• 제목/요약/키워드: Reasonable Measures

검색결과 256건 처리시간 0.031초

Impact of Tumor Location on the Quality of Life of Patients Undergoing Total or Proximal Gastrectomy

  • Fujisaki, Muneharu;Nomura, Takashi;Yamashita, Hiroharu;Uenosono, Yoshikazu;Fukunaga, Tetsu;Otsuji, Eigo;Takahashi, Masahiro;Matsumoto, Hideo;Oshio, Atsushi;Nakada, Koji
    • Journal of Gastric Cancer
    • /
    • 제22권3호
    • /
    • pp.235-247
    • /
    • 2022
  • Purpose: Most studies have investigated the differences in postgastrectomy quality of life (QOL) based on the surgical procedure or reconstruction method adopted; only a few studies have compared QOL based on tumor location. This large-scale study aims to investigate the differences in QOL between patients with esophagogastric junction cancer (EGJC) and those with upper third gastric cancer (UGC) undergoing the same gastrectomy procedure to evaluate the impact of tumor location on postoperative QOL. Methods: The Postgastrectomy Syndrome Assessment Scale-45 (PGSAS-45) questionnaire was distributed in 70 institutions to 2,364 patients who underwent gastrectomy for EGJC or UGC. A total of 1,909 patients were eligible for the study, and 1,744 patients who underwent total gastrectomy (TG) or proximal gastrectomy (PG) were selected for the final analysis. These patients were divided into EGJC and UGC groups; thereafter, the PGSAS-45 main outcome measures (MOMs) were compared between the two groups for each type of gastrectomy. Results: Among the post-TG patients, only one MOM was significantly better in the UGC group than in the EGJC group. Conversely, among the post-PG patients, postoperative QOL was significantly better in 6 out of 19 MOMs in the UGC group than in the EGJC group. Conclusions: Tumor location had a minimal effect on the postoperative QOL of post-TG patients, whereas among post-PG patients, there were definite differences in postoperative QOL between the two groups. It seems reasonable to conservatively estimate the benefits of PG in patients with EGJC compared to those in patients with UGC.

A rapid and direct method for half value layer calculations for nuclear safety studies using MCNPX Monte Carlo code

  • Tekin, H.O.;ALMisned, Ghada;Issa, Shams A.M.;Zakaly, Hesham M.H.
    • Nuclear Engineering and Technology
    • /
    • 제54권9호
    • /
    • pp.3317-3323
    • /
    • 2022
  • Half Value Layer calculations theoretically need prior specification of linear attenuation calculations, since the HVL value is derived by dividing ln(2) by the linear attenuation coefficient. The purpose of this study was to establish a direct computational model for determining HVL, a vital parameter in nuclear radiation safety studies and shielding material design. Accordingly, a typical gamma-ray transmission setup has been modeled using MCNPX (version 2.4.0) general-purpose Monte Carlo code. The MCNPX code's INPUT file was designed with two detection locations for primary and secondary gamma-rays, as well as attenuator material between those detectors. Next, Half Value Layer values of some well-known gamma-ray shielding materials such as lead and ordinary concrete have been calculated throughout a broad gamma-ray energy range. The outcomes were then compared to data from the National Institute of Standards and Technology. The Half Value Layer values obtained from MCNPX were reported to be highly compatible with the HVL values obtained from the NIST standard database. Our results indicate that the developed INPUT file may be utilized for direct computations of Half Value Layer values for nuclear safety assessments as well as medical radiation applications. In conclusion, advanced simulation methods such as the Monte Carlo code are very powerful and useful instruments that should be considered for daily radiation safety measures. The modeled MCNPX input file will be provided to the scientific community upon reasonable request.

