• 제목/요약/키워드: Reduction of construction duration

검색결과 68건 처리시간 0.026초

PROJECT SCHEDULING WITH START-TIME DEPENDENT COST AND IMPRECISE DURATION

  • Siamak Haji Yakhchali
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.468-473
    • /
    • 2011
  • The goal of a project manager is generally to minimize the cost of the project and also to cope with uncertainty. This paper deals with the problem of project scheduling a set of activities satisfying precedence constraints in order to minimize the sum of the costs associated with the starting times of the activities in the network with imprecise activity durations, represented by means of interval or fuzzy numbers. So far this problem has been completely solved by several authors when the activities durations have crisp values. However, they do not consider the imprecision in activity durations in their models. Here the framework of possibility theory is proposed to solve this problem. In fuzzy arithmetic, usually, the interval calculations are used for the aim of complexity reduction and simplification. Thus the case of interval-valued durations is first addressed, and then extended to fuzzy intervals. A numerical example is used to illustrate the developed concept.

  • PDF

건설 신기술의 원가산정기준 개선방안에 대한 연구 (A Study of Improvements in the Standards of Cost Estimate for the New Excellent Technology in Construction)

  • 이주현;태용호;백승호;김경민
    • 한국건설관리학회논문집
    • /
    • 제23권5호
    • /
    • pp.65-76
    • /
    • 2022
  • 국내 건설기술의 발전을 도모하고 국가경쟁력을 제고하기 위한 목적으로 1989년 도입된 건설 신기술 지정제도는 심사과정에서 신기술의 원가계산서를 검토하고, 설계·시공 공사비, 유지관리비 등 비용절감효과와 공사기간 단축 효과를 경제성 항목으로 평가하고 있다. 그러나 이 과정에서 고유기술에 대하여 공사비산정기준관리기관과 신기술 개발자간의 의견차이가 빈번히 발생하고 있으며, 또한 현행 신기술에 대한 원가산정기준이 단위수량당 소요량만을 제시하는 방식으로 생산성에 대한 정보가 부재하여 기존 유사 기술과의 공사기간에 대한 객관적인 비교가 어려운 실정이다. 본 연구에서는 건설 신기술 심사 시 원가산정기준 검토절차와 심사기준, 신기술 품셈 작성방법 등 현황을 분석하고 해외 원가산정기준과 비교하여 현행 건설 신기술의 원가산정기준 개선방안을 제시하였다. 제시한 개선방안은 작업조 기반의 생산성 정보를 제공하고, 적용단가를 제시하여 원가기준의 투명성을 확보할 수 있도록 구성하였으며, 신기술의 특성을 고려하여 재료비와 기계경비에 대한 원가정보 역시 제공할 수 있도록 하였다. 본 연구의 개선된 원가산정 기준을 통해 발주자에게 신기술에 대한 원가정보를 현행보다 세부적으로 제공하고, 공사비 산정 과정을 보다 간소화함으로써 건설 신기술의 활용과 현장적용성을 향상시킬 수 있으리라 기대된다.

건설 공종별 친환경 시공 관리 방안 (A Study of the Sustainable Management Method for Construction phase)

  • 박지호;김태경;김경래
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.961-966
    • /
    • 2007
  • 최근 환경에 대한 관심과 규제가 강화되고 있는 가운데, 건설 산업에서도 환경친화형 건축에 대한 관심이 증가하고 있다. 그러나 지금까지의 환경친화형 건축에 대한 연구가 건축물의 라이프사이클 상의 자재생산 단계나 유지/보수 등의 사용단계에 집중되어 있어 시공단계에 관한 연구는 미비한 실정이다. 특히 실제 공사현장 주변의 정량화할 수 없는 환경 저해요인이 산재해 있으며, 공사현장에서 최소한의 법적 기준 이외의 환경 공해 저감 노력이 미비하며, 친환경 공사에 대한 인식조차 부족한 실정이다. 본 논문은 시공단계에서 다양한 공종별로 발생하는 환경 부하 요인들을 저감하기 위해 관리해야할 요인들의 범주를 설정하고 환경 저해요인들을 공종별로 분석하고, 공사기간의 유동적인 조절을 통해 이들의 배출을 줄이고, 효율적으로 관리하는 방안을 제시하고자 한다.

