• 제목/요약/키워드: Recovery Cost

검색결과 614건 처리시간 0.034초

MLF를 이용한 손실비용할당을 고려한 송전비용산정방안에 관한 연구 (Transmission Pricing in consideration of Transmission-Loss cost allocation usi)

  • 김강원;정구형;신영균;김발호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 A
    • /
    • pp.652-654
    • /
    • 2003
  • Embedded cost pricing is easy to be applied in the calculation of transmission cost and guarantees perfect recovery of revenue requirement. However, it caused in equity of cost distribution in the restructured electrical market. Though, marginal cost pricing has been studied to be applied to economic signal of members. But it has the cumbersome processes of the revenue reconciliation. This paper presents a new recovery of revenue requirement method that is satisfied with economic signal, using MLF.

  • PDF

분산 저장 블록체인 시스템을 위한 효율적인 결함 내성 향상 기법 (Fault Tolerance Enhancement for Distributed Storage Blockchain Systems)

  • Kim, Junghyun
    • 한국정보통신학회논문지
    • /
    • 제24권11호
    • /
    • pp.1558-1561
    • /
    • 2020
  • In this paper, we propose a blockchain scheme to enhance fault tolerance in distributed storage blockchain systems. Traditional blockchain systems suffer from ever-increasing storage cost. To overcome this problem, distributed storage blockchain techniques have been proposed. Distributed storage blockchain schemes effectively reduce the storage cost, but there are still limitations in reducing recovery cost and fault tolerance. The proposed approach recovers multiple errors within a group by utilizing locally repairable codes with availability. This improves the fault tolerance of the blockchain systems. Simulation results show that the proposed scheme enhances the fault tolerance while minimizing storage cost and recovery cost compared to other state-of-art schemes.

상수도 정수장 오이중 Alum회수 및 재활용에 관한 연구 (A Study on Alum recovery and reuse from the sludge in water treatment plant.)

  • 김관천;노기환;강영식;이치영;류일광
    • 환경위생공학
    • /
    • 제10권1호
    • /
    • pp.86-96
    • /
    • 1995
  • Alum recovery has recently gained more attention because many water utilities need to improve their sludge handling and disposal practices. As part of an overall sludge management program recovery can reduce the amount of solids and allow for reuse of the recovered Alum as a coagulant. This study was examined the effectiveness of Alum recovery from the Sludge at the D water treatment plant in Kwangju city. The results were summarized as follows 1. Alum recovery was obtained sufficiently acidification(An optimum condition was pH2-3) With $H_{2}SO_{4}$ to settled sludge. In this case recovered liquid Alum from sludge of 2.1% solids concentration at pH 2.1 was contains Aluminum $1,602mg/{\ell}$(as $Al_{2}O_{3}$ 0.3% ) and other metal of low level. 2. It was an optimum condition to all reuse of recovered Alum as a coagulant that rate of Commercial Alum:Recovered Alum=$14{\mu}{\ell}/{\ell}{\;}:{\;}200{\mu}{\ell}/{\ell}$ In a result of Jar Tests. 3. It was a result of Alum recovery from sludge, the reduction effect of amount of solids was about 57.4%. 4. If all recovered Alum were reused the reduction effect of solid wastes disposal cost and chemical drug's cost was about 22%.

  • PDF

역삼투-압력지연삼투 조합공정 공정모사 및 비용예측 프로그램 개발 (Development of SWRO-PRO hybrid process simulation and cost estimation program)

  • 최용준;신용현;이상호;김승현
    • 상하수도학회지
    • /
    • 제30권3호
    • /
    • pp.299-312
    • /
    • 2016
  • The main objective of this paper is to develop computer simulation program for performance evaluation and cost estimation of a reverse osmosis (RO) and pressure-retarded osmosis (PRO) hybrid process to propose guidelines for its economic competitiveness use in the field. A solution-diffusion model modified with film theory and a simple cost model was applied to the simulation program. Using the simulation program, the effects of various factors, including the Operating conditions, membrane properties, and cost parameters on the RO and RO-PRO hybrid process performance and cost were examined. The simulation results showed that the RO-PRO hybrid process can be economically competitive with the RO process when electricity cost is more than 0.2 $/kWh, the PRO membrane cost is same as RO membrane cost, the power density is more than $8W/m^2$ and PRO recovery is same as 1/(1-RO recovery).

미래 자원환경지질 분야로서 국가기반시설 리질리언스 연구 동향 분석 (A Review of Critical Infrastructure Resilience Study as the Future Area of Geosciences)

  • 유순영
    • 자원환경지질
    • /
    • 제44권6호
    • /
    • pp.533-539
    • /
    • 2011
  • 미국에서는 재난으로 인한 기반시설물의 피해를 줄이기 위해 국가기반시설 리질리언스 확보가 국가기반시설보호계획에 활용되고 있다. 여기서 "리질리언스"는 재난으로 인한 시스템의 영향을 효율적으로 줄일 수 있는 기반시설 시스템의 능력으로, 리질리언스 비용으로 정량화가 시도되었다. 리질리언스 비용은 시스템 영향과 복구노력을 합한 것으로, 리질리언스 평가 사례는 리질리언스 평가시 복구노력을 고려할 필요가 있음을 보여주고 있다. 본 논문은 리질리언스 비용을 설명하고, 연구 사례를 통해 리질리언스 비용의 평가 방법을 보여주고자 한다.