Markov-based time-varying risk assessment of the subway station considering mainshock and aftershock hazards

  • Wei Che;Pengfei Chang;Mingyi Sun
    • Earthquakes and Structures
    • /
    • 제24권4호
    • /
    • pp.303-316
    • /
    • 2023
  • Rapid post-earthquake damage estimation of subway stations is particularly necessary to improve short-term crisis management and safety measures of urban subway systems after a destructive earthquake. The conventional Performance-Based Earthquake Engineering (PBEE) framework with constant earthquake occurrence rate is invalid to estimate the aftershock risk because of the time-varying rate of aftershocks and the uncertainty of mainshock-damaged state before the occurrence of aftershocks. This study presents a time-varying probabilistic seismic risk assessment framework for underground structures considering mainshock and aftershock hazards. A discrete non-omogeneous Markov process is adopted to quantify the time-varying nature of aftershock hazard and the uncertainties of structural damage states following mainshock. The time-varying seismic risk of a typical rectangular frame subway station is assessed under mainshock-only (MS) hazard and mainshock-aftershock (MSAS) hazard. The results show that the probabilities of exceeding same limit states over the service life under MSAS hazard are larger than the values under MS hazard. For the same probability of exceedance, the higher response demands are found when aftershocks are considered. As the severity of damage state for the station structure increases, the difference of the probability of exceedance increases when aftershocks are considered. PSDR=1.0% is used as the collapse prevention performance criteria for the subway station is reasonable for both the MS hazard and MSAS hazard. However, if the effect of aftershock hazard is neglected, it can significantly underestimate the response demands and the uncertainties of potential damage states for the subway station over the service life.

컨테이너 터미널의 위험성평가 및 산업안전 AI 챗봇기술 적용방안 연구 (A Study on Risk Assessment of Container Terminals and Application of Industrial Safety AI Chatbot Technology)

  • 강휘진;한상준
    • 한국방재안전학회논문집
    • /
    • 제15권4호
    • /
    • pp.57-69
    • /
    • 2022
  • 2011년부터 2021년까지 10년 동안 항만 작업 중 숨지거나 다친 사람이 무려 2,800명에 달한다. 그중에서도 항만하역사업장에서 발생하는 빈도수가 높다. 컨테이너 터미널 사업자는 법령에 따라 위험성평가를 실시하고 합리적인 안전대책을 수립하여야 한다. 연구방법으로는 문헌분석을 통하여 산업안전보건법, 중대재해처벌법, 항만안전특별법에서 제시하는 위험성평가에 대한 내용을 제시한다. 본 연구에서는 기존 선행연구를 분석하여 컨테이너터미널의 위험성평가방법 및 유해위험요인을 살펴본다. 이러한 안전사고 위험을 개선할 수 있는 '산업안전 AI 챗봇기술'을 제시하는데 목적이 있다.

교량세굴 위험도 결정 및 유지관리 시스템 개발(II) - 시스템 검증 - (Bridge Scour Prioritization and Management System (II) - System Verification -)

  • 곽기석;박재현;윤현석;우효섭
    • 대한토목학회논문집
    • /
    • 제26권2B호
    • /
    • pp.197-208
    • /
    • 2006
  • 본 연구에서는 기개발된 교량세굴 유지관리 시스템의 현장 적용성을 검증하기 위하여 실제 교량현장에 대한 사례연구를 실시하였다. 사례연구는 강릉국도 관내의 20개 교량을 대상으로 지반조사를 포함한 현장조사, 설계 홍수량에 대한 교량세굴의 해석, 그에 따른 교량기초의 지지력 평가 및 위험도 등급 결정 그리고 교량세굴 유지관리 체계에 대한 종합적인 평가 등의 절차에 의해 진행되었다. 교량세굴 유지관리 시스템은 사례연구를 통해 세굴로 인한 교량기초의 위험도를 정량적으로 평가할 수 있는 유용한 시스템임이 검증되었으며, 효율적인 방재대책을 수립하고 홍수 시 교량의 안전을 확보할 수 있는 합리적이고 체계적인 시스템으로 제안된다.

국제민간항공협약 및 항공안전법 적용 기준 차이에 따른 해양경찰 항공기의 한·중 잠정조치수역 비행시 제한사항 및 해결방안 (Restrictions and Solutions on the Operation of Coast Guard Aircraft in the Provisional Measures Zone between Republic of Korea and China)