  • PDF

건설 안전관리를 위한 실시간 위치추적(RTLS)기술 개발 (Development of Real-Time Locating System for Construction Safety Management)

  • 이광표;이현수;박문서;김현수;백윤주
    • 한국건설관리학회논문집
    • /
    • 제11권2호
    • /
    • pp.106-115
    • /
    • 2010
  • 최근 건설 산업의 규모가 대규모, 초고층화 됨에 따라 공기단축, 원가절감, 품질항상 등의 각종 관리 분야에 대한 더욱 능률적인 관리 방법이 요구되고 있다. 이러한 요구사항과 맞물려 현재 건설 산업에서는 이를 지원하기 위한 방법의 일환으로 IT산업과의 연계를 통한 해결책이 점차 설득력을 얻어하고 있다. 최근 Bar Code, Personal Digital Assistant(PDA), Global Positioning System(GPS), Radio Frequency Identification(RFID) 등의 다양한 IT기술들이 그 해결방안으로 개발되고 있다. 본 연구는 이러한 다양한 IT기술 중, 최근 여러 분야에 대한 적용 가능성을 인정받은 실시간 위치추적 기술(RTLS)에 대해 분석하고, 이를 바탕으로 건설 현장에 적용 가능한 위치추적 기술을 개발하며, 검증하고자 한다. 본 연구에서 개발하고자 하는 위치추적 기술은 작업자 및 기인물의 실시간 관리를 통하여 재해를 예방하기 위한 것으로 추후 안전관리 분야에 효과적인 적용 가능성을 예상하며, 이 외에도 건설 현장에 적합한 위치추적 기술이 개발된다면 건설 자재 실시간 모니터링 분야, 건설 자동화 분야, 건설 품질 분야, 유지 관리 분야 등에 있어서도 효과적인 적용이 가능할 것으로 예상된다.

Methodology for Developing Standard Schedule Activities for Nuclear Power Plant Construction through Probabilistic Coherence Analysis

  • kim, Woojoong
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.8-13
    • /
    • 2017
  • Nuclear power plant (NPP) constructions are large scale projects that are executed for several years, and schedule control utilizing various schedules is a critically important factor. Recently Korea independently developed the Advanced Power Reactor (APR) 1400 and is building nuclear facilities applying this new reactor type. The construction of Shin-Kori NPP (SKN) Unit 3, which adopted the APR1400, was completed and commercial operation has begun, while, SKN 4, Shin-Hanul NPP (SHN) Units 1&2, and SKN 5&6 are currently under construction. Prior to the development of the APR1400, Korea built 24 reactors and accumulated the schedule data of various reactor types which provided the foundation for schedule reduction to be possible. However, as there is no schedule development and review system established based on the standard schedule data (standard activities, durations, etc.) by reactor type, the process for developing the schedule for new builds is low in efficiency consuming much time and manpower. Also all construction data has been accumulated based on schedule activities. But because the connectivity of activities between projects is low, it is difficult to utilize such accumulated data (causes for schedule delay, causes for design changes, etc.) in new build projects. Due to such reasons, issues continue to arise in the process of developing standard schedule activities and a standard schedule for nuclear power plant construction. In order to develop a standard schedule for NPP construction, i) the development of an NPP standard schedule activity list, ii) development of the connection logic of NPP standard schedule activities, iii) development of NPP standard schedule activity resources and duration, and iv) integration of schedule data need to be performed. In this paper, an analysis was made on the coherence of schedule activity descriptions of existing NPPs by applying the probabilistic methodology on activities with low connectivity due to the utilization of the numbering system of four APR1400 reactors (SHN 1&2 and SKN 3&4).This study also describes the method for developing a standard schedule activity list and connectivity measures by extracting same and/or similar schedule activities.

