• Title/Summary/Keyword: Reduction Time

Search Result 8,062, Processing Time 0.032 seconds

Evaluation of Noise Decreasing Effects by Structures in Roadside Buffer Green (도로변 완충녹지 구조에 따른 소음저감효과 평가)

  • Kim, Jeong-Ho;Oh, Deuk-Kyun;Yoon, Yong-Han
    • Journal of Environmental Science International
    • /
    • v.24 no.5
    • /
    • pp.647-655
    • /
    • 2015
  • In this study, to targeting Songpa of Seoul, were analyzed the effect on the noise mitigation in roadside buffer green spaces. Noise of Songpa Street buffer green space was determined to be higher during the day than at night. In addition, it was most of 60 db or more. However, the noise reduction function of the buffer green was not greatly affected by time. In the case of noise reduction rate, during the day time it was the order of the mounding type (18.14%)> plain type (5.73%)> slope type (4.08%), And, in the case of night time, it was the order of the mounding type (11.29%)> slope type (10.22%)> plain type (4.42%). Noise reduction rate, all of the daytime, was the highest in the mounding type. As a result of the factors on the amount of reduction of noise, More physical structure is mounding type, green structure is the stratification of green space, and the number of individuals is large, the higher the tree planting density, it is determined that the noise reduction effect is high. Also, factors affecting the noise reduction effect of the day and night were different.

Managerial Factors Influencing Dose Reduction of the Nozzle Dam Installation and Removal Tasks Inside a Steam Generator Water Chamber (증기발생기 수실 노즐댐 설치 및 제거작업의 피폭선량 저감에 영향을 주는 관리요인에 관한 연구)

  • Lee, Dhong Ha
    • Journal of the Ergonomics Society of Korea
    • /
    • v.36 no.5
    • /
    • pp.559-568
    • /
    • 2017
  • Objective: The aim of this study is to investigate the effective managerial factors influencing dose reduction of the nozzle dam installation and removal tasks ranking within top 3 in viewpoint of average collective dose of nuclear power plant maintenance job. Background: International Commission on Radiation Protection (ICRP) recommended to reduce unnecessary dose and to minimize the necessary dose on the participants of maintenance job in radiation fields. Method: Seven sessions of nozzle dam installation and removal task logs yielded a multiple regression model with collective dose as a dependent variable and work time, number of participants, space doses before and after shield as independent variables. From the sessions in which a significant reduction in collective dose occurred, the effective managerial factors were elicited. Results: Work time was the most important factor contributing to collective dose reduction of nozzle dam installation and removal task. Introduction of new technology in nozzle dam design or maintenance job is the most important factor for work time reduction. Conclusion: With extended task logs and big data processing technique, the more accurate prediction model illustrating the relationship between collective dose reduction and effective managerial factors would be developed. Application: The effective managerial factors will be useful to reduce collective dose of decommissioning tasks as well as regular preventive maintenance tasks for a nuclear power plant.

Delayed Reduction of Nasal Bone Fractures

  • Yoon, Han Young;Han, Dong Gil
    • Archives of Craniofacial Surgery
    • /
    • v.17 no.2
    • /
    • pp.51-55
    • /
    • 2016
  • Background: Nasal bone fractures are managed by closed reduction within the 2-week period, and are managed by secondary correction after this time. There is little literature on the delayed reduction for nasal bone fractures beyond the 2-week duration. We report our experience with nasal fractures, which were reduced beyond this period. Methods: A retrospective review was performed for all patients who had undergone closed reduction of isolated nasal bone fracture. Patients were included for having undergone reduction of nasal bone fractures at or more than 2 weeks after the injury. Medical records were reviewed for demographic information, injury mechanism, fracture type, delay in treatment, and cause for delay. Postoperative outcomes were evaluated using computed tomography images. Results: The review identified 10 patients. The average reduction time was 22.1 days. Five of patients underwent reduction between days 15 and 20, and the remaining five patients underwent reduction between days 21 and 41. The postoperative outcomes were excellent in 8 patients and good in 2 patients. Conclusion: Outcomes were superior for nasal fractures with displaced end plates and multiple fracture segments. Our study results appears to support delayed reduction of isolated nasal fractures in the presence of factors that delay bony reunion.

Fast non-local means noise reduction algorithm with acceleration function for improvement of image quality in gamma camera system: A phantom study

  • Park, Chan Rok;Lee, Youngjin
    • Nuclear Engineering and Technology
    • /
    • v.51 no.3
    • /
    • pp.719-722
    • /
    • 2019
  • Gamma-ray images generally suffer from a lot of noise because of low photon detection in the gamma camera system. The purpose of this study is to improve the image quality in gamma-ray images using a gamma camera system with a fast nonlocal means (FNLM) noise reduction algorithm with an acceleration function. The designed FNLM algorithm is based on local region considerations, including the Euclidean distance in the gamma-ray image and use of the encoded information. To evaluate the noise characteristics, the normalized noise power spectrum (NNPS), contrast-to-noise ratio (CNR), and coefficient of variation (COV) were used. According to the NNPS result, the lowest values can be obtained using the FNLM noise reduction algorithm. In addition, when the conventional methods and the FNLM noise reduction algorithm were compared, the average CNR and COV using the proposed algorithm were approximately 2.23 and 7.95 times better than those of the noisy image, respectively. In particular, the image-processing time of the FNLM noise reduction algorithm can achieve the fastest time compared with conventional noise reduction methods. The results of the image qualities related to noise characteristics demonstrated the superiority of the proposed FNLM noise reduction algorithm in a gamma camera system.