  • 김기연;이장룡
    • 한국항행학회논문지
    • /
    • 제28권1호
    • /
    • pp.37-43
    • /
    • 2024
  • 국가항공기는 국제민간항공협약의 적용 예외 대상이지만 각 국가는 타당한 고려 (due regard)를 통해 민간항공기의 안전을 확보해야 한다. 이에 따라 우리나라 항공안전법도 국가항공기는 법의 적용을 예외로 하고 있으나 해양경찰 항공기는 5개 조항에 대하여 법의 적용을 받도록 입법되었다. 해양경찰 항공기가 국제법과 국내법의 일부 조항의 적용하에 운용됨에 따라 서해상 공해인 잠정조치수역 상공 비행시 중국 민간항공관제기구로부터 비행절차에 대한 통제를 요구받게 된다. 중국의 이러한 요구는 해양경찰 항공기 본연의 임무인 국민의 안전을 보호하는 역할을 수행하는데 커다란 제한요소가 되고 있기에, 본 연구를 통해 범 국가적 차원에서 이러한 문제점을 해결할 수 있는 대안을 제시하였다.

국·내외 기준개선을 통한 국내 초고층 건축물의 화재피해경감 대책에 관한 연구 (A study on measures for the mitigation of fire damage in Korea super high-rise building through the improvement of domestic·foreign standards)

  • Ko, Jaesun
    • 한국재난정보학회 논문집
    • /
    • 제13권2호
    • /
    • pp.233-248
    • /
    • 2017
  • 초고층 건축물의 발생 가능한 화재를 방지하기 위해서는 통일된 법 규정과 합리적인 설계가 필요하다. 이를 위해 본 연구는 초고층 및 대형 건축물관련 건축심의 성능위주설계(PBD)평가 재해영향평가(DIA)를 중심으로 이 제도의 대상이 되는 건축물과 그 내용상의 문제를 분석하여 성능위주 설계를 기반으로 하는 화재 공학적 화재예방 개선방안을 도출하였다. 먼저 법 기준개선측면에서는 첫째 성능위주설계(PBD)평가와 재해영향평가 등에 있어서 상당부분이 동일한 내용임에도 불구하고 두 개의 법령으로 이원화된 부분은 일치 시키고 통폐합해서 운영하는 것이 필요하다. 둘째, 성능위주설계(PBD)평가와 재해영향평가(DIA)의 통폐합이 불가능하다면, 성능위주설계(PBD)평가와 재해영향평가(DIA)의 내용의 영역이 명확히 구분되어 정립되어야 한다. 다음 초고층 건축물의 공학적 화재위험성에 대한 개선방안으로는 NFPA 규정대로 첫째 특별 피난 계단에서 직통계단의 규정을 개정할 필요가 있으며, 배연창 대신 기계식 배연설비를 설치하는 경우, 미국에서 사용하는 샌드위치 가압방식(Sandwich Pressurization) 허용하고, 둘째 특별 피난계단용 제연설비는 화재시 구간별로 급기 할 수 있도록 기준의 개정 및 설계초기 단계부터 준공까지 성능위주설계 진행 등이 필요한 것으로 나타났다. 향후 이상의 연구에서 도출한 개선책 반영과 함께 초고층 건축물의 대한 또 다른 고려사항들에 대해 추가적인 연구가 진행되고, 또한 유지관리에 대한 연구가 진행되어 그 결과를 반영할 수 있는 초고층 건축물이라면 화재로 인한 인명피해 및 재산손실을 줄이는데 획기적인 기여를 할 것으로 예상된다.