  • PDF

수질오염총량관리제의 성과평가: 개발/삭감계획의 이행실적 및 단위유역의 수질 현황 (Performance Appraisal of Total Maximum Daily Loads: Performance on Development/Reduction Plan and Water Quality Status of Unit Watershed)

  • 박재홍;박준대;류덕희;정동일
    • 한국물환경학회지
    • /
    • 제25권4호
    • /
    • pp.481-493
    • /
    • 2009
  • This study was conducted to performance appraisal of Total Maximum Daily Loads (TMDLs), especially in terms of performance on development & reduction plan and water quality status of unit watershed. Because load allocations for pollution sources were predicted redundantly by uncertainty of prediction, TMDLs master plan has been frequently changed to acquire load allocation for local development. Therefore, It need to be developed more resonable prediction techniques of water pollution sources to preventing the frequent change. It is suggested that the reduction amount have to be distributed properly during the planning period. In other words, it has not to be concentrated on the specific year (especially final year of the planning period). The reason why, if the reduction amount concentrate on the final year of the planning period, allotment loading amount could not be achieved in some cases (e.g., insufficiency of budget, extension of construction duration). If the development plan was developed including uncertain developments, it is necessary to be developed reduction plan considered with them. However, some of the plans in the reduction plan could not be accomplished in some case. Because, it is not considered financial abilities of local governments. Consequently, development plan must be accomplished to avoid uncertain developments, and to consider financial assistance to support the implementation of effective plan. Water quality has been improved in many unit watersheds due to the TMDLs, especially in geum river and yeongsang/seomjin river.

차세대 스마트형 PMIS 시스템 개발 (The Development of Next Generation Smart PMIS System)

  • 박경모;임철우;김창덕;정형석
    • 한국건설관리학회논문집
    • /
    • 제14권2호
    • /
    • pp.117-130
    • /
    • 2013
  • 최근 건설 산업의 경향은 대형화, 국제화 되고 발주자는 사업수행기간의 단축을 요구하는 환경 속에서 건설 현장의 다양한 업무내용을 효과적으로 관리하는 일은 매우 어려운 과제가 되어가고 있다. 이러한 문제를 해결하기 위한 대안으로 선진외국에 2000년대 초부터 지속적으로 공정관리/시공관리/자원관리/노무관리/문서관리 등의 다양한 공사정보를 상호 교환할 수 있는 Web 기반의 PMIS 개발에 주력해왔다. 하지만, 최근 들어 스마트폰과 태블릿 PC와 같은 IT기기의 활발한 보급과 더불어 현장에서도 클라이언트 PC를 통한 PMIS 접근 방식보다 신속하게 다양한 공정변화에 신속히 대응할 수 있는 스마트형 PMIS 개발에 대한 기대가 높아지고 있는 시점이다. 따라서, 본 연구는 기존 Web 기반의 PMIS를 현장 작업자가 공사현장 또는 이동 중에도 태블릿 PC와 스마트폰과 연계하여 활용하는 차세대 스마트형 PMIS를 개발하고자 하며, 이러한 차세대 스마트형 PMIS의 개발 과정과 개발된 주요기능을 소개하는 데에 목적이 있다.

적산온도법을 이용한 콘크리트 조기강도 예측에 관한 실험적 연구 (An Experimental Study on the Early Strength Prediction of Concrete by Maturity Method)

