• Title/Summary/Keyword: Railway construction

Search Result 1,413, Processing Time 0.027 seconds

Improvement of Constructability of Coping by Reduction of Reinforcement Amount (철근량 저감을 통한 코핑부 시공성 향상)

  • Park, Bong-Sik;Park, Sung-Hyun;Cho, Jae-Yeol
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1577-1582
    • /
    • 2011
  • Recently rapid construction of bridge is a main interest in construction. A research on rapid construction of pier coping is urgently needed because pier, which is a bridge understructure, directly affect lane reduction and increase of social cost. Precast assembly method and pre-assembly method are the main subjects of rapid construction. But these researches have focused not on reduction of reinforcement amount, but on modifying production method of coping. Reinforcement amount of design specification is as much as that of coping under constructing. So different approach is needed for reduction of reinforcement amount. In this paper, design of pier coping using strut-tie model was proposed for reduction of reinforcement amount and improvement of constructability. Railway bridge pier coping under constructing was analyzed using a finite element method and designed using strut-tie model.

  • PDF

Estimation of RPS Method Using 3-Dimensional Numerical Analysis (3차원 수치해석을 이용한 RPS 공법의 적용성 평가)

  • Roh, Jeong-Min;Shin, Eun-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.2 s.33
    • /
    • pp.174-179
    • /
    • 2006
  • Recently, the crossing tunnel has been constructed frequently to connect the separated area by highway and railroad. The construction of crossing tunnel must be progressed while maintaining the existing traffic of the highway as well as railroad. There are many cross funnelling methods such as NTR, TRCM, Messer Shield, Front Jacking, and Pipe Roof Method. The advantages of adopting RPS(Roof Panel Shield) method in crossing tunnel construction with comparing other existing cross funnelling methods are needed a little volume of concrete and easy to change the direction of cutting shoe during the construction of pipe roof, The 3-dimensional numerical analysis of RPS to consider the arching effect was performed for the application in the crossing tunnel under railroad. The earth pressure distribution and settlement were predicted when the RPS method was applied during the excavation for crossing railroad tunnel construction.

Procedure Development for Organizing Electronic Technical Manual of Construction Design Information and Applicability Analysis for Practical Project (건설공사 설계도서매뉴얼의 전자화 절차구성 및 실무 적용효과 분석)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Kwak, Joong-Min
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.103-111
    • /
    • 2007
  • The existing design materials by document type are restricted in searching and acquiring necessary design information because the materials consist of huge information and various document types. This study suggests a methodology to develop an electronic technical manual that can manage construction design materials by XML-base integrated information system. Electronic technical manual for design materials can provide visualized information through various multimedia tools such as multi-link, virtual reality and animation. Using an integrated electronic manual for construction project can prevent to miss necessary design information. The results of this study includes a data flow diagram to develop an interactive electronic technical manual (IETM) for construction design information. Finally the study suggests some scenarios for practical use and quantitative analysis of application effect analysis by AHP method.

The Application Of F.C.M(Free Cantilever Method) Case Study Of The Railway Bridge (철도교량 F.C.M(Free Cantilever Method) 공법 시공사례 연구)

  • Kwon, Soon-Seob;Kim, Kyong-Yeon;Choi, Dong-Kee;Jeong, In-Choul;Shin, Sang-Chul
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.562-567
    • /
    • 2005
  • F.C.M applied from Jin Jung Li to Yang Su Li(660m) in Puk Han River Bridge(1,414m) construction part is a construction method on the double-track construction which is the third section part of work, called Chung Ang Railroad Line(Deok-So${\sim}$Won-Ju). This method is the beginning application on Railroad Bridge. After completing upper slab structure, there are several following works such as setting up ballast, sleepers and laying long rails. So it is important to consider the properties of Railroad Bridge while designing the length of bridge and its single span. After the physical process study the shrinkage and creep of concrete, bending up by prestressing in general PSM bridge, relaxation of tendons as time goes by after post-tension, the conclusion of such a study is applied to the Puk-Han River Bridge in this construction field.

  • PDF

Article - 환기.방재측면에서의 초장대.대심도 터널에 관한 고찰

  • Lee, Hang
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.54
    • /
    • pp.41-55
    • /
    • 2011
  • The current railway projects under plan, design, or construction have been designed as 'very long and deep underground tunnel'. Therefore, it is reasonable that the standards for preventing disaster in such conditions should be intensified in order to avoid repeating the same failure which happened in Daegu subway disaster, Although we consent to the opinion that nothing can compete with human being's life, it is very difficult to protect the life from all of potential disasters perfectly in railway fields because the excessive standards can result in excess construction cost, which can bring about cancelation of the project itself eventually. Therefore optimized disaster design standard is required to negotiate the conflict between economical cost and social tolerance limitation simultaneously.

