• Title/Summary/Keyword: Railway roadbed

Search Result 170, Processing Time 0.026 seconds

Analysis of Geotextile Bag Reinforcing Effect on Railway Roadbed (지오텍스타일 백을 이용한 철도노반 보강효과 분석)

  • Lee, Dong-Hyun;Shin, Eun-Chul
    • Journal of the Korean Geosynthetics Society
    • /
    • v.4 no.4
    • /
    • pp.3-11
    • /
    • 2005
  • In this study, a large-scale laboratory model test and 2-D numerical analysis were conducted to verify the reinforcement effect by utilizing geotextile bag on the railway roadbed. Static loading which simulated train load was applied on the geotextile-reinforced railway roadbed and also unreinforced railway roadbed. Computer program named Pentagon 2-D which is a part of FEM programs was used in the numerical analysis. Based on the results of laboratory test and 2-D numerical analysis, the effect of load distribution and settlement reduction was found to be depending on the geotextile characteristics, tensile strength of geotextile, and interface friction angle between geotextile bags. In general, the result of 2-D numerical analysis shows lower value than that of laboratory test.

  • PDF

Development of Design Method for Reinforced Roadbed Considering Plastic Settlement for High-speed Railway (고속철도에서의 소성침하를 고려한 강화노반 설계기법 개발)

  • Choi, Chan-Yong;Choi, Won-Il;Han, Sang-Jae;Jung, Jae-Hyun
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.9
    • /
    • pp.55-69
    • /
    • 2013
  • An alternative design method of existing methods based on elastic theory the design method of roadbed considering plastic deformation of roadbed and stress-strain at roadbed materials with the cyclic loading of trains passing. The characteristics of the developed design method considering traffic load, number of cyclic loading and resilience modulus of roadbed materials can evaluate elastic strain as well as plastic settlement with allowable design criteria. The proposed design method is applied to standard roadbed section drawing of HONAM high-speed railway considering design conditions such as allowable elastic and plastic settlement, train speed, the tonnage of trains. As a result, required levels of resilience modulus model parameter ($A_E$), unconfined compressive strength, types of soil material were evaluated.

Determination on the Reinforced Roadbed Thickness of Concrete Track at Embankment Section (흙쌓기 구간에서 콘크리트궤도 강화노반의 두께 결정에 관한 연구)

  • Lee, Il-Wha;Lee, Sung-Jin;Sin, Min-Ho;Hwang, Sun-Kun;Lee, Chang-Jin
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.6
    • /
    • pp.835-843
    • /
    • 2009
  • Recently the more stable roadbed is required due to the high speed and design load. Therefore the reinforced roadbed was introduced as the solution. But the thickness and stiffness of reinforced roadbed in design code is being conservatively assessed by the foreign code without considering the domestic construction condition. In this paper, adequate Young's modulus, drain capacity, freezing depth, economical efficiency, bearing capacity, construction condition and 3-D finite element method were employed to determine the proper thickness of reinforced roadbed at the embankment section.

The behavior of high-speed rail roadbed reinforced by geogrid under cyclic loading (지오그리드로 보강한 고속철도 노반의 동적 거동)

  • 신은철;김두환;김종인
    • Proceedings of the KSR Conference
    • /
    • 1999.11a
    • /
    • pp.415-422
    • /
    • 1999
  • The general concept of reinforced roadbed in the high-speed railway is to cope with the soft ground for the bearing capacity and settlement of foundation soil. The cyclic plate load tests were performed to determine the behavior of reinforced ground with multiple layers of geogrid underlying by soft soil. Five series of test were conducted with varying the soil profile conditions including the ground level, type of soil, and the thickness of each soil layer. Based on these plate load tests, laboratory model tests under cyclic loading were conducted to know the effect of geogrid reinforcement in particular for the high-speed rail roadbed. The permanent settlement and the behavior of earth pressure in reinforced roadbed subjected to a combination of static and dynamic loading are presented.

  • PDF

A Study on Field Behavioral Characteristics of the Roadbed according to the Speed Increase in High-Speed Train (HEMU-430x)

  • Eum, Ki-Young;Lee, Jee-Ha;Park, Young-Kon
    • International Journal of Railway
    • /
    • v.6 no.2
    • /
    • pp.78-84
    • /
    • 2013
  • This paper is about the first experiment in Korea that was conducted on speeding increase up with rail speeds at 430km/h at high speed railway of designed 350km/h. and analysis data collected on vibration accelerations of roadbed. There are barely references on roadbed behavior measurement with rail speeds more than 350 km/h in Korea as it has never been conducted the experiment on it. So the experiments were confirmed the reliability through crosschecking the figures/values from respective sensors and measuring devices after measuring EMS and ICP types. Based on the study, values of vibration acceleration were less than 12% compared with the ones that conducted while speeding up of HEMU-430X. Also, figures of HSB for concrete bed tracks were 52% against the standard. According to the results, all the performance evaluation of vibration acceleration for roadbeds in transition zones is under the standard.

