-hyuk
    • Journal of the Society of Disaster Information
    • /
    • v.15 no.4
    • /
    • pp.524-530
    • /
    • 2019
  • Purpose: In this paper, we construct a detailed three-dimensional interface element using a three-dimensional analysis program, and evaluate the composite behavior stability of the connector by applying physical properties such as the characteristics of general members and those of reinforced members Method: The analytical model uses solid elements, including non-linear material behavior, to complete the modeling of beam structures, circular flanges, bolting systems, etc. to the same dimensions as the design drawing, with each member assembled into one composite behavior linkage. In order to more effectively control the uniformity and mesh generation of other element type contact surfaces, the partitioning was performed. Modeled with 50 carbon steel materials. Results: It shows the displacement, deformation, and stress state of each load stage by the contact adjoining part, load loading part, fixed end part, and vulnerable anticipated part by member, and after displacement, deformation, The effect of the stress distribution was verified and the validity of the design was verified. Conclusion: Therefore, if the design support of the micro pile is determined based on this result, it is possible to identify the Vulnerable Parts of the composite behavior connector and the degree of reinforcement.

Development of Work Breakdown Structure and Analysis of Precedence Relations by Activity in School Facilities Construction Work (학교시설 건설공사의 작업분류체계 구축 및 단위작업별 선후행 관계 분석)

  • Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.8 no.3
    • /
    • pp.189-200
    • /
    • 2017
  • The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.

Estimation of Resistance Bias Factors for the Ultimate Limit State of Aggregate Pier Reinforced Soil (쇄석다짐말뚝으로 개량된 지반의 극한한계상태에 대한 저항편향계수 산정)

  • Bong, Tae-Ho;Kim, Byoung-Il;Kim, Sung-Ryul
    • Journal of the Korean Geotechnical Society
    • /
    • v.35 no.6
    • /
    • pp.17-26
    • /
    • 2019
  • In this study, the statistical characteristics of the resistance bias factors were analyzed using a high-quality field load test database, and the total resistance bias factors were estimated considering the soil uncertainty and construction errors for the application of the limit state design of aggregate pier foundation. The MLR model by Bong and Kim (2017), which has a higher prediction performance than the previous models was used for estimating the resistance bias factors, and its suitability was evaluated. The chi-square goodness of fit test was performed to estimate the probability distribution of the resistance bias factors, and the normal distribution was found to be most suitable. The total variability in the nominal resistance was estimated including the uncertainty of undrained shear strength and construction errors that can occur during the aggregate pier construction. Finally, the probability distribution of the total resistance bias factors is shown to follow a log-normal distribution. The parameters of the probability distribution according to the coefficient of variation of total resistance bias factors were estimated by Monte Carlo simulation, and their regression equations were proposed for simple application.

An Experimental Study on Reinforcement Method for Reuse of Onshore Wind Turbine Spread Footing Foundations (육상풍력터빈 확대기초의 재사용을 위한 보강방법에 관한 실험적 연구)

  • Song, Sung Hoon;Jeong, Youn Ju;Park, Min Su;Kim, Jeong Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.1
    • /
    • pp.1-11
    • /
    • 2021
  • In order to reuse existing onshore turbine foundations, it is important to redesign and reinforce the existing foundations according to the upgraded tower diameter and turbine load. In the present study, a slab extension reinforcement method and structure details of an anchorage part were examined in consideration of the reuse of spread footings, which are the most widely used foundation type in onshore wind turbine foundations. Experiments were conducted to evaluate the load resistance performance of a reinforced spread footing according to structure details of an anchorage part. The results showed that (1) the strength of an anchorage part could be increased by more than 30 % by adding reinforcement bars in the anchorage part, (2) pile-sleeves attached to an anchor ring contributed to an increase in rotational stiffness by preventing shear slip behavior between the anchor ring and the concrete, and (3) slab connectors contributed to an increase in the strength and deformation capacity by preventing the separation of new and old concrete slabs.

A study on platform-based preliminary design guidelines associated with the behaviour of piles to adjacent tunnelling (터널근접시공에 의한 말뚝의 거동을 고려한 플랫폼 기반의 예비 설계 가이드라인에 대한 연구)

  • Jeon, Young-Jin;Lee, Gyu-Seol;Lee, Jae-Cheol;Batbuyan, Chinzorig;Lee, Cheol-Ju
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.2
    • /
    • pp.129-151
    • /
    • 2022
  • In the current work, a series of three-dimensional finite element analyses have been carried out to understand the behaviour of piles when the adjacent tunnelling passes underneath grouped piles with a reinforced pile cap. In the current study, the numerical analysis studied the computed results regarding the ground reinforcement condition between the tunnel and pile foundation. In addition, several key issues, such as the pile settlements, the axial pile forces, the shear stresses and the relative displacements have been thoroughly analysed, and the IoT platform based preliminary design guidelines were also presented. The pile head settlements of the nearest pile from the tunnel without the ground reinforcement increased by about 70% compared to the farthest pile from the tunnel with the maximum level of reinforcement. The quality management factor data of the piles were provided as API (Application Programming Interface) of various forms by the collection and refinement. Hence it has been shown that it would be important to provide the appropriate API by defining the each of data flow process when the data were created. The behaviour of the grouped piles with the pile cap, depending on the amount of ground reinforcement, has been extensively analysed, and the IoT platform regarding the quality management of piles has been suggested.