Abeno Harukas is the tallest building in Japan and is located in Abeno, which is one of the three main railway transport nodes in Osaka. This building has a height of 300 meters, and its lowest levels are 30 meters below ground. It contains a department store, museum, offices, a hotel, and an observatory. In this urban renewal project, a section of the department store that encloses the station was dismantled and replaced by a supertall building complex, while infrastructure was simultaneously constructed, including: upgrades to the station and the existing department store, improved connections to the subway and pedestrian bridges, and a new pedestrian walkway over the road. In this paper, the ingenious erection processes, newly developed technologies, and precise construction management techniques are introduced for Japan's tallest building.
Railroad a field of basic industries in Korea had developed as representative transportation means in the interior. But since the 1970s, its transport requirement decrease had influenced in reduced earning. Thus railroad try to find a various subsidiary earning creations. Among the various subsidiary earning creations, a plan of privately financed station buildings is constructing and using. For the mean time the privately financed station have been constructed by in a narrow sensible development. But now like a Yongsan areas surrounding stations development, comprehensive development think over surrounding stations in a wide sensible development. Yeongdeungpo Station the traffic center of the south part in Seoul had been constructed by privately financed station of Lotte Shopping Co. after 1987. Yeongdeungpo Station constructed station building is a successful example for profitable. The successful instance of Yeongdeungpo privately financed station investigates and devises comprehensive development as thinking over surrounding stations for more and more benefits.
Great impetus has come from the renewed emphasis on improving public transport in many countries. In Korea, built over 12 years at a cost of ${\$}12$ billion and modeled on the TGV of France, the Korea Train Express will open for regular traffic on April, 2004. The schematic design of terminal building for Kwang-Myeong station was chosen by the international competition in 1997. Mooyoung Architects and Engineers joined with AREP, French Architect awarded.
Railway has been pointed to the efficiency of transportation, rapid transit, and comfortable train ride. the construction of railway near the downtown area and station building are increasing for maximization of utilization and convenience. but the heavy of transportation and rapid transit lead to increase noise and vibration. the noise and vibration of railway may cause the civil appeal, decline in the serviceability and insufficiency of environmental standard. In this study, floating slab system which is one of the solution to avoid noise and vibration in railway has been introduced, and analyzed floating Slab Track into arrangement of reduction material of vibration. As a result of analysis, It was estimated the bearing installation though slab have not a negative factor and terminal arrangement of reduction material of vibration have advantage for static behavior.
The operation of express train on the Seoul Metropolitan Subway Network is centered on the Kyungbu and Kyungin lines and the short section between Dongducheon station and Ganyung station which is 20.7km long. It is true that the needs of many customers who want to reduce their commuting hours by express train is not satisfied. This paper proposes that the operation of express trains be enlarged to Sungbuk station on Kyungwon line which comes to 34.9 km long, and to Yangsu station from Youngsan station on Jungang line. The type of operation is mixed one with high and low speed trains, which operates express train by use of existing siding tracks without improving facilities such as extra building of sidings. This pragmatic study is to apply the goal of reducing running time as express train and to suggest the selection of appropriate stops, effectivenes analysis of express train operation and formation of train diagrams to actual operation.
The monorail system as new transportation system mostly has being constructed as an elevated construction. In particular, in case of construction to elevated structure in the center of a city, it is important to decision for a monorail station to be considered the minimization. We must purchase the required lands prior to design the monorail stations because of separation of a platform and a waiting room. So We can exclude the problem that it have too close between a monorail station and the other building. Therefore the standard width and elevation of the monorail station shall be considered the efficient execution, economic and transportation. We have many thing to resolve as the plan of minimization to the station of monorail. But we know the ultimate in environmentally friendly transportation, of course, is our monorail system and we are positive as to a popular transportation craze.
Railway has been pointed to the efficiency of transportation, rapid transit, and comfortable train ride. the construction of railway near the downtown area and station building are increasing for maximization of utilization and convenience. but the heavy of transportation and rapid transit lead to increase noise and vibration. The noise and vibration of railway may cause the civil appeal, decline in the serviceability and insufficiency of environmental standard. In this study, floating slab vibration and repeated connection of devices to support joints and fatigue stress analysis of punching shear performance review was conducted to evaluate the safety.