A Study on the Method of preventing from Reduction of AF Track Circuit Signal Current on a Ferroconcrete Roadbed (철근콘크리트 도상에서 AF 궤도회로 신호전류 저감방지대책에 관한 연구)

  • Hong, Hyo-Sik;Yoo, Kwang-Kiun;Rho, Sung-Chan
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.5
    • /
    • pp.500-503
    • /
    • 2010
  • Until now, the track circuit with railroad which is a part of an electrical circuit wad used only for the detection of the train location, but as train speed is up to be higher, in order to overcome the limits of ground signal system the railway signal system has changed from the ground signal system to a cab signal system. The power source of the track circuit has also changed from a direct current or a high voltage impulse to an alternating current with high frequency which is a part of the audio frequency. To improve the maintenanability and according to the environment condition, the railway roadbed is rapidly changed to the ferroconcrete roadbed. In case of a track circuit to use an alternating current with high frequency as power source at a ferroconcrete roadbed, the characteristic of the track circuit is brought on a change from a loss of the magnetic combination instead of a leakage current from electric insulation which was caused by the reinforcing iron pod with lattice shape for durability. This paper is shown the influence and the loss of the signal current at AF track circuit on a ferroconcrete in the simulation sheets and presented a proposal for the preventive method from reduction of signal current.

Dynamic Analysis of Structure's Approaches through Field Tests in the Conventional Railway (현장계측을 통한 기존선 철도 구조물 접속부의 거동분석)

  • Park, Joon-Oh;Lee, Sang-Bae;Hong, Won-Pyo
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1864-1874
    • /
    • 2007
  • Korean trains pass many mountain areas, so the volume of structures like bridge and tunnel has large part of railway lines. Train speed-up naturally needs a straight line in railway, then structures are increasing, and the length of structure has more than 70% in Kyongbu high-speed railway. The stiffness of bridge and tunnel is higher than the soil in the roadbed in spite of dynamic difference in vibration and displacement. Differences in stiffness have more dynamic effects and increase the deformation and destruction in the track and roadbed. This influences passenger's comfort and the safety of operation, and it needs more track maintenance. This study selected tunnel with ballast track, tunnel with concrete track, and structure's approaches with short maintenance cycle in the roadbed and had track acceleration tests and track liner inspections using track master in the field. This study will measure periodically to structure's approaches which have very fast track irregularity and analyze dynamic differences and track irregularity near structure's approaches, so realize the cause of track irregularity of structure's approaches and use basic data for reasonably strengthening method of structure's approaches.

  • PDF

Analysis of Settlement and Stress Characteristics about Influence of Track Parameters on Railroad Roadbed by using GEOTRACK (GEOTRACK을 이용한 궤도변수에 따른 침하 및 응력 특성 분석)

  • Shin, Eun-Chul;Lee, Han-Jin;Kang, Jeong-Gu;Yang, Hee-Saeng
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.395-403
    • /
    • 2007
  • Railroad track consists of relatively simple structures such as rail, sleeper, ballast. Roadbed shares vertical pressure by train load which passed through rail to ballast as base that supports the track. For evaluating stress and displacement of roadbed due to the railroad load is an important role on the track as a basic data for estimation of the durability and design of the roadbed thickness. GEOTRACK program applied multi-layered theory was developed for analyzing railroad track structure. GEOTRACK program is a sort of numerical analysis program which has advantage that can analysis component of track by simple method. In this study, this program was used to preform the numerical analysis by changing track conditions and roadbed conditions such as tie, reinforced roadbed, dynamic wheel load, Resilient modulus and so on. Further detail will be presented on the paper.

  • PDF

A Study on Reinforcement Effectiveness for Railway Soft Roadbed through Long-Term Instrumentation on the Field Test (현장부설시험구간에서의 장기계측을 통한 토목섬유 보강효과)

  • Choi Chan-Yong;Lee Jin-Wook
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.734-743
    • /
    • 2005
  • In this study, geotextiles was applied on the selected track-bed, which is relatively economical and efficient way to prevent the problem of mud-pumping and settlement. Field testing sections from Mock-haeng to Dong-ryang in the Chung-La lines in Korea were selected to investigate the state of track and roadbed. And three places were chosen among 1,700 spots where mud-pumping was frequently occurred and maintenance required. At the curved section with radius of 500m between Mock-haeng and Dong-ryang, we divided this testing site into 5 section and 4 different types of geotextile were installed and left the last section with no reinforcement. Total length of the test site was 200m and individual length of each site was 40 m. In order to understand the state and the strength of prepared roadbed, stiffness and physical properties of the roadbed soil were evaluated and analyzed. Also, after the installation, mud-pumping, settlement of elastic or plastic sleeper, failure of track, wheel-loads, lateral force and earth pressures were investigated.

  • PDF