• Title/Summary/Keyword: Rainfall Days

Search Result 480, Processing Time 0.028 seconds

Development of daily spatio-temporal downscaling model with conditional Copula based bias-correction of GloSea5 monthly ensemble forecasts (조건부 Copula 함수 기반의 월단위 GloSea5 앙상블 예측정보 편의보정 기법과 연계한 일단위 시공간적 상세화 모델 개발)

  • Kim, Yong-Tak;Kim, Min Ji;Kwon, Hyun-Han
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.12
    • /
    • pp.1317-1328
    • /
    • 2021
  • This study aims to provide a predictive model based on climate models for simulating continuous daily rainfall sequences by combining bias-correction and spatio-temporal downscaling approaches. For these purposes, this study proposes a combined modeling system by applying conditional Copula and Multisite Non-stationary Hidden Markov Model (MNHMM). The GloSea5 system releases the monthly rainfall prediction on the same day every week, however, there are noticeable differences in the updated prediction. It was confirmed that the monthly rainfall forecasts are effectively updated with the use of the Copula-based bias-correction approach. More specifically, the proposed bias-correction approach was validated for the period from 1991 to 2010 under the LOOCV scheme. Several rainfall statistics, such as rainfall amounts, consecutive rainfall frequency, consecutive zero rainfall frequency, and wet days, are well reproduced, which is expected to be highly effective as input data of the hydrological model. The difference in spatial coherence between the observed and simulated rainfall sequences over the entire weather stations was estimated in the range of -0.02~0.10, and the interdependence between rainfall stations in the watershed was effectively reproduced. Therefore, it is expected that the hydrological response of the watershed will be more realistically simulated when used as input data for the hydrological model.

Proposal of Early-Warning Criteria for Highway Debris Flow Using Rainfall Frequency (2): Criteria Adjustment and Verification (확률 강우량을 이용한 고속도로 토석류 조기경보기준 제안 (2) : 기준의 조정 및 적용성 검토)

  • Choi, Jaesoon
    • Journal of Korean Society of Disaster and Security
    • /
    • v.12 no.2
    • /
    • pp.15-24
    • /
    • 2019
  • In the previous study, the rainfall data of 1 hour, 6 hours and 3 days were used as the rainfall criterion according to the grade to trigger the debris flow in the highway area, using the rainfall data of Gangwon area and the rainfall time-series data at the spot where the debris flow occurred. In this study, we propose an early warning criterion of the highway debris flow triggering through appropriate combination of three rainfall criteria selected through previous studies and adjustments of rainfall criterion in the highway debris flow triggering. In addition, simulations were conducted using the time-series rainfall data of 2010~2012, which had a large amount of precipitation for the five sites where debris flows occurred in 2013. As a result of the study, the criteria for the early warning of highway unsteadiness on the highway were prepared. In case of the grade-based adjustment, it is preferable to apply the unified rating to the grade B. Also, if the fatigue of the monitoring is not a problem, adjusting it to A or S may be a way to positively cope with the occurrence of highway debris flow.

A Forecast Model for the First Occurrence of Phytophthora Blight on Chili Pepper after Overwintering

  • Do, Ki-Seok;Kang, Wee-Soo;Park, Eun-Woo
    • The Plant Pathology Journal
    • /
    • v.28 no.2
    • /
    • pp.172-184
    • /
    • 2012
  • An infection risk model for Phytophthora blight on chili pepper was developed to estimate the first date of disease occurrence in the field. The model consisted of three parts including estimation of zoosporangium formation, soil water content, and amount of active inoculum in soil. Daily weather data on air temperature, relative humidity and rainfall, and the soil texture data of local areas were used to estimate infection risk level that was quantified as the accumulated amount of active inoculum during the prior three days. Based on the analysis on 190 sets of weather and disease data, it was found that the threshold infection risk of 224 could be an appropriate criterion for determining the primary infection date. The 95% confidence interval for the difference between the estimated date of primary infection and the observed date of first disease occurrence was $8{\pm}3$ days. In the model validation tests, the observed dates of first disease occurrence were within the 95% confidence intervals of the estimated dates in the five out of six cases. The sensitivity analyses suggested that the model was more responsive to temperature and soil texture than relative humidity, rainfall, and transplanting date. The infection risk model could be implemented in practice to control Phytophthora blight in chili pepper fields.