APPLICATION OF FUZZY SET THEORY IN SAFEGUARDS

  • Fattah, A.;Nishiwaki, Y.
    • 한국지능시스템학회:학술대회논문집
    • /
    • 한국퍼지및지능시스템학회 1993년도 Fifth International Fuzzy Systems Association World Congress 93
    • /
    • pp.1051-1054
    • /
    • 1993
  • The International Atomic Energy Agency's Statute in Article III.A.5 allows it“to establish and administer safeguards designed to ensure that special fissionable and other materials, services, equipment, facilities and information made available by the Agency or at its request or under its supervision or control are not used in such a way as to further any military purpose; and to apply safeguards, at the request of the parties, to any bilateral or multilateral arrangement, or at the request of a State, to any of that State's activities in the field of atomic energy”. Safeguards are essentially a technical means of verifying the fulfilment of political obligations undertaken by States and given a legal force in international agreements relating to the peaceful uses of nuclear energy. The main political objectives are: to assure the international community that States are complying with their non-proliferation and other peaceful undertakings; and to deter (a) the diversion of afeguarded nuclear materials to the production of nuclear explosives or for military purposes and (b) the misuse of safeguarded facilities with the aim of producing unsafeguarded nuclear material. It is clear that no international safeguards system can physically prevent diversion. The IAEA safeguards system is basically a verification measure designed to provide assurance in those cases in which diversion has not occurred. Verification is accomplished by two basic means: material accountancy and containment and surveillance measures. Nuclear material accountancy is the fundamental IAEA safeguards mechanism, while containment and surveillance serve as important complementary measures. Material accountancy refers to a collection of measurements and other determinations which enable the State and the Agency to maintain a current picture of the location and movement of nuclear material into and out of material balance areas, i. e. areas where all material entering or leaving is measurab e. A containment measure is one that is designed by taking advantage of structural characteristics, such as containers, tanks or pipes, etc. To establish the physical integrity of an area or item by preventing the undetected movement of nuclear material or equipment. Such measures involve the application of tamper-indicating or surveillance devices. Surveillance refers to both human and instrumental observation aimed at indicating the movement of nuclear material. The verification process consists of three over-lapping elements: (a) Provision by the State of information such as - design information describing nuclear installations; - accounting reports listing nuclear material inventories, receipts and shipments; - documents amplifying and clarifying reports, as applicable; - notification of international transfers of nuclear material. (b) Collection by the IAEA of information through inspection activities such as - verification of design information - examination of records and repo ts - measurement of nuclear material - examination of containment and surveillance measures - follow-up activities in case of unusual findings. (c) Evaluation of the information provided by the State and of that collected by inspectors to determine the completeness, accuracy and validity of the information provided by the State and to resolve any anomalies and discrepancies. To design an effective verification system, one must identify possible ways and means by which nuclear material could be diverted from peaceful uses, including means to conceal such diversions. These theoretical ways and means, which have become known as diversion strategies, are used as one of the basic inputs for the development of safeguards procedures, equipment and instrumentation. For analysis of implementation strategy purposes, it is assumed that non-compliance cannot be excluded a priori and that consequently there is a low but non-zero probability that a diversion could be attempted in all safeguards ituations. An important element of diversion strategies is the identification of various possible diversion paths; the amount, type and location of nuclear material involved, the physical route and conversion of the material that may take place, rate of removal and concealment methods, as appropriate. With regard to the physical route and conversion of nuclear material the following main categories may be considered: - unreported removal of nuclear material from an installation or during transit - unreported introduction of nuclear material into an installation - unreported transfer of nuclear material from one material balance area to another - unreported production of nuclear material, e. g. enrichment of uranium or production of plutonium - undeclared uses of the material within the installation. With respect to the amount of nuclear material that might be diverted in a given time (the diversion rate), the continuum between the following two limiting cases is cons dered: - one significant quantity or more in a short time, often known as abrupt diversion; and - one significant quantity or more per year, for example, by accumulation of smaller amounts each time to add up to a significant quantity over a period of one year, often called protracted diversion. Concealment methods may include: - restriction of access of inspectors - falsification of records, reports and other material balance areas - replacement of nuclear material, e. g. use of dummy objects - falsification of measurements or of their evaluation - interference with IAEA installed equipment.As a result of diversion and its concealment or other actions, anomalies will occur. All reasonable diversion routes, scenarios/strategies and concealment methods have to be taken into account in designing safeguards implementation strategies so as to provide sufficient opportunities for the IAEA to observe such anomalies. The safeguards approach for each facility will make a different use of these procedures, equipment and instrumentation according to the various diversion strategies which could be applicable to that facility and according to the detection and inspection goals which are applied. Postulated pathways sets of scenarios comprise those elements of diversion strategies which might be carried out at a facility or across a State's fuel cycle with declared or undeclared activities. All such factors, however, contain a degree of fuzziness that need a human judgment to make the ultimate conclusion that all material is being used for peaceful purposes. Safeguards has been traditionally based on verification of declared material and facilities using material accountancy as a fundamental measure. The strength of material accountancy is based on the fact that it allows to detect any diversion independent of the diversion route taken. Material accountancy detects a diversion after it actually happened and thus is powerless to physically prevent it and can only deter by the risk of early detection any contemplation by State authorities to carry out a diversion. Recently the IAEA has been faced with new challenges. To deal with these, various measures are being reconsidered to strengthen the safeguards system such as enhanced assessment of the completeness of the State's initial declaration of nuclear material and installations under its jurisdiction enhanced monitoring and analysis of open information and analysis of open information that may indicate inconsistencies with the State's safeguards obligations. Precise information vital for such enhanced assessments and analyses is normally not available or, if available, difficult and expensive collection of information would be necessary. Above all, realistic appraisal of truth needs sound human judgment.

