• Title/Summary/Keyword: Railway Safety Project

Search Result 120, Processing Time 0.033 seconds

Verification of Running Safety Evaluation Method for High-speed Railway (고속열차 주행안전성 평가법에 대한 검증 연구)

  • Ryu, Sang-Hyun;Kim, Sang-Soo;Kim, Dae-Sik;Kim, Sang-Young;Hong, June-Hee;Lee, Ki-Jun
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.23 no.3
    • /
    • pp.310-317
    • /
    • 2014
  • The Next-generation High-speed Rail Technology Development Project was started in 2007 by the Korean Government with the aim of developing the core technologies for a high-speed electric multiple unit (EMU) railway system. This is the first attempt to develop a high-speed EMU railway. High-speed EMU trains have superior acceleration and deceleration compared to push-pull high-speed railways such as KTX(Korean Train eXpress). A prototype train was developed and tested on a high-speed line starting in 2012. The new train must maintain running safety during the test. Generally, the international standard (UIC518) is adopted to evaluate the running safety of trains. This method suggests that the test zone must have over 25 sections, and the length of each section must be 500 m. However, it is difficult to implement these test conditions for a real high-speed line. In this study, we analyzed the running safety using several test section lengths (100 m to 500 m) and compared the results. The results of this study will be used to establish a running safety evaluation method for high-speed EMU railways.

A Development Plan for PMIS based on Total Life Cycle (전수명주기를 고려한 PMIS개발 방안)

  • Park, Soo-Choong;Lee, Seong-Gwon;Jung, Kye-Young;Kim, Jae-Jin
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1282-1288
    • /
    • 2011
  • Recently, the demand regarding reliability and safety of the railroad are increased as built to high-speed railway and Driverless LRT systems. Accordingly, effective management of construction projects is being applied, with the introduction and use of PMIS computerized systems. Due to the construction of railways, from the start of PMIS research planning, design, procurement, to construction and commissioning, various expertise is being carefully gathered, and by integrating it into the unified budget ideas and processes, rational, efficient, organized, and manageable financial plans are developed for the computerized system. However, the current PMIS does not take into account the life-cycle. Therefore, this study is to bring attention to the BIM smart BOM-based configuration management for life-cycle through the consideration for railway construction project management.

  • PDF

A Study on the Performance Elevation Methods of Next Generation Railway Freight Vehicles (차세대 철도화물차량의 성능향상방안에 관한 연구)

  • Ham Y.S.;Hong J.S.;Oh T.Y.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.351-354
    • /
    • 2005
  • Research purpose of this project is intending Maintenance Free of freight car and speed up of freight train. At goods transport as heightening traveling by ship speed of freight train shortening raise railway share of physical distribution and stand on tiptoe to Northeast Asia physical distribution main country to contribute expect. This paper is the performance elevation methods of next generation railway freight vehicles.

  • PDF

Reliability Analysis of the railway signalling system which applied to the KNR ERP(Enterprise Resource Planning) Classification System (철도경영혁신 ERP 분류체계에 따른 철도신호시스템의 신뢰성 분석)

  • Cho, Rae-Hyuck;Park, Chae-Young;Min, Young-Hee;Yun, Hak-Sun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.993-999
    • /
    • 2007
  • With the introduction of the RAMS(Reliability, Availability, Maintainability, Safety), the interest of the system assurance has been increased. First of all, fast-growing electronic circuit requires analyzing the failure rates, by dividing the signalling system more specifically. Since 2005, the K.N.R (Korean National Railway) has incorporated ERP(Enterprise Resource Planning) in order to establish the complete status as the top international comprise, therefore while ordering the project, it has established the classification system and then has been applying to ERP system in 2007. Due to the complex of the classification system, the reliability analysis of the signalling system was assessed with the limit of IXL ATP with On-board and wayside equipment. This paper assumed MTBF(Mean Time Between Failure), MTTR((Mean Time Between Repair) of total signalling system, by using the classification of ERP program.

  • PDF

Proposal for Specification of Counter-measurement in Frost-Heave System in Railway Underpass Box Structures in North Korea Considering Climate Condition (북한지역 기후조건을 고려한 철도횡단구조물의 동상방지방안 제시)

  • Kim, Mun-Su;Cho, Kook-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.1
    • /
    • pp.99-110
    • /
    • 2017
  • As a part of several Eurasian initiatives, the Korean government is trying to reconnect railways through North Korea to the Asian continent. If South Korea could build a network using railway, it would be a chance to develop a robust economic environment and to motivate economic growth. In the railway reconnection project between North and South Korea, the most important part of the railway roadbed sector is repair or improvement, and then construction of a new line through North Korea. There are not many big differences in the geological conditions; however, climate condition varies greatly during winter. The most significant condition in the safety of railway operation is frost-heaving. However, since South Korea has a relatively mild climate condition compared with North Korea, design and construction specifications under severe weather conditions in winter have not been prepared. This study proposes a plan for revising the railway design standard for underpass structures through an analysis of international standards, leading to site construction to prevent frost-heave.