A Study on the Floodplain Management Plan due to Inundation of Nakdong River Basin (낙동강유역 침수범람에 따른 홍수터관리 방안 연구)

  • Seo, Kyu-Woo
    • Journal of Wetlands Research
    • /
    • v.4 no.2
    • /
    • pp.57-66
    • /
    • 2002
  • The local storm occurred Nakdong river basin from August 4 to 11 of the year 2002, resulting in a record 500-600mm rainfall. The heavy rain continued for more than 10 days and especially between 3 to 4 am of August 9, 50mm per hour local storm occurred in Hanrim-myun area, Kimhae. 8 days after the storm, the water level of Nakdong river rose rapidly and the river flowed backward the branches. T he draining of the protected low wetland was unable and the water level of the inner bank area rose suddenly, causing the inundation in several areas. Baeksan bank of Nam river, Gahyun(Samhak) bank of Hwang river, and Kwangam bank of Shinban river, where the draining facilities were under construction or constructed recently, were failed by the piping around the draining culvert. This study analyze the cause of the damage in Nakdong river banks and suggests the countermeasures for future improvement. The damaged spot of the river bank was surveyed, and the rainfall and the fluctuation in the water levels were reviewed. Finally for the flood inundation prevention at the inner bank area, new floodplain management plan as the protect of low wetland established.

  • PDF

Probable Evapotranspiration of Paddy Rice using Dry Day Index

  • 장하우;김성준
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.37 no.E
    • /
    • pp.72-78
    • /
    • 1995
  • To support some knowledge in planning irrigation system, short or long-term irrigation scheduling or determining irrigation reservoir capacity, it is necessary to estimate peak irrigation requirements and seasonal distribution of water demands for various return periods. In this paper Dry Day Index and Probable Evapotranspiration were evaluated to decide seasonal consumptive use of paddy rice for a design year using several decades' daily rainfall data and 5 years'('82~'86) actual evapotranspiration data, respectively. To obtain Dry Day Index that is defined as the number of probable dry days for a given period, Slade unsymmetrical distribution function was adopted. Dry Day Index was analysed for 5 and 10-day intervals. Each of them was evaluated with return periods of 1, 3, 5, 10 and 20 year. Their singnificance was tested by X$^2$ method. Based on these values, the Probable Evaportanspiration, that is the average daily ET both in dry days and rainy days during a given period, was estimated. Crop coefficient was also determined by the modified Penman equation proposed by Doorenbos & Pruitt.

  • PDF

Climatological Variability of Temperature and Precipitation in Jeju (제주지역 기온과 강수량의 기후 변동 특성)

  • Kim, Seong-Su;Jang, Seung-Min;Baek, Hee-Jeong;Choi, Heung-Yeon;Kwon, Won-Tae
    • Journal of the Korean earth science society
    • /
    • v.27 no.2
    • /
    • pp.188-197
    • /
    • 2006
  • The characteristics of variability of temperature and precipitation in Jeju were investigated using data observed in Jeju station for from 1924 to 2004. Annual mean temperature change for the last 81 years is $0.02^{\circ}C$ increase per year. After 1980, the increase is $0.05^{\circ}C$ per year, larger than the former. The increase of the minimum temperature is larger than that of the maximum temperature in Jeju and has resulted in the increase of mean temperature. The frequency of climate extreme occurrence of temperature and rainfall was also investigated. The temporal variation of frequency of the extremely higher temperature has increased in the 1980's with global warming. The appearance of the extremely lower minimum temperature has decreased during the summers and winters. The facts that the frequencies of rainy days has decreased and heavy rainfall days of more than 80 mm per day in precipitation has increased indicate the increase of rainfall intensity.

A Generalized Model on the Estimation of the Long - term Run - off Volume - with Special Reference to small and Medium Sized Catchment Areas- (장기만연속수수량추정모형의 실용화 연구 -우리나라 중소유역을 대상으로-)

  • 임병현
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.32 no.4
    • /
    • pp.27-43
    • /
    • 1990
  • This study aimed at developing a generalized model on the estimation of the long - term run - off volume for practical purpose. During the research period of last 3 years( 1986-1988), 3 types of estimation model on the long - term run - off volume(Effective rainfall model, unit hydrograph model and barne's model for dry season) had been developed by the author. In this study, through regressional analysis between determinant factors (bi of effective rainfall model, ai of unit hydrograph model and Wi of barne's model) and catchment characteris- tics(catchment area, distance round the catchment area, massing degree coefficient, river - exte- nsion, river - slope, river - density, infiltration of Watershed) of 11 test case areas by multiple regressional method, a new methodology on the derivation of determinant factors from catchment characteristics in the watershed areas having no hydrological station was developed. Therefore, in the resulting step, estimation equations on run - off volume for practical purpose of which input facor is only rainfall were developed. In the next stage, the derived equations were applied on the Kang - and Namgye - river catchment areas for checking of their goodness. The test results were as follows ; 1. In Kang - river area, average relative estimation errors of 72 hydrographs and of continuous daily run - off volume for 245 days( 1/5/1982 - 31/12) were calculated as 6.09%, 9.58% respectively. 2. In Namgye - river area, average relative estimation errors of 65 hydrographs and of conti- nuous daily run - off volume for 2fl days(5/4/1980-31/12) were 5.68%, 10.5% respectively. In both cases, relative estimation error was averaged as 7.96%, and so, the methodology in this study might be hetter organized than Kaziyama's formula when comparing with the relative error of the latter, 24~54%. However, two case studies cannot be the base materials enough for the full generalization of the model. So, in the future studies, many test case studies of this model should he carries out in the various catchment areas for making its generalization.