  • 권해원;배연기;김석일;지석원;이재삼;송인명
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2008년도 춘계 학술발표회 제20권1호
    • /
    • pp.753-756
    • /
    • 2008
  • 현재 국내에서는 후분양제도 도입등에 따라 공기단축이 중요관점으로 대두되고 있다. 철근콘크리트 공사에서 공기단축을 위해서는 콘크리트 타설 후 탈형시기가 매우 중요하게 작용하게 되는데 이를 위해 거푸집 탈형을 위한 조기압축강도 특성을 비파괴 시험 중 하나인 적산온도법을 일부 적용하고 있다. 적산온도법은 온도와 재령과의 관계로 압축강도를 추정하는 방법으로, 플라우만에 의해 한중기 매스콘크리트의 구조물강도를 예측하고자 연구된 것이다. 따라서, 조기압축강도양상과는 다소 다른 결과를 보일 수 있다. 또한 적산온도법은 시멘트의 종류 그리고 배합 등에 따라 온도의 영향이 다르게 적용될 수 있으므로, 이에 대한 연구가 필요한 실정이다. 따라서 본 실험적 연구에서는 조기강도 예측을 위해 결합재 OPC100%와 OPC80+BSC20%에 대해 W/B비를 32, 35, 38, 40%로 다양화하여, 양생환경을 온도 20도씨와 25도씨에 12, 14, 16, 18, 20, 22, 24, 36시간 동안 양생한 후 압축강도를 측정한 결과를 바탕으로 현재 국내에서 주로 사용하고 있는 적산온도법을 적용하여 그 상관관계를 살펴보도록 한다.

  • PDF

모듈러 건축의 현황과 활용에 관한 기초연구 - 사례조사 분석을 중심으로 - (A Basic Study on the Application of Modular Construction - Focused on the Analysis of Case Study -)

  • 김재영;이종국
    • 한국주거학회논문집
    • /
    • 제25권4호
    • /
    • pp.39-46
    • /
    • 2014
  • This research was for the investigation and analysis of the illustration of modular construction application which is different use by each school facility since modular construction related examples are rare in domestic situation, and it has a limitation because of its being basic research material for generating the basic form of modular construction. The research results are as followings. First, in case of school facility from illustration investigation results, module measurement of class modulation is as similar as $3m{\times}10m$, but in resident facility the planning of more flexible plane shape can be possible since modules of 6 cases are free and various, and facade form of various types can be appeared by combination of module unit. Second, as a result of the generated characteristics in compared analysis of representative examples, school facilities were highly indicated for movability and duration reduction areas, and the flexibility, economic efficiency, and environment-friendliness was indicated low relatively. Third, the basic planning types of modular construction can be largely divided into layered type, horizontal (straightway) type, and compound type. The layered type has a short traffic line and facility system and is appropriate for the low-rise form unless separate construction method is used since it is susceptible to load. The horizontal type is advantageous for securing an opening since it has wide extent in light but has a long traffic line and facility system. Finally, the compound type can be possible for planning of various forms but needs the combination of various unit modules and traffic line and facility plan for it can be difficult.

Up-Set Coupler 이음철근의 인장특성에 대한 실험적 연구 (An Experimental Study of Tension Properties on New Developed Up-Set Coupler)

  • 심종성;박철우;강태성;김태수
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제12권5호
    • /
    • pp.109-115
    • /
    • 2008
  • 구조물이 초고층화, 대형화 되어감에 따라 철근의 이음방법에 대한 필요성이 증대되고 있다. 현재 일반적으로 건설현장에서는 겹이음을 많이 사용하고 있으나 굵은 직경을 사용한 구조부재의 경우 겹이음 사용 시 피복두께 확보의 어려움으로 부착파괴 및 접합부의 복잡한 배근으로 인한 콘크리트 타설의 시공성 저하 등이 문제가 되고 있다. 또한 압접이음은 철근의 단부를 국부적으로 가열하여 접합하는 방식으로 압접 후 철근의 취약부분이 발생할 수 있으므로 시공현장에서의 철저한 품질관리가 요구되는 단점이 있다. 이러한 단점을 해결하고자 새로운 개념의 Up-set Coupler를 적용하였다. 본 연구에서는 기계적 이음방법 중 철근 선조립공법이나 고강도, 대직경의 철근을 사용하는 PSC구조물의 접합부에서 주로 사용되는 대표적인 이음방법인 Screw Coupler와 Up-set Coupler, 그리고 이음이 없는 철근을 사용하여 각각의 인장특성과 사용성을 실험적으로 연구하고자 한다.