• Title/Summary/Keyword: Railway signalling system

Search Result 151, Processing Time 0.025 seconds

Analysis and Test of CBTC Wireless Communication System in KyungSan test Line (I) (경산시험선 CBTC 시스템용 무선통신시스템 시험(1))

  • Cho, Bong-Kwan;Ryu, Sang-Hwan;Lee, An-Ho;Hwang, Hyeon-Chyeol;Park, Gi-Su
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2731-2734
    • /
    • 2011
  • Korean-Automated Guideway Transit (K-AGT) was successfully developed through Light Rail System Development Project. Since then, the domestic development rate of on-board signalling system of light rail has been improved up to 90% by Practical Utilization Project of Light Rail. After utilization project, furthermore, POSCO ICT has developed the wayside signalling system of CBTC, including wireless communication equipment. KRRI carried out the performance test of the wireless communication, interfacing and using the other CBTC equipments of KyungSan Test Line so as to see whether it conforms IEEE 802.11x, international communication standard in view of operational concept of CBTC. In this paper, we presents the test plan, test items, and the analysis results of maximum communication distance tests between on-board and wayside radio sets.

  • PDF

A Study on the Functional Safety Analysis of PES-based Electronic Interlocking Unit according to IEC 61508 (IEC 61508 기준 PES 기반 전자연동장치의 기능 안전도 분석에 관한 연구)

  • Lee, Myung-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.11
    • /
    • pp.1526-1532
    • /
    • 2014
  • The Electronic Interlocking unit in railway signalling system is safety-related facilities to determine route and speed for train running. In particular, the SSI(Solid State Interlocking) is Electronic Interlocking unit for high-speed railway, and it performs safety-critical function by MPM(Micro-Processor Module). Meanwhile, MPM is composed of the PES(Programmable Electronic System)-based system, and the PES-based system in railway safety-related facilities should be implemented by complying with the safety requirements defined in IEC 62425 and IEC 61508. In this paper, we performed modeling of failure rate and reliability for MPM implemented by fault tolerance methods and analyzed functional safety for MPM. Moreover, we determined SIL(Safety Integrity Level) for MPM according to the safety requirements defined in IEC 61508 based on an analyzed functional safety.

Review of Automatic Testing Tool for Vital Software Safety Test and Assessment of Railway Signalling Systems (열차제어시스템 바이탈 소프트웨어 안전성 평가를 위한 테스트 도구의 검토)

  • Hwang, Jong-Gyu;Jo, Hyun-Jeong;Yoon, Yong-Gi;Jeong, Rak-Gyo
    • Proceedings of the KIEE Conference
    • /
    • 2007.10c
    • /
    • pp.204-206
    • /
    • 2007
  • The portion of embedded software in railway signaling system is increased by the advance of computer and communication technology. And the safely requirements for railway system are standardized by int'l std., such as IEC 62278 and IEC 62279. According to these circumstances for software safety problems, we are deduced the testing items for software safety test and assessment for railway signaling. Testing tools used for embedded software are surveyed to find a feasible safety assessment architecture. And the architecture of automatic test tool is proposed to test the deduced safely testing items in this paper.

  • PDF

A Study on the Quantitative Quality of Service(QoS) of the Light Railway Transit System (경전철시스템의 정량적 서비스 품질에 관한 연구)

  • Ha, Chen-Soo;Ahn, Seok-Hwan;Lee, Chang-Huyng
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.2058-2064
    • /
    • 2008
  • This study is concerned with the quantitative Quality of Service(QoS) of the Light Railway Transit(LRT) System. Generally, the QoS offered to passengers by the Operator of LRT system can be quantified in various ways. In this paper, we assumed that the QoS is a combination of both Train Delivery and Train Punctuality under considering LRT characteristics including core sub-systems such as, rolling stock, signalling, power-supply and PSD(platform screen door), etc. We also, provide a quantitative analysis method to evaluate the QoS related the reliability of LRT system.

  • PDF

Communication Consecutive Test of Train Oriented Control System for Wayside Equipment Control (선로변 시설물 차상제어를 위한 차상중심 열차제어시스템의 통신 연속성 시험)

  • Baek, Jong-Hyen
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.5
    • /
    • pp.703-712
    • /
    • 2014
  • To improve the efficiency and safety of railway systems, the train control system has been considerably evolved from the ground-equipment-based control system (e.g. track circuit, interlocking system, etc.) into the on-board-equipment-based control system. In addition, this train control system enables the rolling stock to intelligently control the trackside facilities by introducing the information and communication technologies (ICT). Accordingly, since the ICT-based train control system makes the railway system be simplified (i.e. the heavy ground-equipment can be removed), the efficient and cost-effective railway system can be realized. In this paper, we perform the feasibility test of the ICT-based train control system via a simulation. To this end, we have developed the prototypes of the on-board controller and wayside object control units which control the point and crossing gate and performed the integrated operation simulation in a testbed. In this paper, before the field test of the on-board-controller-based train control system, we perform the Consecutive operation test for prototypes of the on-board controller, wayside object control units and local control computer.

