• Title/Summary/Keyword: Reactor Vessel Support

Search Result 34, Processing Time 0.013 seconds

Integrity of the Reactor Vessel Support System for a Postulated Reactor Vessel Closure Head Drop Event

  • Kim, Tae-Wan;Lee, Ki-Young;Lee, Dae-Hee;Kim, Kang-Soo
    • Nuclear Engineering and Technology
    • /
    • v.28 no.6
    • /
    • pp.576-582
    • /
    • 1996
  • The integrity of reactor vessel support system of the Korean Standard Nuclear Power Plant (KSNPP) is investigated for a postulated reactor vessel closure head drop event. The closure head is disassembled from the reactor vessel during refueling process or general inspection of reactor vessel and internal structures, and carried to proposed location by the head lift rig. A postulated closure head drop event could be anticipated during closure head handling process. The drop event may cause an impact load on the reactor vessel and supporting system. The integrity of the supporting system is directly relevant to that of reactor vessel and reactor internals including fuels. Results derived by elastic impact analysis, linear and non-linear buckling analysis and elasto-plastic stress analysis of the supporting system implied that the integrity of the reactor vessel supporting system is intact for a postulated reactor vessel closure head drop event.

  • PDF

Development of an Integrated Reactor UT Inspection System

  • Park, Yoo-Rark;Lee, Jae-Cheol
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.133.6-133
    • /
    • 2001
  • Reactor vessel is one of the most important equipment of Nuclear Power Plant (NPP) with regard to the nuclear safety. Thus reactor vessel must be examined periodically by certified experts. Currently, ultra-sonic(UT) non-destructive inspection is executed on reactor vessel. Two different techniques are used in this inspection. One is using the movable manipulator fixed with the support-guide placed on the vessel, and the other is using mobile robot moving in the vessel. Movable manipulator machine is very heavy, hard to handle, and very expensive. Mobile robot equipment is small and convenient but has a weak point on positional precision. To solve these problems we developed a reactor inspection system based on laser-driven mobile robot. This paper describes the main concept and structure of integrated inspection units and the feature of implemented units.

  • PDF

Development of Safety Review Guide for Periodic Safety Review of Reactor Vessel Internals (원자로내부구조물 주기적 안전성평가 심사지침 개발 배경)

  • Lee, Ki Hyoung;Park, Jeong Soon;Ko, Han Ok;Jhung, Myung Jo
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.9 no.1
    • /
    • pp.20-24
    • /
    • 2013
  • Reactor Vessel Internals(RVIs), which are installed within the reactor pressure vessel and support the fuel assembly, take responsibility for safety of reactor core. In operating Nuclear Power Plants(NPPs), the RVIs have been exposed to severe conditions such as neutron irradiation, high temperature, high pressure, and high velocity of coolant flow and have degraded by materials aging with long-term operation. Therefore, the effective aging management plan and the appropriate regulatory requirements are necessary to maintain the integrity of RVIs. The purpose of this paper is to provide a review guide for Periodic Safety Review(PSR) of RVIs in presurized water reactor. The review guide is developed based on the revised review guides and reports established from IAEA and USNRC, and the analysis results of design characteristics, aging mechanisms, and operating experiences of RVIs in domestic and international NPPs. Consequently, the developed review guide for PSR of RVIs is expected to contribute an overall strategy and standard for the PSR of RVIs.

Study on Selection of Nuclear Seismic Fragile Equipment and Its Enhancement of Seismic Performance (주요기기 내진성능 상향을 위한 설비보강 및 취약부 도출연구)

  • Son, Jung-Dae;Koo, Gyeong-Hoi
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.14 no.2
    • /
    • pp.16-23
    • /
    • 2018
  • In order to investigate the ways to enhance the seismic performance of APR1400 seismic fragile equipment by direct design changes, four equipment such as Reactor Vessel Support, Integrated Head Assembly, Remote Shutdown Console, and Pressurizer are reviewed using information of the main dimensions, seismic stress evaluation results, design FRS, etc. in this paper. In addition to the direct reinforcement of equipments, the feasibility of seismic isolation for the safety related cabinet is also investigated and the actual adaption plan of a commercial spring-damper system is briefly reviewed.

Seismic modeling and analysis for sodium-cooled fast reactor

  • Koo, Gyeong-Hoi;Kim, Suk-Hoon;Kim, Jong-Bum
    • Structural Engineering and Mechanics
    • /
    • v.43 no.4
    • /
    • pp.475-502
    • /
    • 2012
  • In this paper, the seismic analysis modeling technologies for sodium-cooled fast reactor (SFR) are presented with detailed descriptions for each structure, system and component (SSC) model. The complicated reactor system of pool type SFR, which is composed of the reactor vessel, internal structures, intermediate heat exchangers, primary pumps, core assemblies, and core support structures, is mathematically described with simple stick models which can represent fundamental frequencies of SSC. To do this, detailed finite element analyses were carried out to identify fundamental beam frequencies with consideration of fluid added mass effects caused by primary sodium coolant contained in the reactor vessel. The calculation of fluid added masses is performed by detailed finite element analyses using FAMD computer program and the results are discussed in terms of the ways to be considered in a seismic modeling. Based on the results of seismic time history analyses for both seismic isolation and non-isolation design, the functional requirements for relative deflections are discussed, and the design floor response spectra are proposed that can be used for subsystem seismic design.