  • PDF

주택소유자(住宅所有者)에 대한 조세감면(租稅減免)의 경제적(經濟的) 효과(效果) : 기존연구(旣存硏究)의 개관(槪觀) 및 정책시사점(政策示唆點) (The Economic Effects of Tax Incentives for Housing Owners: An Overview and Policy Implications)

  • 김명숙
    • KDI Journal of Economic Policy
    • /
    • 제12권2호
    • /
    • pp.135-149
    • /
    • 1990
  • 주택소유자(住宅所有者)는 자가주택(自家住宅) 귀속임료(歸屬賃料)에 대한 소득세비과세(所得稅非課稅), 1세대(世帶) 1주택(住宅)에 대한 양도소득세비과세(讓渡所得稅非課稅) 및 주택상속(住宅相續)에 대한 상속세공제(相續稅控除) 등 여러가지 조세감면혜택(租稅減免惠澤)을 누리고 있다. 본고(本稿)에서는 기존의 연구결과를 중심으로 이러한 조세감면혜택의 경제적(經濟的) 효과(效果)를 살펴보았다. 이에 의하면 주택소유자(住宅所有者)에 대한 조세감면(租稅減免)은 조세부담(租稅負擔)의 수평적(水平的) 수직적(垂直的) 형평(衡平)에 어긋날 뿐 아니라 주택시장(住宅市場) 및 국민경제(國民經濟)에 미치는 여러가지 왜곡효과(歪曲效果)를 통해 자원배분(資源配分)의 효율성(效率性)을 저해하고 역진적인 소득재분배(所得再分配)를 유발한다고 할 수 있다. 특히 자본시장(資本市場)이 불완전(不完全)한 경우 주택조세감면(住宅租稅減免)은 부유층에 대해 필요 이상의 주택(住宅)을 소유토록하는 한편 유동성이 부족한 저소득층(低所得層) 및 젊은층의 주택구입(住宅購入)을 더욱 어렵게 함으로써 주택소유(住宅所有)의 계층간 불균형을 심화시키고 소득분배(所得分配)를 더욱 악화시키는 결과를 초래한다고 할 수 있다. 따라서 주택소유자(住宅所有者)와 무주택자간(無住宅者間) 조세(租稅)의 중립성을 회복하는 것이 중요하며 이를 위해서는 첫째로 무주택자(無住宅者)의 임대료지출(賃貸料支出)에 대해 소득공제(所得控除)를 실시하며, 둘째로 1세대(世帶) 1가구(家口)에 대해서도 양도소득세(讓渡所得稅)를 과세하며, 셋째로 상속과세(相續課稅)에 있어 주택공제(住宅控除)를 폐지하는 것이 바람직하다고 생각된다. 우리나라와 같이 자본시장(資本市場)이 불완전한 경우 주택소유촉진정책(住宅所有促進政策)은 효율적(效率的)인 장기주택금융제도(長期住宅金融制度)의 확립을 통해 실시되어야 하며 정부(政府)의 재정지원(財政支援)은 주거비부담능력(住居費負擔能力)이 최소한의 수준에 미달하는 영세민계층(零細民階層)에 집중(集中)되어야 할 것이다.

