Daegu urban railroad line 3 is introduced with straddle-type monorail system within the country at the first time. This system is long line with 24km in total length which has not the results of construction in Korea. The rail beam of monorail bridge to be constructed/ installed in the city is adopted on the basis of the PSC rail beam. It is required to apply the steel rail beam at rapid/ curved line parts or location to be required the long span bridge as passing river and intersection. The composition of span bridge is various and the height of bridge is change with each section and exist the different curve radius due to all section is passes in the city. The rail beam shall be considered the ground conditions and then consider the construction methods. It is analyzed to construction period of PSC rail beam to be linked with period of infrastructure construction and construction of steel rail beam, structure construction of station etc. It is compared to crane construction methods and launching girder as alternative construction methods and propose to upper construction methods which is superior in economic and construction.
Proceedings of the Korean Institute of Building Construction Conference
/
2012.05a
/
pp.137-138
/
2012
Domestic construction materials market was about 65 trillion won and it occupied 45% level of total construction cost by 2007. In addition, due to the recent rapid rise of crude oil and iron ore price, fluctuation of raw material cost has a great influence to the cost of construction industry. This means that smooth performance is closely related to construction materials. And among them, because of high putting rate of metal materials, it can be seen that the fluctuation of metal material prices is an important variables. So in this study, for the pre-study to analyze the impact of metallic material prices to construction cost, the researcher analyzed a causal relationship between metal material prices and construction cost.
International conference on construction engineering and project management
/
2022.06a
/
pp.476-483
/
2022
The novel coronavirus pandemic has had a significant impact on society and everyday life. The pandemic imposed a global shutdown leading to many challenges such as the suspension of academic programs at universities. The result of this suspension contributed to the rapid overnight migration of educational activities from traditional face-to-face learning to a virtual environment which until then was unfamiliar to both instructors and students. This study identified the experiences faced by built environment higher education instructors in KwaZulu-Natal, South Africa during this sudden switch to online teaching and learning. This pilot study employed a quantitative research approach to survey instructor experiences on online teaching and learning during a global pandemic. The data was computed and analyzed using IBM Statistical Package for Social Sciences (SPSS) version 27. Descriptive statistics were used to analyze the data collected. The study sample comprised of 20 higher education instructors in the region of the KwaZulu Natal province in South Africa. Findings from the study revealed that instructors faced adaptive challenges with rapidly having to redesign and remodel the mode of academic course delivery and assessments to suit an online platform. Additionally, instructors observed that students faced technological challenges such as connectivity and navigating the online learning management system platforms. The challenges identified by instructors and students can be effectively transformed to opportunities for future learning under the 'new normal'.
Proceedings of the Korean Geotechical Society Conference
/
2010.03a
/
pp.248-259
/
2010
In the case of relatively good ground and construction condition in the deep excavation for the construction of subway, railway, building etc., flexible earth retaining systems are often used in an economical point of view. It is generally known that the mechanism of behavior in the flexible earth retaining system is relatively more complicated than the rigid earth retaining system. Moreover in the case of long span strut supporting system the analysis of strut axial force change becomes more difficult when the differences of ground condition and excavation work progress on both sides of excavation section are added. When deeper excavation than the specification or installation delay of supporting system is done or change of ground condition is faced due to the construction conditions during construction process, lots of axial force can be induced in some struts and that can threaten the safety of construction. This paper introduces one example of long span deep excavation where struts and rock bolts were used as a supporting system with flexible wall structure. The characteristics of ground deformation and strut axial force change, the measured data obtained during construction process, were analysed, the effects of relatively deeper excavation than the specification on one excavation side and rapid drawdown of ground water level on the other excavation side were deeply investigated from the viewpoint of mutual influences between ground deformations of both excavation sides and strut axial force changes. The effort of this article aims to improve and develop the technique of design and construction in the coming projects having similar ground condition and supporting method.
