Kim, Ickhee;Kim, Incheol;Bae, Yeong-Gyu;Wang, Yeondae
Journal of the Korean Operations Research and Management Science Society
/
v.38
no.3
/
pp.23-35
/
2013
It is very important that the calculation of railroad track capacity in infrastructure investment analysis and train operation planning. The dwelling time is one of the factors that influence in railroad track capacity. Current research in dwelling time has been focusing on theoretical investigation, the state of the research in effective variable (dwelling time etc) is insufficient. In this paper, we clearly draw the concept of railroad track capacity and the estimate on modeling of relationship railway demand and dwelling time. Also, we compare and analyze the variation of railroad track capacity according to transit railway demand in Gyeongin Line (Guro~Inchon). This paper is expected to contribute for improving on the in-using equations and methods in train operation planning as well as for improving level of service on railway user.
Kim Jong-Ki;Kim Baek-Hyun;Lee Jun-Ho;Lee Duck-Ho;Shin Key-Soe
Proceedings of the KSR Conference
/
2005.05a
/
pp.831-835
/
2005
In a signal control of the railway system, the first objective is to guarantee a safety of the train operation, and the second is to increase a frequency(a capability of the transportation) of the train operation. In order to express the capability of the transportation a terminology what is called a railroad line capacity is employed. The railroad line capacity means a maximum frequency of the train operation in a possible schedule of the one way operation for one day. During the last several years an improvement in the facilities of the train operation (railroad line extension, improvement in the stations, improvement in the signal facilities) has been achieved to increase the railroad line capacity. In this paper the authors deal with the case analysis which try to shorten headway and which has an impartible relation with increasing of the railroad capacity
Railroad transportation system has experienced major changes due to KTX introduction. Kyungbu corridor especially Seoul to Cheonan has line capacity problem and its solution has been a primary concern to researchers and policy decision makers. This study explored pattern of train operation between Seoul and Cheonan after the introduction of KTX in 2004. Both the number of trains and available seat capacity per day have increased but maximum number of trains per specific hour has not been changed much. Demand for train shows that if concentrated in a specific time, so number of trains during the peak hour should be increased. But, it is difficult ? 새 line capacity, so increasing seat capacity per train might be an option. An increase in an avaliable sear should be considered the characteristics of each train lines.
Line capacity of railways is a core criterion to decide maximum trips in accordance with traffic demand and a priority in railway investment to improve transportation capability. Particularly, because two operators will start revenue services in the HSR from mid-2016, the line capacity should be carefully calculated and controlled to avoid conflicts between the maximum number of KTXs, and the number needed to guarantee the effective competition of the operators. Meanwhile, there have been many arguments about calculating the line capacity, because this number is affected by the number of trips by train types, stopping pattern and dwell time in each station, journey time, crossing or passing, safety headway between trains, etc. To deal successfully with these kinds of problems, this study proposes a simulation method to calculate the line capacity that considers train operation according to the operator's service policies.
Studied was a strategy of technology development for railway system in terms of railway network. First, The successful launch of the Korean HST system has not only decreased logistics burden but also significantly transformed the Korean trunk-line railway network, revolutionizing the logistics and technology sectors and reinvigorating the Korean railway industry in one century. Korean railway industry sector is now investing to develop many different types of railway system(G7, Post G7, tilting train...) so that these kinds of various railway system development should be integrated with the National Inter-modal Transportation Network Plan. To secure sufficient capacity that is required by the National Railroad Plan, the railway industry needs to establish mid- and long-term train purchase and operation strategies in compliance with railway construction and operation policies. During a railway construction planning, train operators, based on their train operation strategies, should come up with measures to closely cooperate with project operators from the planning stage through to the opening of a railway system. To be more precise, train operators should establish long-term train procurement plans reflecting both long-term national railroad network plans and plans for each railway line in order to suggest appropriate roles and schedules for each line. Also, based on the long-term railway plan, directions should be decided concerning the research and development of trains in advance.
The primary objective of this paper is to examine the capacity of electrical transmission in electric railway according to the type of feeding system. Although supply capacity of railway substation are sufficient and there is no accident, due to the electrical transmission limit of feeding line the voltage breakdown may occur when large capacity of electric load at feeding line exist. So, using multi-port analysis model, we draw P-V curve due to feeding method, load, location and power factor of electric locomotive.
The Transactions of The Korean Institute of Electrical Engineers
/
v.67
no.12
/
pp.1729-1734
/
2018
Recently, interest in environmentally friendly transportation systems has been increasing, and study on railway systems has been aggressively conducted. Therefore, lots of studies have been done in railway advanced countries to improve performance of PWM converter. The research on the PWM converter for railway vehicle was mainly carried out on the converter mounted on railway vehicle such as the high-speed railway and metropolitan railway. In also, a lot of study has been carried out to improve converter performance installed in the ground. The high-capacity transform used in this paper converted from AC 22.9kV to AC 590V. The converter changed from AC 590V to DC 950V. In general, in the case of rectifier, the DC power supply system has a negative impact on inverter control characteristics because it can not avoid the pulsating component. In this study, it was performed current control for high-capacity converter using Matlab Simulink. The PWM converter is normally performed through the voltage and current at starting mode, powering mode, and braking mode. In the light-load test and the on-line test, we have studied for the PWM converter characteristics. Using this research, we have founded that the converter has excellent performance.
In the electric railway systems, it is very important that we should design the system configuration, location and power capacity of substation. This paper presents the results of system configuration and system design of the DC traction power supply for the test line of Light Rail Vehicle. The voltage fluctuation of train and the power capacity of substation are calculated by computer simulation using the nodal equation, K.C.L/K.V.L, Ohm's law and superposition theory.
Proceedings of the Safety Management and Science Conference
/
2002.05a
/
pp.257-262
/
2002
There are two methodologies to increase transport capacity of railway. The one is to invest railroad equipment or vehicles, and the other is to improve operation efficiency through optimization. All of these is intended to increase transport capacity by improving line capacity So far, we treat line capacity as the criteria for evaluating investment alternatives or for restricting tram frequencies, and this criteria is calculated statical and experimental numerical formula. But, line capacity has special attribute that change dynamically according to operational condition, so there is a need of new line capacity estimation system. The Purpose of this paper is to present a new line capacity estimation system based on the probability simulation and its applications.
With speed-up of existing railway, a greater attention is paid to the riding safety and the comfort of the passengers. They are combined to some technical factors related to track such as alignment, derailment coefficient, and track bearing capacity, A quantitative analysis method for those technical factors is presented in this study. Calculating the allowable transit speed, the technical reviews of speed-up of Janghang-Line(Chunan∼Janghang) are conducted. And the alternatives for improving train speed in existing railway are proposed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.