Preliminary Field Trial of Improved Train Control System Using on-board Control (선로변 시설물 차상 제어를 위한 차상중심 열차제어시스템 예비 현장시험)

  • Park, Chul Hong;Choi, Hyeon Yeong;Baek, Jong-Hyen
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.39C no.3
    • /
    • pp.298-306
    • /
    • 2014
  • The railway signalling system for safe train operation regulates the train speed to ensure the safety distance between consecutive trains by using wayside facilities such as track circuits and interlocking systems. In addition, this signalling system controls the trackside equipment such as a railway point along the train line. This ground-equipment-based train control systems require high CAPEX and OPEX. To deal with these problems, the train control system using the on-board controller has been recently proposed and its related technologies have been widely studied. The on-board-controller-based train control system is that the on-board controller can directly control the trackside equipment on the train line. In addition, if this system is used, the wayside facilities can be simplified, and as a result, the efficient and cost-effective train control system can be realized. To this end, we have developed the prototypes of the on-board controller and wayside object control units which control the point and crossing gate and performed the integrated operation simulation in a testbed. In this paper, before the field test of the on-board-controller-based train control system, we perform the preliminary field trial including the installation test, wireless access test, interface test with other on-board devices, and normal operation test.

A study of eatablishing ETCS Level 1 to speed up conventional lines (기존선 속도향상을 위한 ETCS Level 1 구축방안 연구)

  • Yoon, Yong-Ki;Jeong, Rag-Gyo;Kim, Chae-Duck
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.666-670
    • /
    • 2011
  • ATS(Automatic Train Stop)s are is effected by track environment, signal distance and train braking distance. So onboard signaling systems such as ATP(Automatic Train Protection) are installed on conventional lines by some train operation companies. With the mixed signalling, the onboard signaling system is overlaid on a conventional line with ATS, it is possible to run the line with conventional trains and ATP trains and to use the advantages of ATP(higher speed or more trains on the line). This paper includes guidelines a mixed signalling(ETCS and ATS) system architecture, operation concepts and infill balise installation.

  • PDF

A Study on the Radio-Based Operation Procedures of Switch and Crossing at Branch Line (지선구간의 선로전환기 및 건널목 무선제어 운영절차 연구)

  • Kim, Young-Hoon;Choi, Won-Suk
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1269-1274
    • /
    • 2011
  • To cut down the maintenance expenses at branch lines, the foreign developed countries have developed the low-cost signalling on low-density lines. These examples are FFB(FunkFahrBetrieb) Radio based train operation by German railways(Deutsche Bahn AG), ERTMS REGIONAL by Europe and LOCOPROL system using a GPS. Also, Korea is developing Information and Communication Technology based low-cost signalling on low-density lines. The characteristics of this system are directly controled switch and crossing by driver. For the purpose of this paper, we reviewed the business process for switch and crossing control. Specially, we compared and analysed both methods whether the driver takes control over the operation procedures of switch or the control message is carried by the command of the controller. And by utilizing the instrument of UML, I planned the switch according to the control authority and the operation procedures needed for the control of crossing.

  • PDF

A Study on the Construction of Test Track for Automated Guideway Transit (경량전철 시험선 구축에 관한 연구)

  • 정종덕;이안호;한석윤
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.447-454
    • /
    • 2000
  • As the AGT system has never operated in Korea, the construction of test track is essential to the acquisition of safety for the passengers. However, the test track is a synthetic system including vehicle, power system, signalling, track etc, several factors must be considered. In this paper, we suggest the general guideline for the test track of AGT system and test items on test track through the investigation of leading test facilities in the world. Through continuous study and investigation, we finally will build the test track to verify the reliability requirements between the train and infrastructures

  • PDF

Development of Vehicle's Radio Data Communication System for LRV Signalling System (경량전철 신호시스템 열차무선데이터 전송시스템의 개발)

  • Lee Eul-jae;Yoou Yong-Gi;Jung Rak-Gyo;Choi Gyu-Hyung
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.1429-1431
    • /
    • 2004
  • 경량전철의 무인운전을 위한 무선제어 신호 시스템 중에서 열차 제어정보 처리를 위한 무선데이터 전송시스템을 개발하였다. 개발된 시스템은 각각 중앙운용시스템, 지상무선중계시스템 및 개별차량운용시스템으로 구성된다. 무선데이터 네트웍은 2.4GHz 대역의 확산스펙트럼 방식의 주파수 호핑 라디오 모뎀을 사용하여 전용망을 구성하였으며 1초 이내에 무선망 내에 위치하는 모든 무선데이터 전송시스템과 정보를 교환하도록 설계되었다. 현재 실험실 테스트를 완료하고 새로이 건설된 전용 시험선에서 그 유효성을 테스트 중에 있다.

  • PDF