• Title/Summary/Keyword: Regional water supply systems

Search Result 51, Processing Time 0.025 seconds

Hydraulic Adequacy of Connection Pipes in Water Supply Systems for Contingencies (비상시 용수공급을 위한 상수도 연계관로의 수리적 적정성 평가)

  • Han, Wanseob;Jung, Kwansoo;Kim, Juhwan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.6
    • /
    • pp.679-687
    • /
    • 2013
  • Although stable and safe drinking water supply to the customers is a basic function of multi-regional water supply systems in Korea, most systems have their vulnerabilities in emergency time due to the branch-type. Application of connections from the other water supply system can provide a solutions for these tentative problems. This paper describes reduction planning of water supply accidents that can minimize a service interruption to customers in multi-regional water supply system by connecting pipe lines between local water supply systems in Mokpo city areas. The result of this study shows that Juam dam multi-regional water supply systems can cover all of the water shortage in southern parts of Jeonnam multi-regional water supply systems by transmitting water through connected pipes between local networks. This can be effective to supply water interactively in various contingencies, when a pipe line accident occurs in southern area of Jeonnam multi-regional water supply systems. On the contrary, southern area of Jeonnam multi-regional water supply systems can cover 99.5 %($62,500m^3/day$) of the water shortage of Juam dam multi-regional water supply systems when service interruptions caused by various pipe accidents occur in the system.

Feasibility Study on the Conjunctive Operation of Water Transmission Systems from Multiple Source with Applying EPAnet (수리해석(水理解析) 모형(模型)을 이용한 다수원(多水源) 송수계통(送水系統)의 연계(連繫) 운영(運營) 방안(方案) 경제성(經濟性) 평가(評價) - 거제시(市)를 대상(對象)으로 -)

  • Ryu, Tae-Sang;Ha, Sung-Ryong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.21 no.5
    • /
    • pp.609-619
    • /
    • 2007
  • The objective of this paper is to evaluate the feasibility of conjunctive Operation between Multi-regional water supply networks from multiple source as a effective way to meet two conditions: to minimize the electric cost for providing water demanded and meet the water flow rate for satisfying customers. EPAnet Model is used to calculate a hydraulic water distribution condition based on an integrated operation of water supply systems located in short distance. The modeling was conducted on several simulation cases including the individual operation by existing inter-regional water supply networks within short distance, the conjunctive operation of more than two existing networks with valve fully closed and full open constraint. As a study distribution system, water supplying systems of the Geojae-city in the Geongsang Namdo Province was selected and investigated. It was found that a well-allocated water supply scheme based on a conjunctive operation promises to save the electric cost and satisfy all operational goals such as stability and revenues during the period. The result such as unit district costs, pareto optimum pump combination sets will be applied to the optimization for a conjunctive operation of existing inter-regional water supply networks within short distance.

A Study on the Total Head Decision of Pump for Regional Water Supply Facilities (광역상수도용 펌프의 전양정 결정에 관한 연구)

  • Kim, Kyung-Yup;Suh, Sang-Ho;Lee, Jung-Woo;Roh, Hyung-Woon;Kim, Sang-Gyun
    • 유체기계공업학회:학술대회논문집
    • /
    • 2001.11a
    • /
    • pp.165-170
    • /
    • 2001
  • An extensive range of pumping facilities are employed in the regional water supply system in metropolitan areas, and optimization and the systematic combination of the Pump facilities have direct bearing on the stability and economy of the water supply system concerned. These systems must be able to guarantee stability, efficiency and offer high reliability. Preparation of metropolitan area regional water supply system construction project must include a basic plan which takes into account the suitability of pumping facilities to be used, the environment in which facilities will be installed, man-power requirements and basic operational and management policies. This paper contains over-all analysis of the management of metropolitan area regional water supply systems as like Jayang, Paldang 1st pump station. In the study, it aims to prepare counterplan which will be operated and managed the pump upon the operational conditions and to suggest the proposal for water facilities codes to decides total head of pump in Korea.

  • PDF

Development of Water Demand Forecasting Simulator and Performance Evaluation (단기 물 수요예측 시뮬레이터 개발과 예측 알고리즘 성능평가)