  • PDF

A study on the economical feasibility analysis method for introducing the urban transit system (도시철도 SYSTEM 도입시 경제성 평가 방법에 대한 연구)

  • Park Jung-Hwa;Lee Ho-Yong;Hong Soon-Heun
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.1 s.32
    • /
    • pp.23-28
    • /
    • 2006
  • Many services have been served by the exiting subway systems since they have opened in 1975. But its efficiency and competition were going down because of the high construction cost and difficult connection with other transportations, etc. Otherwise, the light rail transit system is much lower construction cost than the subway and the high way building. Also those systems are good at the inexpensive operation cost, the fixed time and safety, the easy access. Recently, the several provinces are planning or advancing the light rail transit system because of these many benefits. Consequently, those system's economical feasibility analysis is required rapidly to show the resonable construction's cause and to get the private investment. This paper offers the system's economical feasibility through the several benefit analysis after the light rail transit system's construction.

The Improvement Plan on Fare and Ticketing System of Seoul Metropolitan Subway Considering Construction and Operational Costs (건설.운영비를 고려한 수도권 전철의 운임체계 및 승차권제도 개선방안)

  • Lee, Tai-Sik;Ryu, Jong-Won;Chung, Chul;Lee, Dong-Wook
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.3 s.40
    • /
    • pp.327-336
    • /
    • 2007
  • Operation a subway company requires high amount of early construction, operation and maintenance costs. Seoul Metro, one of the public subway companies in Seoul, Korea, has undergone operational deficit from its establishment, and the main reason is that the early construction and operation cost exceed the total revenue. Therefore, detailed researches on current operation system and possible alternatives are conducted to settle down finance trouble of the company. In particular, problems on operation and ticketing systems are analyzed, and based on that, necessity and detailed plan of railroad pass for one day are introduced and analyzed.

Analysis of Shear Behavior of Shear Key for Concrete Track on Railway Bridge Considering Construction Joint (타설 경계면을 고려한 철도교 콘크리트궤도 전단키의 전단 거동 해석)

  • Lee, Seong-Cheol;Kang, Yun-Suk;Jang, Seung Yup
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.3
    • /
    • pp.341-350
    • /
    • 2016
  • Concrete track on railway bridges should be designed to effectively respond to the movement of the superstructure of the bridge. In the design procedure, shear keys are generally placed on the protection concrete layer (PCL) before casting the concrete track so the shear force due to slip between the concrete track and the bridge super-structure can be transferred. In this paper, a nonlinear structural analysis procedure that considers the construction joint has been developed to predict the shear behavior of a shear key. With the developed analysis procedure, it was possible to predict the shear force-shear slip response at the construction joint in a shear key by considering the friction of concrete surface and the dowel action of the rebars. The analysis results showed good agreement with the test results for 4 specimens.

A Study on the Establishment of the Standard for Buffering Region in Railway Development Areas (철도 개발지 완충지역 기준 설정에 대한 연구)

  • Kim, Min Kyeong;Kim, Dong Yeob
    • Ecology and Resilient Infrastructure
    • /
    • v.5 no.1
    • /
    • pp.45-53
    • /
    • 2018
  • Ecological networks can be generally classified into core areas, buffer zones, and corridors. Particularly, buffer zones connect core areas or ecological corridors, and preserve ecological network by reducing the impact from outside. We examined related laws and researches about buffer zone establishment associated with the resources of high ecological and conservation value to find out more researches are needed. In this study, we investigated various examples of the criteria for establishing buffer zones at domestic and overseas. Based on the results of railway environmental impact assessment and railway construction guidelines, we analyzed the application methods applicable to the railway development area and proposed the criteria to evaluate land cover status, species diversity, rarity, and connectivity. Through this study, the environmental and ecological value around the development area of the railroad was examined to reduce the environmental damage from railroad construction.

A Scientometric and Meta-analysis of Rail Infrastructure in Nigeria

  • Awodele, Imoleayo Abraham;Mewomo, Modupe Cecilia
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.960-966
    • /
    • 2022
  • Mobility is an essential human need. Human survival and societal interaction depend on the ability to move people and goods. Efficient mobility systems are essential facilitators of economic development. Cities could not exist and global trade could not occur without systems to transport people and goods cheaply and efficiently. Rail has been considered as one of the important components of the transportation infrastructure required to service and improve the performance and productivity of an economy. In Nigeria, the rail infrastructure built by the colonial master several decades ago has been left in a state of total deterioration. This long neglect was occasioned by the failure of the government to pay adequate attention to infrastructure development. There is a vital and urgent need for rail infrastructure development in Nigeria. This study presents a systematic review of the evolution of rail, the current nature of railway infrastructure delivery in Nigeria, and offers possible suggestions on how to achieve an effective and sustainable rail infrastructure delivery in Nigeria. A thorough literature search of academic databases was conducted on current research trends on the subject of railway infrastructure by systematically reviewing selected published articles from reputable research domains. The analysis of the selected articles revealed the following among others (1) the existing railway infrastructure is in a state of mess and not sustainable, and (2), Government's investment/commitment in rail infrastructure seems inadequate compared to what is obtainable in other developed countries. Rail infrastructure development cannot be left to the Federal government of Nigeria to solve on its own; collaboration and participation are required. Government as a matter of priority should devote considerable attention to the development of rail infrastructure to harness the economic potential and transformation that sustainable rail infrastructural projects will provide.

  • PDF