• Title/Summary/Keyword: Railway capacity

Search Result 480, Processing Time 0.028 seconds

Study of the structure and method of high efficiency water cooling system for monorail propulsion system (모노레일 추진시스템용 고효율 수냉식 냉각구조 및 방법에 관한 연구)

  • Ko, Hyung-Keun;Park, Tae-Hong;Song, Min-Su;On, Sek-Jin;Park, Jin-Hong
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.151-156
    • /
    • 2010
  • Monorail, with the cutting edge technology from EMU system, is small to medium sized transportation solution with bus size capacity, and one of key factors is to minimize size and weight. The Wolmi urban tour monorail, which is a center guide type first ever introduced in the world, is also consists minimizing size and weight of the propulsion system (inverter and motor), which generates considerable amount of heat. This study presents a solution of the structure and method of water cooling system of minimize the size and weight of high efficiency propulsion system, and an effective control method for energy saving.

  • PDF

A Study on electirc equipment measurement using sensors (센서를 이용한 전기장치 측정에 관한 연구)

  • Han, Young-Jae;Kim, Ki-Hwan;Park, Choon-Soo;Choi, Jong-Sun;Kim, Jung-Su
    • Journal of Sensor Science and Technology
    • /
    • v.12 no.4
    • /
    • pp.164-169
    • /
    • 2003
  • Recently, as the road capacity reaches the limit and environmental problems becomes serious, there is gradually increased a need for railroad vehicles that are environment-friendly and have time regularity, reliability and safety. Accordingly, in addition to conventional railroad vehicles, lots of vehicles are being newly developed. We developed the hardware and software of the measurement system for on-line test and evaluation of korean high speed train. The software controls the hardware of the mesurement data and acts as interface between users and the system hardware. In this paper, we is studied for electric apparatus performance of railway vehicle using sensor. In order to this test is developed signal conversion system. Using this system, we obtained important result for pantograph voltage, battery voltage, axle speed, and inverter current.

Study on Freight Transportation with Train Ferry between Korea and China (한.중간 열차페리를 이용한 화물수송방안연구)

  • 이용상;노학래;정병현
    • Proceedings of the KSR Conference
    • /
    • 1999.05a
    • /
    • pp.41-51
    • /
    • 1999
  • Trade between Korea and China was 372million dollars accounting for 1.56% of total in 1988 and has been increased to 23,689 million dollars occupying 7% in 1997, which implies 32.2% increase on average per year. This trend will continue dramatically and consistently as China's open policy toward the world accelerates and korean companies advance into chinese market. The main trade routes are with marine transportation between korean west sea area and chinese San-Dong peninsula around east sea. However, due to the increasing traffic congestion on main roads connecting harbors and main consumer cities and capacity problem in west sea harbor areas, the logistics cost have been increased resulting in losing competitiveness of freight trade. Therefore, these road-oriented inland transportation means need to be changed to rail transport system to reduce congestion and to conserve natural environment. To achieve this scheme, efficient intermodal transportation system connecting road and rail should be constructed. These combined system will ensure timely delivery of goods and consequently the customers would make proper transportation schedule for the import/export goods in advance. Especially, combined transportation of Railroad and train ferry would cope with the logistics problem and this system would be efficient means for trade with not only China but further with many adjacent countries in central asia such as Kazakhstan and Uzbekistan

  • PDF

Test Construction of the Paved Track at Subway Main Line (도시철도 본선 토공구간에서의 포장궤도 시험부설)

  • Lee, Il-Wha;Kang, Yun-Suk;Kong, Sun-Yong;Kim, Sang-Jin;Lee, Shun-Gu;Jung, Yun-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1689-1694
    • /
    • 2008
  • Recently, the development of the paved track is required as a low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The important factors of paved track are stability and applicability. To be based on this subject, cement mortar pouring type paved track is developed. The paved track is a kind of concrete track using the prepacked concrete technique. The most important thing to design the paved track is to optimize the track structure and materials considering various conditions. Until now, the paved track is verified a various material and structure test. In this paper, it is introduce to the test construction at the urban subway main line. The test construction is completed at Dec. 2007. A major object and substance is a guarantee of construction progress on main line, track performance, construction technique for curved section, transition zone and winter season, recycling the used ballast and application of specific sleeper for sharp curved section.