Novel energy recovery circuit using an address voltage source

  • Yi, Kang-Hyun;Moon, Gun-Woo
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2008년도 하계학술대회 논문집
    • /
    • pp.416-418
    • /
    • 2008
  • Cost effective and high efficiency energy recovery circuit (ERC) using an address voltage source is proposed. Different from prior ERC, the proposed circuit uses a voltage source to charge a panel and a current source to discharge the panel. As a result, it can be achieved zero voltage switching (ZVS) of switches in H-bridge inverter and zero current switching (ZCS) of switches of the ERC. Moreover, the proposed ERC can obtain high efficiency, high performance and the decrease of the cost and the size.

  • PDF

Cost-effective single board PDP sustaining driver with dual resonant method

  • Lim, Hyun-Muk;Eom, Cheol-Hwan;Lee, Jun-Young
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2008년도 하계학술대회 논문집
    • /
    • pp.446-448
    • /
    • 2008
  • A new plasma display panel sustaining driver using single side sustaining technique with the dual resonant method is proposed. Since this circuit enables to reduce switches in energy recovery circuit with keeping voltage stress like that of prior circuit, it can be low cost circuit comparing with a conventional driver. To integrate sustain function into one side with single power source in the driver, a charge pump method is adopted to make negative sustaining voltage and achieve dual resonant energy recovery on sustaining modes.

  • PDF

Cost-effective Single Board PDP Sustaining Driver with Dual Resonant Method

  • Lee, Jun-Young
    • Journal of Power Electronics
    • /
    • 제9권1호
    • /
    • pp.93-99
    • /
    • 2009
  • A new plasma display panel sustaining driver using single side sustaining technique with a dual resonant method is proposed in this paper. Since this circuit enables to keep device voltage stress same as the prior circuit, it can be a low cost circuit compared to a conventional driver. To integrate the sustaining function into one side with a single power source in the driver, a charge pump method is adopted to make negative sustaining voltage and to achieve dual resonant energy recovery on the sustaining modes.

열병합시스템 경제성 평가 프로그램의 개발 및 적용에 관한 연구 (Development and Application of an Economic Assessment Program of Cogeneration Systems)

  • 박차식;김용찬
    • 대한기계학회논문집B
    • /
    • 제22권11호
    • /
    • pp.1547-1554
    • /
    • 1998
  • The object of this study was to develop an economic assessment program for the optimal design of the cogeneration systems composed of combining engine, generator, waste heat recovery exchanger, absorption chiller, and boiler, etc. The energy demand categorized by electric power, heating, cooling and water supply was determined by statistical data of the existing cogeneration systems. An economic assessment was performed by comparing the total cost of cogeneration system with that of non-cogeneration system. The total cost was evaluated by adding initial investment to operational cost considering efficiency of equipment, cost of equipment, fuel and electricity. To confirm the validity of the developed program, a hotel building with an area of $127,960m^2$ was selected, and the simulated results were compared with the measured data. The difference between the simulated and the measured values for the selected hotel building was approximately 12% for annual electric consumption.

열회수장치의 열교환 파이프배치형식별 열교환 성능 비교(II) (Comparision of Heat Exchanging Performance Depending on Different Arrangement of Heat Exchanging Pipe (II))

  • 서원명;강종국;윤용철;김정섭
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 2001년도 학술발표회 발표논문집
    • /
    • pp.281-285
    • /
    • 2001
  • This study was carried out to improve the performance of heat recovery device attached to exhaust gas flue connected to combustion chamber of greenhouse heating system. Three different units were prepared for the comparison of heat recovery performance; AB-type(control unit) is exactly the same with the typical one fabricated for previous study of analyzing heat recovery performance in greenhouse heating system, other two types(C-type and D-type) modified from the control unit are different in the aspects of airflow direction(U-turn airflow) and pipe arrangement. The results are summarized as follows; 1. In the case of Type-AB, when considering the initial cost and current electricity fee required for system operation, it is expected that one or two years at most would be enough to return the whole cost invested. 2. Type-C and Type-D, basically different with Type-AB in the aspect of airflow pattern, are not sensitive to the change of blower capacity with higher than $25\;m^{3}/min$. Therefore, heat recovery performance was not improved so significantly with the increment of blower capacity. This is assumed to be that air flow resistance in high air capacity reduces the heat exchange rate as well. Never the less, compared with control unit, resultant heat recovery rate in Type-C and Type-D were improved by about 5% and 13%, respectively. 3. Desirable blower capacity for these heat recovery units experimented are expected to be about $25\;m^{3}/min$, and at the proper blower capacity, U-turn airflow units showed better heat recovery performance than control unit. But, without regard to the type of heat recovery unit, it is recommended that comprehensive consideration of system's physical factors such as pipe arrangement density, unit pipe length and pipe thickness, etc., are required for the optimization of heat recovery system in the aspects of not only energy conservation but economic system design.

  • PDF