  • PDF

The Effects of Infiltration Rate of Foundation Ground Under the Bioretention on the Runoff Reduction Efficiency (식생체류지의 원지반 침투율이 유출량 저감효과에 미치는 영향모의)

  • Jeon, Ji-Hong;Jung, Kwang-Wook
    • Journal of Korean Society on Water Environment
    • /
    • v.35 no.1
    • /
    • pp.72-77
    • /
    • 2019
  • Soil type in LID infiltration practices plays a major role in runoff reduction efficacy. In this study, the effects of infiltration rate of foundation ground under bioretention on annual runoff reduction rate was evaluated using LIDMOD3 which is a simple excel based model for evaluating LID practices. A bioretention area of about 3.2 % was required to capture surface runoff from an impervious area for a 25.4 mm rainfall event. The relative error of runoff from bioretention using LIDMOD3 is 10 % less than that of SWMM5.1 for a total rainfall event of 257.1 mm during the period of Aug. 1 ~ 18, 2017, hence, the applicability of LIDMOD3 was confirmed. Annual runoff reduction rates for the period 2008 ~ 2017 were evaluated for various infiltration rates of foundation ground under the bioretention which ranged from 0.001 to 0.600 m/day and were converted to annual runoff reduction for hydrologic soil group. The runoff reduction rates within hydrologic soil group C and D were steeply increased through increased infiltration rate but not steep within hydrologic A and B with reduction rates ranging from 53 ~ 68 %. The estimated time required to completely empty a bioretention which has a storage depth of 0.632 m is 3.5 ~ 6.9 days and we could assume that the annual average of antecedent rainfall is longer than 3.5 ~ 6.9 days. Therefore, we recommended B type as the minimum hydrologic soil group installed LID infiltration practices for high runoff reduction rate.

Evaluation of Practical Application of the Remote Monitoring System for Water Salinity in Estuary Lake During Farming Season

  • Lee, Kyung-Do;Hong, Suk-Young;Kim, Yi-Hyun;Na, Sang-Il;Oh, Young-Jin
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.47 no.5
    • /
    • pp.313-318
    • /
    • 2014
  • The remote monitoring system of water salinity was assessed in Wando reclaimed land lake during a farming season in 2009. Increasing of water salinity in this lake used to bring about salt damage on rice plant occasionally. At the early stage of the rice growing period, rice growth was not damaged due to enough rainfall with more than 120 mm from the mid-May to the first ten days of June. Data collection using on-site water salinity measuring sensors every 2 hours and real-time transmission in system were carried out for the experiment. We compared the transmitted values from the sensor system with water sample values collected and analyzed by a local technical office. Salt concentrations measured by sensor in real-time monitoring system were available data. The regression equation between rainfall and water salinity was presented as (water salinity after rainfall) = $0.621{\times}$(water salinity before rainfall)${\times}exp(-0.0139{\times}rainfall)$, ($r^2=0.579$, p<0.01). It is suggested that the system is useful for stable farming in the area where farmer use water in reclaimed lakes as an irrigation source.

Estimation of Design Flood Considering Time Distribution of Rainfall (강우 시간분포를 고려한 설계홍수량산정)

  • Park, Jae-Hyun;Ahn, Sang-Jin;Hahm, Chang-Hahk;Choi, Min-Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1191-1195
    • /
    • 2006
  • Now days, heavy storm occur to be continue. It is hard to use before frequency based on flood discharge for decision that design water pocket structure. We need to estimation of frequency based on flood discharge on the important basin likely city or basin that damage caused by flood recurrence. In this paper flood discharge calculated by Clark watershed method and SCS synthetic unit hydrograph method about upside during each minute of among time distribution method of rainfall, Huff method choosing Bocheong Stream basin that is representative basin of International Hydrologic Project (IHP) about time distribution of rainfall that exert big effect at flood discharge estimate to research target basin because of and the result is as following. Relation between probability flood discharge that is calculated through frequency analysis about flood discharge data and rainfall - runoff that is calculated through outward flow model was assumed about $48.1{\sim}95.9%$ in the case of $55.8{\sim}104.0%$, SCS synthetic unit hydrograph method in case of Clark watershed method, and Clark watershed method has big value overly in case of than SCS synthetic unit hydrograph method in case of basin that see, but branch of except appeared little more similarly with frequency flood discharge that calculate using survey data. In the case of Critical duration, could know that change is big area of basin is decrescent. When decide time distribution type of rainfall, apply upside during most Huff 1-ST because heavy rain phenomenon of upsides appears by the most things during result 1-ST about observation recording of target area about Huff method to be method to use most in business, but maximum value of peak flood discharge appeared on Huff 3-RD too in the case of upside, SCS synthetic unit hydrograph method during Huff 3-RD incidental of this research and case of Clark watershed method. That is, in the case of Huff method, latitude is decide that it is decision method of reasonable design floods that calculate applying during all $1-ST{\sim}4-TH$.

  • PDF