  • PDF

Defining Level of Service for Railroad System and Analysis of it's Effects on System Planning (철도의 서비스수준의 정의와 시스템 계획에 미치는 영향 분석)

  • Suh, D. Sun-Duck;Shin, Young-Ho
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1594-1611
    • /
    • 2008
  • Level of Service(LOS) is classified A through F in highway system (KHCM), usually using LOS C in express way and D in national road. (LOS C denotes 75% of capacity) Meanwhile in Railroad System, there is no clearly defined LOS, and the daily demand in infra-structure planning has been used. It is very important that LOS provides consequently a consensus of opinion between users and operators because there is a close relation between user demand and level of services. Considering this, there should exist clearly defined Level of Services in Railroad System Planning so that demand can be predicted precisely.

  • PDF

Design of Precast Circular Piers with Prestressing Bars (강봉으로 긴장한 프리캐스트 원형교각의 설계)

  • Shim, Chang-Su;Chung, Chul-Hun;Yoon, Jae-Young;Kim, Cheol-Hwan;Lee, Yong-Jin
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.121-124
    • /
    • 2008
  • Fast construction of bridge substructures is a new trend of bridge design. A precast pier system with bonded prestressing bars was proposed. In this paper, quasi-static tests on precast prestressed piers were conducted to evaluate the seismic behavior of the precast piers with bonded prestressing bars. In order to strengthen the shear strength of the joints between column segments, steel tubes filled with mortar were used. Displacement ductility and energy dissipation capacity of the precast piers were evaluated. The suggested precast pier system showed better seismic performance than the required ductility. Based on the research results, an example bridge pier for light-railway lines was designed and design considerations were discussed.

  • PDF

A Study on Informative ATS (Automatic Train Stop) for Speed Improvement and Increment of Track Capacity on Existing Line (기존선 속도향상과 선로용량 증대를 위한 정보형 ATS 차상장치 개량)

  • Seo Jung-Wook;An Su-Kwan;Kim Bong-Taek
    • Proceedings of the KSR Conference
    • /
    • 2003.05a
    • /
    • pp.456-461
    • /
    • 2003
  • 기존선 속도 향상 및 병목현상 해소와 안전운행을 위해 국내 철도 현황의 주요 분야를 검토한 후, 국내 17년동안 사용으로 안전성이 검증된 신호기술을 바탕으로 국내 실정에 적합하며, 기존의 ATS 장치를 개선한 정보형 ATS(ATPS)를 개발하여 이를 제시하였다. 본 시스템은 운행 중인 열차의 제동특성을 고려하여 구간별 제한속도를 상향 조정하여 운행 효율을 증가 시킬 수 있다. 또, 안전성과 신뢰성 보장을 위해 Fail-Safe 및 이중계(redundancy)로 제작 하였고, 기존의 차상자와 발진기를 통합함으로써 Q factor를 개선하여 무응동 방지 및 기준 응동시간 비교방식을 통해 오동작을 개선하였다. 그리고, 정보기록 장치를 추가함으로써 이미 기록되어있는 차량정보데이터와 지상정보데이터를 연산하여 운전정보를 제공하고 기록한다. 또한, 이 운전정보는 정보 분석용 PC 및 프로그램에 의해 쉽게 분석, 관리가 가능하다. 무엇보다도 기존 ATS 구간과의 겸용사용으로 영업 운전시 안전한 연속 운행 보장 및 지상설비 개량 없이 안전을 확보할 수 있다. 다양한 종류의 동력차에 설치, 인터페이스 및 지상설비 개량이 용이하다. 향후 틸팅 시스템과 연계하여 틸팅 제어/감시 신호를 제공하는 기능을 갖는다.

