In 1st Phase Kyeong-Bu High-Speed Line, to lessen the impact in the transition zone between concrete slab track(in tunnel) and ballasted track(on embankment), the ballast bonding method has been adopted. However, in this area, in the beginning of the operation, unsupported sleepers are found, and the track deterioration and damage of concrete sleepers have occurred. In this paper, the status and causes of unsupported sleepers are discussed and several repair measures are proposed.
Pantograph of high speed rolling stock is one of the key components that transfer of associated technologies was blocked fundamentally from advanced nations. In this study, main technologies related to development of prototype pantograph installed on prototype test train developed according to the project "Development of high speed railway technology" are presented. Status of current korean technologies is explained by presenting developed technologies and applications during the past 6 years from concept design to test and evaluation.
This report was studied about speed-up for main line of KNR(Korea National Railroad) by High Speed Train. The maximum speed of Kyun-Pu line was recorded a 140km/h by Saemaul train in 1985 and the average speed its is a 107km/h now. For operation KTX Kyun-Pu High Speed Train and G7 Korea High Speed Train in KNR line, this report was studied about operation status of High Speed Train in advanced countries, operation situation of train in KNR line and plan of speed-up for main line.
Recently, many Korean firms have been adopting 360$^{circ}$ Degree Feedback System with the environmental change in business world. The reason is that the traditional top-down way of personnel evaluation pattern can not but has many limits in this turbulent changing environment. The main purpose of this article is to depict some aspects of 360$^{circ}$ Degree Feedback System including its current status quo, its positive and negative side, and the effective way of its improvement focusing on A firm.
In the case of the monorail or maglev system, the whole guideway itself in the switching region has to be moved to allow the vehicles to change the track without stopping the run. In this paper we discuss what has to be considered in the design of the EMS type maglev guideway switches and report the development status quo of the maglev guideway switch of Korean maglev UTM-01.
Communication network in KTX (Korea Train eXpress), the express train system, has to transmit status variables periodically within tens of seconds and real-time control informations which has short reply like status transition or alarm. KTX uses $Tornad^*$ (TOken Ring Network Alsthom Device) network for this purpose. This network can send and receive messages which enable express train applications embedded in intelligence boards to communicate by itself. Layer 1, 2 of $Tornad^*$ is implemented with differential manchester encoding and IEEE 802.4 standard(token bus standard) respectively. To implement layer 1 and 2, we implemented twisted pair modem using FPGA for layer 1 and used MC68824 from Motorola for layer 2. MC68824 bus arbitration and memory controller is implemented using CPLD.
Many structural engineers believed that RC underground structures like subway system might not be seriously damaged during earthquakes, until the Great Hanshin earthquake(a.k.a Kobe earthquake). But there is only one domestic seismic code of rapid transit system that established by Ministry of Construction & Transportation in 2005. Therefore, to investigate of current status on seismic design and evaluation method of rapid transit system is essential to estimate seismic performance of subway structural systems. In this study, comparing domestic codes and seismic evaluation methods with foreign system is performed.
To minimize the train operation interruptions and train exchanges, the RF transmission system is proposed. The current control room of the Seoul Metro has information of the train movement through the Total Traffic Control System, but it does not have information of the train itself, rail status, and other facilities' status. When some trouble occurs during train operation, the train crews should report the control room about the trouble and fix it. If the control room has exact information of the trouble, the expert in the control room can help the crews to fix the trouble swiftly and exactly. Since the crews are busy taking care of the trouble, they often miss to report the control room on time. The proposed RF transmission system relays the information of the train to the control room automatically in real time, and makes it possible to provide the passengers good service by reducing the train operation interruptions and train exchanges.
Typically, we regularly have carried out a technical review to know a progress status and outcomes of a project to the appropriate technical plans. But during the technical review executed at a planned point of time, lots of problems; reports of an ambiguous progress status and outcomes, a discordance between opinions, and an hour's delay, have been occurred. To solve those problems an early stage, an informal reviews are executed before the formal technical review. One of the informal review is the Peer-Review. This paper is a matter of the effective and efficient Reer-Review process utilized in performing the national research and development project. Additionally, it was presented a general misunderstanding and improvement plan about the Peer-Review.
This paper defines the Safety Management System(SMS) based on the rail safety act and surveys the status of the English rail SMS and International Civil Aviation Organization (ICAO) SMS and OHSAS18001 SMS. Through the investigation of establishment and implementation status of domestic rail operators' SMS, the improvement directions of the current rail SMS are developed. First, to establish the continual improvement system for SMS, the guide which describe detailed continual improvement method for each steps of SMS including management review by CEO shall be established and implemented. Second, to settle the SMS based on the risk management, it is necessary to endeavor for converting the rail operators mind and to establish the supply system of operating model and basic data and to define the requirement precisely and to include in the related guide for the risk management.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.