  • Shin, Gang-Wook;Kim, Ju-Hwan;Yang, Jae-Rheen;Hong, Sung-Taek
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.25 no.4
    • /
    • pp.581-589
    • /
    • 2011
  • Generally, treated water or raw water is transported into storage reservoirs which are receiving facilities of local governments from multi-regional water supply systems. A water supply control and operation center is operated not only to manage the water facilities more economically and efficiently but also to mitigate the shortage of water resources due to the increase in water consumption. To achieve the goal, important information such as the flow-rate in the systems, water levels of storage reservoirs or tanks, and pump-operation schedule should be considered based on the resonable water demand forecasting. However, it is difficult to acquire the pattern of water demand used in local government, since the operating information is not shared between multi-regional and local water systems. The pattern of water demand is irregular and unpredictable. Also, additional changes such as an abrupt accident and frequent changes of electric power rates could occur. Consequently, it is not easy to forecast accurate water demands. Therefore, it is necessary to introduce a short-term water demands forecasting and to develop an application of the forecasting models. In this study, the forecasting simulator for water demand is developed based on mathematical and neural network methods as linear and non-linear models to implement the optimal water demands forecasting. It is shown that MLP(Multi-Layered Perceptron) and ANFIS(Adaptive Neuro-Fuzzy Inference System) can be applied to obtain better forecasting results in multi-regional water supply systems with a large scale and local water supply systems with small or medium scale than conventional methods, respectively.

Evaluation and Analysis of Characteristics for Hazen-Williams C Based on Measured Data in Multi-Regional Water Supply Systems (광역상수도 실측자료를 활용한 유속계수 평가 및 특성 분석)

  • Kim, Bumjun;Choi, Myungwon;Kim, Gilho;Kim, Hungsoo
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.30 no.2
    • /
    • pp.197-206
    • /
    • 2016
  • Although the Hazen-Williams C factors are very important in the design, operation, and maintenance of water supply pipes, sufficient studies for them have been not reported in korea, which are based on experiments or measured data. Because of this, we have estimated C factors by measurement considering constraints in time precise safety diagnosis for multi-regional water supply system were performed. In this study, we confirmed constraints and variables characteristics of Hazen-Williams equation, and collected reliable C factors data of 174 by measurement, and analyzed their characteristics. According to collected data, the average value is 115.35, which is almost equal to the value of design standard or a little higher than it in korea. Also, among the equations suggested to determine C factor in the past, the C factors calculated by Sharp and Walski equation was closest to them in this study. In addition, to analyze collected C factors, use year and pipe diameter having high correlation with them were respectively divided into there categories. Analysis results showed that C factors evidently decreases depending on increases in use year, on the other hand, size of pipe diameter is proportional to value of them. In conclusion, this research showing evaluation and characteristics for C factors based on measured data will be used as practical reference in determining C factor in multi-regional water supply systems at a later date.

A Study on the Pump System Design Optimization for Regional Water Supply Facilities (광역상수도용 펌프의 규격 최적결정방법에 관한 연구)

  • Roh, Hyung-woon;Suh, Sang-Ho;Kim, Kyung-Yup;Kim, Sung-Won;Kim, Il-Soo;Park, Jong-Moon;Park, HeeKyung;Park, No-Suk;Lee, Bong-Joo;Lee, Jeung-Woo;Lee, Young-Bum;Lee, Young-Ho;Kim, Sang-Gyun
    • 유체기계공업학회:학술대회논문집
    • /
    • 2001.11a
    • /
    • pp.159-164
    • /
    • 2001
  • An extensive range of pumping facilities are employed in the regional water supply system in metropolitan areas, and optimization and the systematic combination of the pump facilities have direct bearing on the stability and economy of the water supply system concerned. These systems must be able to guarantee stability, efficiency and offer high reliability. Preparation of metropolitan area regional water supply system construction project must include a basic plan which takes into account the suitability of pumping facilities to be used, the environment in which facilities will be installed, man-power requirements and basic operational and management policies. This paper contains over-all analysis of the management of metropolitan area regional water supply systems and highlights the cause of Inefficiency and energy waste and puts forward a remedial plan of action. In addition, pump/motor specification programs were developed using Visual Basic to assist selection of the same.

  • PDF

Application of analytic hierarchy process technique for selecting a hydrothermal energy site (수열에너지 입지 선정을 위한 계층화분석법의 적용)

  • Joohyun Ahn;Suwan Park;Changhyun Oh
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.38 no.2
    • /
    • pp.69-81
    • /
    • 2024
  • In this study, an evaluation system that can be used to evaluate the feasibility of developing and supplying hydrothermal energy for the operation of large-scale complex facilities was developed. To this end, this study derived factors to be considered when selecting a location for the use of hydrothermal energy using raw water from multi-purpose dams and regional water supply systems through literature survey and expert interviews. The evaluation indicators derived from this study are divided into four sectors: hydrothermal energy utilization factors, location factors, planning factors, and disaster safety factors, and are composed of 10 mid-level indicators and 34 detailed planning indicators. The relative importance of all factors was derived using the Analytic Hierarchy Process (AHP) technique, and the developed evaluation indicators and relative importance were applied to four multi-purpose dam regions in the country. As a result, it was found that in the development and use of hydrothermal energy utilizing regional raw water supply line the urban planning conditions of the supply site can have a greater impact on the location selection results than the hydrothermal energy development itself. Due to the characteristics of the evaluation indicators developed in this study and their nature as comprehensive indicators, it is believed that the results should be applied to determine the overall adequacy of site selection in the early stages of hydrothermal energy development. In the future, it is believed that it will be necessary to analyze the problems in supplying and operating hydrothermal energy using raw water from multi-purpose dams and regional water resources. Based on the analysis the evaluation system developed in this study is expected to be improved and supplemented.