Development of the technology to verify the systems interface for the High speed Electric Multiple Unit (차세대고속철도기술개발사업 시스템인터페이스 시험기술 개발)

  • Kang, B.M.;Jeong, S.G.;Ahn, H.K.;Choi, H.C.;Yu, S.W.
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.810-815
    • /
    • 2010
  • Since a long time ago, many railway engineers analyze and discuss the interface between the sub-system of railway, such as a wheel/rail interface, pantograph/catenary interface etc. The verifying of the system interface could help to achive the optimized performance and safety of the railway system considering that the railway system is constructed by various engineerings, such as civil, mechanical, electrical, etc. A rolling stock with distributed drive system, which will be developed by HEMU-400x project, is capable of running on high speed line and conventional line in Korea. To verify the performance of rolling stock, test run will be done with revenue service line. And the test items of the system interface have to be selected to verify a functional compatibility and physical force between rolling stock and infrastructure. In this paper, the authors will indicates the test items to verify system interface. To achive the conclusion, the authors analyze a specification of the development train and the design value of Seoul-Busan high speed line, which will be used for testing of the development train, and also, study the various case of high speed train commissioning.

  • PDF

A Study on the RAMS Analysis of Urban Maglev Train Control System (도시형자기부상열차 열차제어시스템 RAMS 분석에 관한 연구)

  • Yun, Hak-Sun;Lee, Key-Seo;Ryou, Sung-Kyun;Yang, Dong-In
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.6
    • /
    • pp.515-525
    • /
    • 2011
  • In this study, Urban maglev is applied to inductive-loop speed and position detection system for the top-level classification system for the entire system, and performed functional analysis On-board signal equipment, Wayside-signal equipment divided by the reliability, availability, maintainability, and safety through analysis of the proposed formula. RDB and by applying a system service for each device was calculated to availability, safety analysis. The PHA, FMEA, HAZOP over the Top Event of the FTA is performed by presenting the results. This also shows approach methods and relative activities for project to accomplish and ensure the system requirements.

KTX-II RAMS Application Standard for Safety of Passenger Transportation Service (안전한 고객수송서비스를 위한 KTX-II RAMS 적용기준)

  • Cha, Jae-Hwan;Chung, In-Soo;Jo, Kwang-Woo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1525-1538
    • /
    • 2008
  • Currently, it has been a fashion to include RAMS of rolling stock in the order for purchasing the rolling stock. However, it's only to suggest a qualitative value or an ideal target without giving or demonstrating actual RAMS target, with only demonstrating passive RAMS by the data provided by the manufacturer. In the case of KTX project of 100 cars of KTX-II contracted in June 2006, their target has been suggested from the previous RAMS application standard and it aimed to achieve the reliability level of equivalent high speed rolling stock. Afterward, as actual KTX-II RAMS Plan and RAMS Demonstration Plan has been prepared and approved, it has been the first problem to secure the reliability and safety in order to introduce the new high speed rolling stock(KTX-II) successfully and we actually tried to apply overseas RAMS standard, KTX samples, electric railcar MTRC and rolling stock samples. This Report was dealt world trends of Railway RAMS standard, KTX-II RAMS Specifications, the present condition of KTX-II RAMS performance and development a way of KTX-II RAMS, We hope the "KTX-II RAMS Application Standard for Safety of Passenger Transportation Service" is served as an opportunity for the basic research for establishing and demonstrating RAMS target of components or parts composing the rolling stock system.

  • PDF

Survey on the Adoptability of IT and Smart Sensor Technologies into the Next-Generation High-Speed Train (차세대 고속전철에 적용할 IT 및 스마트센서 기술의 수용성에 관한 조사 연구)

  • Chang, Duk-Jin;Kang, Song-Hee;Song, Dahl-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.5
    • /
    • pp.649-655
    • /
    • 2009
  • To join the leading four countries in high speed railway technology, the next generation high speed railway technology development project is undergoing. And, applying the IT for the safety and convenience of a passenger and an attendant is one of the research topics of the project. From the 24 derived candidate IT applications, the seven applications, such as information on an individual LCD monitor, an emergency or reminder notification, an Internet connection, remote communication with an attendant, air quality monitoring, extraordinary noise detection, and detection of an emergency in the lavatory, were selected to be implemented on the next generation train. In this paper, we presented the survey that was performed to make the selection process to be objective. Additional findings, such as what other services a passenger wishes to be provided, what activities passengers prefer to do based on duration of the trip, and things that make a passenger discomfort, were summarized.

Appropriate Rate for Estimating Safety Management Cost in Civil Work (토목공사 안전관리비 적정요율 산정)

  • Son, Ki-Sang;Lee, Gi-Tae;Park, Jong-Keun;Park, Jung-Bong
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.4 s.76
    • /
    • pp.73-84
    • /
    • 2006
  • Standard safety management cost system was established in 1988 as a decree Number of 88-13, first time. And then, it has been revised fourteen times, up to now. A lot of practical investigations have been made for the revision but many problems at sites are continued to be put out so that it should be revised. This study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. Budget and actually performed amount of safety management costs in this study are investigated. costs for temporary work which is clarified in Japan is collected in order to compare domestic cost rate with Japanese one related to the total project amount. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basical data and material to be systemized.