Fast Neutron Flux Determination by Using Ex-vessel Dosimetry (노외 감시자를 이용한 압력용기 중성자 조사량 결정)

  • Yoo, Choon-Sung;Park, Jong-Ho
    • Journal of Radiation Protection and Research
    • /
    • v.32 no.4
    • /
    • pp.158-167
    • /
    • 2007
  • It is required that the neutron dosimetry be present to monitor the reactor vessel throughout its plant life. The Ex-vessel Neutron Dosimetry Systems which consist of sensor sets, radiometric monitors, gradient chains, and support hardware have been installed for 3-Loop plants after a complete withdrawal of all six in-vessel surveillance capsules. The systems have been installed in the reactor cavity annulus in order to characterize the neutron energy spectrum over the beltline region of the reactor vessel. The installed dosimetry were withdrawn and evaluated after a irradiation during one cycle and then compared to the cycle specific neutron transport calculations. The reaction rates from the measurement and calculation were compared and the results show good agreements each other.

Numerical study on fluid flow by hydrodynamic loads in reactor internals

  • Kim, Da-Hye;Chang, Yoon-Suk;Jhung, Myung-Jo
    • Structural Engineering and Mechanics
    • /
    • v.51 no.6
    • /
    • pp.1005-1016
    • /
    • 2014
  • Roles of reactor internals are to support nuclear fuel, provide insertion and withdrawal channels of nuclear fuel control rods, and carry out core cooling. In case of functional loss of the reactor internals, it may lead to severe accidents caused by damage of nuclear fuel assembly and deterioration of reactor vessel due to attack of fallen out parts. The present study is to examine fluid flows in reactor internals subjected to hydrodynamic loads. In this context, an integrated model was developed and applied to two kinds of numerical analyses; one is to analyze periodic loading effect caused by pump pulsation and the other is to analyze random loading effect employing different turbulent models. Acoustic pressure distributions and flow velocity as well as pressure and temperature fields were calculated and compared to establish appropriate analysis techniques.

Prediction of golden time for recovering SISs using deep fuzzy neural networks with rule-dropout

  • Jo, Hye Seon;Koo, Young Do;Park, Ji Hun;Oh, Sang Won;Kim, Chang-Hwoi;Na, Man Gyun
    • Nuclear Engineering and Technology
    • /
    • v.53 no.12
    • /
    • pp.4014-4021
    • /
    • 2021
  • If safety injection systems (SISs) do not work in the event of a loss-of-coolant accident (LOCA), the accident can progress to a severe accident in which the reactor core is exposed and the reactor vessel fails. Therefore, it is considered that a technology that provides recoverable maximum time for SIS actuation is necessary to prevent this progression. In this study, the corresponding time was defined as the golden time. To achieve the objective of accurately predicting the golden time, the prediction was performed using the deep fuzzy neural network (DFNN) with rule-dropout. The DFNN with rule-dropout has an architecture in which many of the fuzzy neural networks (FNNs) are connected and is a method in which the fuzzy rule numbers, which are directly related to the number of nodes in the FNN that affect inference performance, are properly adjusted by a genetic algorithm. The golden time prediction performance of the DFNN model with rule-dropout was better than that of the support vector regression model. By using the prediction result through the proposed DFNN with rule-dropout, it is expected to prevent the aggravation of the accidents by providing the maximum remaining time for SIS recovery, which failed in the LOCA situation.

The Assembly and Test of Pressure Vessel for Irradiation (조사시험용 압력용기의 조립 및 시험)

  • Park, Kook-Nam;Lee, Jong-Min;Youn, Young-Jung;June, Hyung-Kil;Ahn, Sung-Ho;Lee, Kee-Hong;Kim, Young-Ki;Kennedy, Timothy C.
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.33 no.2
    • /
    • pp.179-184
    • /
    • 2009
  • The Fuel Test Loop(FTL) which is capable of an irradiation testing under a similar operating condition to those of PWR(Pressurized Water Reactor) and CANDU(CANadian Deuterium Uranium reactor) nuclear power plants has been developed and installed in HANARO, KAERI(Korea Atomic Energy Research Institute). It consists of In-Pile Section(IPS) and Out-of Pile System(OPS). The IPS, which is located inside the pool is divided into 3-parts; the in-pool pipes, the IVA(IPS Vessel Assembly) and the support structures. The test fuel is loaded inside a double wall, inner pressure vessel and outer pressure vessel, to keep the functionality of the reactor coolant pressure boundary. The IVA is manufactured by local company and the functional test and verification were done through pressure drop, vibration, hydraulic and leakage tests. The brazing technique for the instrument lines has been checked for its functionality and performance. An IVA has been manufactured by local technique and have finally tested under high temperature and high pressure. The IVA and piping did not experience leakage, as we have checked the piping, flanges, assembly parts. We have obtained good data during the three cycle test which includes a pressure test, pressure and temperature cycling, and constant temperature.

DEVELOPMENT OF AN IMPROVED INSTALLATION PROCEDURE AND SCHEDULE OF RVI MODULARIZATION FOR APR1400

  • Ko, Do-Young
    • Nuclear Engineering and Technology
    • /
    • v.43 no.1
    • /
    • pp.89-98
    • /
    • 2011
  • The construction technology for reactor vessel internals (RVI) modularization is one of the most important factors to be considered in reducing the construction period of nuclear power plants. For RVI modularization, gaps between the reactor vessel (RV) core-stabilizing lug and the core support barrel (CSB) snubber lug must be measured using a remote method from outside the RV. In order to measure RVI gaps remotely at nuclear power plant construction sites, certain core technologies must be developed and verified. These include a remote measurement system to measure the gaps between the RV core-stabilizing lug and the CSB snubber lug, an RVI mockup to perform the gap measurement tests, and a new procedure and schedule for RVI installation. A remote measurement system was developed previously, and a gap measurement test was completed successfully using the RVI mockup. We also developed a new procedure and schedule for RVI installation. This paper presents the new and improved installation procedure and schedule for RVI modularization. These are expected to become core technologies that will allow us to shorten the construction period by a minimum of two months compared to the existing installation procedure and schedule.