In order to account for a price variation of apartment that places near a newly constructed subway station, a spatial hedonic model was developed to examine spacial characteristics that affect a purchasing price of an apartment using a White Estimator. In particular, the paper aims to examine various effects of subway 7 construction on an apartment price in Seoul Metropolitan Area. As explanatory variables, an apartment size, distance to a closest subway station, distance to the Central Business District (CBD) of Seoul, the number of years after building, and a lagged variable of the apartment purchasing price were used. The lagged variable plays a role of representing a spatial weighted average of previous prices of other apartments that locate within 3 km from the apartment. For a precise study, an entire sample was divided into two sets, southern area and southwestern area of Seoul, and two different spatial hedonic models were estimated. Not only before and after analysis, but also with and without analysis were conducted to compare with different effects of the spatial characteristics of two areas. The results show that before the construction of the subway 7, the prices of the apartments in the southern area were more sensitive to the apartment size, the distance to a closest subway station, the distance to the CBD, and the prices of the other apartments locating within 3km rather than those in the southwestern area. After the construction, on contrast, it is found that the apartment purchasing prices in the southwestern area are more sensitive than those in the southern area due to people's expectation regarding a new development around the subway station. In addition, the prices of the apartments locating closely with a transfer station are more likely to go up by increase in the apartment size, the distance to the station, and the prices of the other apartments within 3 km. Compared with the negative effects of the distance to the station on the prices in the other models, the positive effect of the distance to the transfer station might be caused by the characteristics of commercial area in which people are not likely to live.
도시철도 출입구 규모는 이용자의 수요에 따라 산정되어야 하나, 우리나라는 일률적인 값을 적용, 출입구 위치에 따라 이용자의 편차가 많이 발생하여 불편을 겪는다. 최근 교통약자편의증진법에 의해 에스컬레이터, 엘리베이터 등의 이동편의시설의 설치가 의무화되고 있지만 기존 역의 경우 이용자 수요와 상관없이 설치 가능한 곳에 주로 배치가 되기 때문에 실질적으로 이용이 많이 불편하다. 이동편의시설 위치 및 규모가 역 설계 또는 건설시 반영될 수 있도록 본 연구에서는 역 출입구별 이용수요를 예측하여 출입구의 이동편의시설 규모 산정 모형을 정립하고자 한다. 이를 위해 역별 승하차 이용수요, 철도역 주변 용도별 건물 연상면적을 활용하여 1일 수요 예측을 위한 다중회귀모형식을 수립하였다. 추정된 모형의 검증을 위해 동대문역과 종각역의 실제 데이터를 이용하였으며, 추가적으로 국내외 에스컬레이터 산정식을 활용하여 출입구별 에스컬레이터 설치 규모를 비교/분석하였다. 그 결과 단일역을 대상으로 이용수요를 추정하는 것이 좀 더 정확하였으며, 종각역은 1번 출구에 상하행 에스컬레이터가 설치되어 있으나, 4번 출구에 설치하는 것이 타당한 것으로 분석되었다. 본 연구는 2018년 게재한 도시철도역 출입구 유출입 이용자 추정 모형 수립 논문의 발전된 형태로 향후 역 신설시 또는 이동편의시설물 설치 및 확장시 활용될 수 있을 것이라 판단된다. 더불어 현재 무분별하게 설치하는 에스컬레이터 설치 기준의 기초가 될 것으로 보인다.
According to 'Metropolitan Traffic Network Plan' announced in 2001, radial railways which connect Seoul with satellite cities around Seoul appear gradually. And followed by this, social demand for circular metropolitan railways that can connect the radial railways horizontally is increasing. But existing plans about circular metropolitan railways has limits to propose only passing cities of the railways. If there is no detailed guideline for circular metropolitan railways, the each railway for circular line will be constructed individually and then it will be not effective circular railways totally. Additionally that railway project will be easily interrupted by popular complaints. Therefore "The basic plan for circular metropolitan railways" is needful to guide a right direction for circular metropolitan railways. In this paper, rough track diagram of 'node' station for circular metropolitan railways is proposed. It is essential part of the basic plan. If the track diagram of a node is publicized in advance and individually lines of circular metropolitan railways is enforced to followed it, all lines will has rich circular functionality. Finally, effective circular metropolitan railways can be built.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.