The Prediction Model of a Working Pattern According to Working Time Reduction in Construction Sites (근로시간 단축에 따른 건설현장에서의 근로패턴 예측 Model)

  • Kim Hong-Ryul;Yu Il-Han;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.316-322
    • /
    • 2002
  • In case of reducing working time, it is difficult that the construction industry is analyzed far-reaching effects caused by a reduction of working time, by approaching with just the total amount of work. Because it has the properties such as the singularity, the outdoor using, a sense of the season unlike other industries. In order to analyze the effect of a reduction of working time on the construction industry, the example of a reduction of working time in domestic other industries related with it was analyzed intensively first. And an example in Japan, which is similar to our existing related laws and industrial structure among foreign construction industries was analyzed, and a relation with the domestic construction industries and an issue were drown a conclusion. This was applied to a field worker and a related main group participating in a real production. And it showed the prediction model for a working pattern and a dealing plan to prepare in a construction site by predicting a working pattern in the management side of a construction site annually.

  • PDF

The State of Schedule Management and the Recognition of Duration Shortening (공정관리의 실태 및 공기 단축에 대한 인식정도)

  • Kim, Ja-Yeon;Kim, Eui-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.87-94
    • /
    • 2010
  • Construction projects are based on the actual field, so if the construction schedule that is established in the construction plan is delayed or extended for various reasons, construction companies are vulnerable to claims, and thus strive to complete a building within the planned timeline by shortening the construction time. Therefore, this study surveyed technicians in apartment construction in Gwangju, and studied their perceptions of the actual conditions of process control, construction time needs, goals, and methods. The results showed that the organization of the process control department and professional employees was lacking compared to other regions. The need for construction time was perceived as high, while the reduction of the construction cost was perceived as low. Regarding the reduction goal, they perceived highly the preparation for the delay of construction time and various claims, and for the reduction method, they mentioned the extension of working hours and the increase in employees. Based on the results of this study, technicians should consider that a reduction of construction time not only can make up for a delay in construction, but is also closely related to improvements in production through reduction of cost, and increased international competitiveness.

A novel hybrid testing approach for piping systems of industrial plants

  • Bursi, Oreste S.;Abbiati, Giuseppe;Reza, Md S.
    • Smart Structures and Systems
    • /
    • v.14 no.6
    • /
    • pp.1005-1030
    • /
    • 2014
  • The need for assessing dynamic response of typical industrial piping systems subjected to seismic loading motivated the authors to apply model reduction techniques to experimental dynamic substructuring. Initially, a better insight into the dynamic response of the emulated system was provided by means of the principal component analysis. The clear understanding of reduction basis requirements paved the way for the implementation of a number of model reduction techniques aimed at extending the applicability range of the hybrid testing technique beyond its traditional scope. Therefore, several hybrid simulations were performed on a typical full-scale industrial piping system endowed with a number of critical components, like elbows, Tee joints and bolted flange joints, ranging from operational to collapse limit states. Then, the favourable performance of the L-Stable Real-Time compatible time integrator and an effective delay compensation method were also checked throughout the testing campaign. Finally, several aspects of the piping performance were commented and conclusions drawn.

Noise reduction system using time-delay neural network (시간지연 신경회로망을 이용한 잡음제거 시스템)

  • Choi Jae-Seung
    • Journal of the Institute of Electronics Engineers of Korea SP
    • /
    • v.42 no.3 s.303
    • /
    • pp.121-128
    • /
    • 2005
  • On the research field for speech signal, neural network mainly uses for the category classification in speech recognition and applies to signal processing. Accordingly, this paper proposes a noise reduction system using a time-delay neural network, which implements the mapping from the space of speech signal degraded by noise to the space of clean speech signal. It is confirmed that this method is effective for speech degraded not only by white noise but also by colored noise using the noise reduction system, which restores the amplitude component of fast Fourier transform.

Dimension Reduction in Time Series via Partially Quanti ed Principal Componen (부분-수량화를 통한 시계열 자료 분석에서의 차원축소)

  • Park, J.A.;Hwang, S.Y.
    • The Korean Journal of Applied Statistics
    • /
    • v.23 no.5
    • /
    • pp.813-822
    • /
    • 2010
  • We investigate a possible achievement in dimension reduction of time series via partially quantified principal component. Partial quantification technique allows us in modeling to accommodate artificial variable(s) of practical importance which is defined subjectively by the data analyst. Suggested procedures are described and in turn illustrated in detail by analyzing monthly unemployment rates in Korea.

Volume Reduction of Waste Water Sludge using Electrolysis (전기분해를 이용한 하수 슬러지 감량)

  • Lee, Byungheon;Bang, Myunghwan;Kim, Geonha
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.2
    • /
    • pp.264-270
    • /
    • 2006
  • In this research, volume reduction of activated sludge using electrolysis was studied to find an optimum condition using lab scale experiments. Wasted sludge was treated by electrolysis with controlling current density, chloride concentration, electrode distance, and reaction time. Volume of return sludge was reduced by 9.79% in average while maximum was 16.7%. Sludge volume reduction efficiency was affected by current density and reaction time. It was reversely proportional to the electrode distance. Especially current density was effective on the system performance significantly. Electric conductivity, salinity and COD were increased by electrolysis implying sludge disintegrated and converted to COD in part. An empirical equation for total solid removal efficiency by electrolysis was proposed by multiple linear regression analysis as: $TS_{rem}$(%) = 5.534 ${\times}$ current density (A/l) + 0.178 ${\times}$ reaction time (m) + 2.758.