Simulation of Water Redistribution for the Resized Beneficiary Area of a Large Scale Agricultural Reservoir (대규모 농업용저수지 수혜면적 변화에 따른 효율적 용수재분배 모의)

  • Sung, Muhong;Jeung, Minhyuk;Beom, Jina;Park, Taesun;Lee, Jaenam;Jung, Hyoungmo;Kim, Youngjoo;Yoo, Seunghwan;Yoon, Kwangsik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.63 no.3
    • /
    • pp.1-12
    • /
    • 2021
  • Optimal water management is to efficiently and equally supply an appropriate amount of water by using irrigation facilities. Therefore, it is necessary to evaluate water supply capacity through distribution simulation between the designed distribution rate and re-distributed rate according to the changed farming conditions. In this study, we recalculated the agricultural water supply amount of Geumcheon main canal, which beneficiary area was reduced due to the development of Gwangju-Jeonnam innovation city, and we constructed a canal network using the SWMM model to simulate the change in supply rate of each main canal according to the re-distributed rate. Even though the supply amount of the Geumcheon main canal was reduced from 1.20 m3/s to 0.90 m3/s, it showed a similar supply rate to the current, and the reduced quantity could be supplied to the rest of the main canal. As a result, the arrival time at the ends of all main canal, except for the Geumcheon main canal, decreased from 1 to 3 hours, and the supply rate increased from 4 to 17.0% at the main canal located at the end of the beneficiary area of Naju reservoir.

Development of Pump/Motor Selection Program for Optimized Pump Decision of the Regional Water Supply Facilities (광역상수도용 펌프의 최적결정을 위한 펌프/모터 선정 프로그램 개발)

  • Roh, Hyung-Woon;Kim, Jae-Soo;Park, Gil-Moon;Suh, Sang-Ho;Lee, Young-Ho
    • The KSFM Journal of Fluid Machinery
    • /
    • v.4 no.4 s.13
    • /
    • pp.22-27
    • /
    • 2001
  • The pump/motor selection program for optimized selection of regional water supply facilities was developed based on a flowchart compiled from basic operational data, total head requirement, initial pump/motor specification selection etc. This program was developed in Visual Basic. The program accepts, as in the flowchart, operational requirements of pumps and other system requirements, and calculates specific speed based on flow rate, total head and rotational speed. Then the calculated specific speed is used to select pump types and speed prior to determining likelihood of cavitation occurring at the calculated NPSH. Power requirement is then calculated for safe operation of pump to assist final pump selection. Test results of the program match very closely to the design values of Paldang intake pump station(3rd stage) proving that the program can be used as an effective and practical aid for designing new regional water supply systems.

  • PDF

A Economic Feasibility Study on Environmental Ecology Flow Supply Plan using Agricultural Reservoir - Focused on Dongbok River - (농업용저수지를 이용한 환경생태유량 확보방안 경제성 비교 연구 - 동복천을 중심으로 -)

  • Park, Jin-hyeon;Ko, Jae han;Sung, Mu-hong;Jung, Hyoung-mo;Park, Tae-sun;Kwak, Yeong Cheol;Choi, Woo-young;Boem, Jina;Jeung, Minhyuk;Yoo, Seung-hwan;Yoon, Kwang-sik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.61 no.5
    • /
    • pp.33-47
    • /
    • 2019
  • The environmental ecological flow (EEF) of stream or river will be designated according to the enforcement of the Water Environment Preservation Act. Previous researches by Ministry of Environment have proposed agricultural reservoirs as alternative resources to secure river flow where multi-purpose dam does not exist. However, agricultural reservoirs are constructed for the supply of agricultural water, and in fact, there is not a sufficient amount of water to be supplied to rivers as EEF. Therefore, this study examines the economic feasibility of securing EEF through the remodeling or construction of agricultural reservoirs. We investigated water balance of reservoir through simulation of three types of water supply demands such as agricultural water, agricultural water and river maintenance flow, and agricultural water and environmental ecology flow. The economics analysis was conducted on water supply demands and corresponding remodeling or construction of reservoirs. As a result, it was found that the method of securing through heightening existing reservoir enhancement is economically feasible. However, it was not possible to secure all the amount of the EEF due to the size limitation of existing reservoirs or constrain of the watershed for newly built reservoir. Therefore, in order to secure all of the EEF, the utilization of other alternatives as well as agricultural reservoirs should be considered. This study demonstrated the method of economical feasibility study of securing river maintenace flow and EEF using agricultural reservoirs and other considerations.