Proceedings of the Korean Institute of Building Construction Conference
/
2019.05a
/
pp.133-134
/
2019
As information and construction technology increases, the demand for sophisticated geometric design grows. Design of buildings is becoming more larger, higher, and complicated every day, requiring much new construction technology to bring the design into reality. Nonetheless, the speed of construction technology development is not as rapid. This study concerns the difficulties of realization of sophisticated geometric design. It aims to suggest using BIM and precision survey equipment during the construction stage of the project is a way to resolve. The study will list how to use BIM as an engineering platform incorporating a photo scanner, a scanner drone, and a 3D scanner in the construction stage of projects, how these progressive projects were able to benefit from the high-construction technology.
Journal of The Korean Association of Information Education
/
v.1
no.2
/
pp.35-44
/
1997
Rapid progresses on computer and Internet technology fortell the changes in learning environments in our classrooms, which requires a timely preparation for the near future. The construction and utilization of databases that can be used in education, among other things, is the crucial subject which we need to address to. This paper discusses the various aspects of the construction of educational databases and proposes a way for effectively maintaining them.
Proceedings of the Korean Institute of Building Construction Conference
/
2012.05a
/
pp.169-171
/
2012
Although work-efficiency of construction machinery is a critical factor for estimating its workable-quantity per unit time, the coefficient figure table presented in the Poom-Sam that is used for Construction Cost Estimation of public sectors in Korea is very subjective for practical usage. In order to suggest objective work-coefficient table for a Tub Grinder, domestic and overseas documentary records were investigated and on-going construction sites were also visited. The research found that the table can be revised by means of detailing down by several factors. The research will be the foundation for applying the rapid development of Construction Equipment and technology to the appropriate cost estimations and the ground work of related studies.
The resolution of the 1993 Uruguay Round and the opening of Korea's construction market in '97 marked the beginning of the globalization of Korea's domestic construction market. Consequently, the process led to changes in contracting procedures, as well as disputes in construction management. With globalization came a rapid realization of reasonable values, which forced the hierarchical vertical relationship between the owners, constructors, and subcontractors into a more equal, horizontal relationship. Once the hierarchical relationship was altered, the late 1990's witnessed a dramatic increase in managerial disagreements, in addition to escalating legal disputes and expenditures. The horizontal relationship was a new concept and brought forth many complexities. Unfortunately, because all of this was new, management of construction disputes was elementary at best. Anticipation of disputes is the key to effective dispute management. This includes thorough reviews of contract documents, document management, construction records, and checklists. Also necessary is the education of owners and contractors with pertinent knowledge concerning dispute management. The following paper focuses on the importance of observing construction disputes in order to facilitate management thereof.
Each year the amount of construction wastes increases at a rapid pace. Particularly, wastes from apartment housing projects that make up 89.14% of the total construction projects have increased about 48% as compared with those of the year 2000. Construction wastes are therefore rising as an issue related to environmental problems and disposal costs. And there are ongoing studies of the disposal, control and recycling of construction wastes. Mitigation measures for the wastes, however, have been a rare subject of research that focuses on waste-generating factors by activity during apartment housing projects. Given that, the purpose of this study was to categorize construction wastes by work type and to identify the factors causing wastes in order to reduce them. This study investigated the amount of the wastes from apartment housing constructions by activity as related to disposal costs, and examined causes in the ordering, transport, material management and construction stage, respectively. The analysis results will likely bring about expectation effects that help reduce the generation of the wastes by establishing action plans.
Eun-A Choi;Su-Man Choi;Jai-Dong Koo;Nam-Gi Lim;Sang-Beom Lee
International conference on construction engineering and project management
/
2009.05a
/
pp.1440-1445
/
2009
Clients demands have been changed by construction circumstances such as high-technology, megaprojects, and the complexity of construction. Advanced foreign nations have already introduced and applied new project delivery systems (i.e, CM, DB, etc.) to deal with the change of such that. Korea has also promoted variation of the delivery systems for the progressive measure to the rapid changeable situation. Even though government has made his efforts as stated above, some clients have uniformly used those to public construction projects. That is because there are not selection criteria of project delivery system for clients. Therefore, this study presented the selection criteria of project delivery system based on project types in the public large construction projects. In addition, the study has verified the viability of the presented models through consultation with professionals and experts.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.