  • PDF

EC 항공여객보상규칙상 특별한 사정의 의미와 판단기준 - 2008년 EU 사법재판소 C-549/07 (Friederike Wallentin-Hermann v Alitalia) 사건을 중심으로 - (The Meaning of Extraordinary Circumstances under the Regulation No 261/2004 of the European Parliament and of the Council)

  • 김영주
    • 항공우주정책ㆍ법학회지
    • /
    • 제29권2호
    • /
    • pp.109-134
    • /
    • 2014
  • 본 논문은 국내 선행연구가 아직 이루어지지 않은 2008년 EU 사법재판소의 Friederike Wallentin-Hermann v Alitalia 판결을 검토하고, EU의 항공여객보상에 관한 EC 261/2004 규칙 제5조 제3항의 특별한 사정의 의미와 판단기준을 분석한 논문이다. EC 261/2004 규칙상 특별한 사정의 의미와 그 범위는 항공운송인의 여객보상책임을 면제한다는 측면에서 매우 중요한 의의를 갖는다. 그러나 EC 261/2004 규칙의 문면상 특별한 사정의 법리해석이 명확하지 않기 때문에 이를 구체적으로 파악하기가 쉽지 않다는 문제가 있다. 2008년의 Friederike Wallentin-Hermann v Alitalia 판결에서는 이에 대한 일정한 판단기준을 설정하였다는 점에서 지금까지 많은 사례들에서 확립된 선례로 인용되고 있다. 다만 그 이론구성에 관하여는 다음과 같은 2가지의 문제점이 있다. 첫째, 본건 항공기의 기술적 문제는 EC 261/2004 규칙 전문 (14)에서 특별한 사정의 예시로 들고 있는 '예상치 못한 안전운항상의 문제'와 관련된 것이다. 그러나 EU 사법재판소는 예상치 못한 안전운항상의 의미나 그 유형에 관하여는 아무런 언급이 없고, 본건 기술적 문제를 항공운송인의 통상적인 고유한 업무라는 측면에서 강조하고 있다. 항공기의 기술적 문제, 본건에서 문제된 엔진터빈의 복합적 결함은 안전한 항공운항의 장애요인으로, 안전운항상의 문제가 명확하다. 또한 항공운송인은 실제로 항공정비에 관해 법적인 정기검사를 시행해 오고 있었으나, 예상치 못한 엔진터빈 문제로 결항이라는 예상치 못한 사정이 발생된 것이다. 또한 수차례의 항공정비에 의해서는 발견되지 않는 기술적 문제가 비행기 이륙 직전, 항공기 기장에 의해 기술적 문제로 발견되는 경우에는 특별한 사정으로 판단될 수 있는 것은 아닌가 하는 의문도 제기된다. 만약 이러한 점들이 EC 261/2004 규칙 제5조 제3항의 특별한 사정이 아니라면, 무엇이 특별한 사정으로 포섭될 수 있는지 명확하게 단언하기 어려울 것이 다. 즉, 이와 같은 논리전개에 따른다면, 본건 기술적 문제는 EC 261/2004 규칙 제5조 제3항의 특별한 사정으로 판단할 여지도 있다는 점이다. 이에 대한 판단 자체를 유보한 사법재판소의 판시사항은 문제가 있다고 본다. 둘째, EU 사법재판소는 기술적 문제의 발생빈도 자체만으로는 EC 261/2004 규칙 제5조 제3항의 특별한 사정의 존재 여부를 결정짓는 요소로 판단할 수 없다고 설명하고 있는데, 이에 대하여도 의문이 제기된다. 본건 기술적 문제의 발생빈도 횟수가 만약 극도의 비정상적인 패턴으로 발생하는 경우라면, 이를 단순히 통상적 고유업무의 범위에서만 파악할 수 있겠느냐 하는 점이다. 즉, 항공정비와 같은 기술적 문제를 해결하고자 할 때, 항공운송인이 모든 주의를 기울여 합리적인 조치를 취했음에도, 비정상적인 발생빈도의 형태로 기술적 문제가 발생하는 경우라면, 이는 특별한 사정에 해당될 수도 있게 된다. 예컨대, 평균이상의 발생빈도라는 것이 추후에 항공기의 제조상 결함과 같은 문제로 판명될 수도 있으며, 기계적 설비의 운용상 발생할 수 있는 숨은 결함으로 인해 다발적인 기술적 문제가 발생할 수도 있다. 본 사안에서 EU 사법재판소는 평균적인 발생빈도와 본건 기술적 문제의 발생빈도 간의 특이성 규명 나아가 발생빈도로 인해 특별한 사정을 구성하게 되는 실질적인 요소 및 과정 등에 대하여 상세하게 검토하지 않았다. 리딩케이스로 취급되는 본 판결의 해석론 치고는 다소 아쉬운 점이라 볼 수 있겠다.