  • PDF

A Study on the Optimal Divergence Spacing of the Connecting Grounding Rod to the Dangerous Voltage in the Global Earthing Network of Urban Rail Transit (도시철도 통합접지망에서의 위험전압에 따른 연접접지봉의 최적 분기간격에 관한 연구)

  • Jung, Ho-Sung;Park, Young;Kim, Hyeng-Chul;Kim, Jin-Hee;Kim, Jae-Moon;Cho, Dae-Hoon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.9
    • /
    • pp.1374-1379
    • /
    • 2012
  • Urban rail transit tends to global grounding system in order to control ground potential rise and potential differences between electric equipments. In addition, global grounding system can discharge the large capacity surge current to the ground safely. Since some railway electric equipments are installed all section of line, the global grounding system connected with the connecting grounding wire is more effectively. However, if the fault occurred in the connecting grounding wire area, some dangerous voltage is generated. So, the installation of additional grounding rod will be required. In this study, the global grounding system is simulated using CDEGS program to analyze the divergence spacing of additional ground rod depending on dangerous electric potential characteristics. Grounding net of the each station is modelled in depending on the size of the platform, and the spacing of the connecting grounding rod are compared 50m, 100m, 250m and 400m. Simulation results considering of earth resistivity and underground condition of the connecting grounding wire, spacing of the connecting grounding rod is that less than 250m to spacing of the ground rod was appropriately confirmed.

A Study on the Protection Wire Type Decision of Catenary System in the 350km/h High Speed Line (350km/h급 고속전차선로 보호선의 선종결정 기법에 관한 연구)

  • Lee, Hack-Pyo;Seo, Ki-Bum;Park, Jae-Young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.12
    • /
    • pp.1818-1823
    • /
    • 2015
  • In this paper, we analyzed the optimal configuration of protection wire that have been installed in the electric railway power supply system. Protection wires are to suppress the ground potential rise when the short circuit fault between contact wire-rail(C-F), and protect the electronics equipments(signalling and communication) that are facility the wayside. The role of protection wires must be feed back quickly the fault current to the substation when a short circuit fault occurs. In this paper, we proposed that only one line to install the protection wire. Comparing how to newly proposed and existing system, most of the performance is similar. The reason is that most of the current flowing in the protection wire near the location where the fault occurred. There is no problem even if in one line for human safe and the low impedance of the return circuit in dimension to ensure the safety of the facility during the fault. To ensure safety during an fault occurs, it is sufficient even by one line. But, In the protection wire of facilities planning it is necessary to design taking into account the potential utility.

Study on the FEA Model of the Linear Pulse Motor for Railway Application and Reduction of Thrust Ripple (철도차량 추진용 Linear Pulse Motor의 축소 모델 해석 및 추력 리플 저감 연구)

  • Seol, Hyun-Soo;Lee, Gang-Seok;Jeong, Geochul;Lee, Ju
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.6
    • /
    • pp.981-987
    • /
    • 2017
  • In this paper, we describe the LPM structure with a two-phase, which is not used previously, and explain its operation principle. In order to predict the accurate performance of LPM reduction model, finite element model was derived and the back EMF of LPM reduction model was measured and compared. In order to investigate the thrust and normal force of the LPM reduction model, a driving circuit capable of applying two-phase pulse currents was constructed and the performance was predicted in conjunction with the finite element analysis model. Finally, the design considering actual LPM size was performed. Since the size of the reduction model is small, the field could be made of a permanent magnet. However, it is almost impossible to manufacture a permanent magnet to match the size and capacity of a real LPM for a vehicle, in terms of cost and writing. Therefore, the actual vehicle LPM was replaced by wound type that generates a magnetic field by applying current to the field winding, and the final model was derived using the reaction surface method.