• Title/Summary/Keyword: Railway Safety Project

Search Result 120, Processing Time 0.027 seconds

A study of relation-ship on Safety activites and development systems for Integrated Centralized Traffic Control(CTC) S/W (통합사령실의 소프트웨어 개발에서 안전성활동과 개발시스템의 관계에 대한 연구)

  • Kim, Won-Kyong;Ohn, Jung-Ghun;Change, Sang-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.928-931
    • /
    • 2007
  • In answer to the increase of demand for the safety in railroad, the safety activities are tried out. According to 'KORAIL Instruction number 2001-49', the project for developing Integrated Centralized Traffic Control Center has been carried out and the safety activities are guaranteed by documents named 'Safety Plan' and 'Safety Requirements' from this project. However the development system is not enough for the full safety activities. Therefore this paper we describes the relationship of safety activities and development systems and proposes the efficient direction of safety activities.

  • PDF

Safety Case for AREX's E&M System (공항철도 기전시스템의 종합안전대책기술서)

  • Lee, Chang-Hwan;Lim, Sung-Soo;Song, Mi-Ok
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.280-288
    • /
    • 2007
  • This paper is based on the safety case as specified in the E&M system safety management plan established in initially AREX project. The safety case for E&M system is the synthesis of all safety activities throughout the design, manufacturing, installation and commissioning test for E&M system. The safety level of E&M system which is required by E&M contract is assured by accomplishment of safety activities and procedures in accordance with EN standards.

  • PDF

A Study of RAMS Analysis and Assessment Activities for Automatic Train Protection System based on ERTMS/ETCS Level 1 (차상신호시스템(ERTMS/ETCS Level 1) 적용에 따른 위험분석 및 평가활동 연구)

  • Shim, Kyu-Don;Lee, Jong-Woo
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.2
    • /
    • pp.121-129
    • /
    • 2011
  • This paper presents the methods to acquire the Safety Certificate from Independent Safety Assessment based on the IEC or EN standard which is commonly applied to railway system for Automatic Train Protection (ATP) system in accordance with ERTMS/ETCS Level 1 system. This also shows approach methods and relative activities for project lifecycle to accomplish and ensure the system requirements of ATP system, RAMS and system quality activities. These kind of activities for quality assurance of ATP system to obtain Safety Certificate could improve the quality of domestic railway system based on On-Board system of ERTMS/ETCS Level 1 and also contribute to the growth of railway business.

BIM-based Smart BOM by the Configuration Management of the Life-cycleconsidering the Railway Construction Project Management System and Method (BIM 기반/스마트 BOM의 형상관리에 의한 전 생명주기를 고려한 철도건설사업관리 시스템 및 방법에 관한 고찰)

  • Chung, Su-Young;Lee, Jong-Seong;Park, Soo-Choong;Lee, Geun-Young
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2280-2285
    • /
    • 2011
  • As the prefecture railroad construction accelerates, unmanned system's reliability and safety is increasing in demand. Accordingly, effective management of construction projects for the PM and SE techniques are being applied, with the introduction and use of PMIS computerized systems. Due to the construction of railways, from the start of PMIS research planning, design, procurement, to construction and commissioning, various expertise is being carefully gathered, and by integrating it into the unified budget ideas and processes, rational, efficient, organized, and manageable financial plans are developed for the computerized system. However, the current PMIS does not take into account the life-cycle. This study is to bring attention to the BIM smart BOM-based configuration management for life-cycle through the consideration for railway construction project management.

  • PDF

A Study on the Applicability Improvement Enhance of Rolling Stock Safety Regulation (철도차량 안전규정의 현장적용성 개선방안 연구)

  • Lee, Chang-Guen;Lee, Soo-Ryong;Wang, Jong-Bae
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1570-1594
    • /
    • 2008
  • Nowadays there are lots of changes in the domestic railroad industries because of the reorganization in the industries, operation of KTX and expansion of city train in local areas. To cope with these changes effectively, domestic & abroad safety guideline and regulation were investigated and reviewed by railroad safety technical development project. Based on this project, domestic rolling stock safety regulation was established in the July and December on 2005. It's been a 3 years after 2005 and to confirm whether there are some problems to applicate the regulation in the field like korail, the necessity of reviewing the regulation gains force. In this study, to improve the field application in rolling stock safety regulation, we investigated the results of integrated railroad audit system and internal safety regulation system in a train operator and also collected the opinions from train manufacturer. Then through the result of investigation and collection of the opinions, we proposed the amendment to the rolling stock safety regulation.

  • PDF

Establishment of Product Data Management for Advanced EMU (차세대전동차 정보관리시스템 구축에 관한 연구)

  • Lee, Han-Min;Kim, Gil-Dong;Oh, Seh-Chan
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1418-1422
    • /
    • 2006
  • The project of advanced urban transit system development is developing the advanced vehicle and the core technologies for the cost down by system change, the transport safety and the environmental friendliness and the improvement of passenger service. The product data management system is installed for management of each project. Various data and informations producted from each project are made for database. Therefore, we develop the product data management system.

  • PDF

Stochastic Channel Modeling for Railway Tunnel Scenarios at 25 GHz

  • He, Danping;Ai, Bo;Guan, Ke;Zhong, Zhangdui;Hui, Bing;Kim, Junhyeong;Chung, Heesang;Kim, Ilgyu
    • ETRI Journal
    • /
    • v.40 no.1
    • /
    • pp.39-50
    • /
    • 2018
  • More people prefer using rail traffic for travel or for commuting owing to its convenience and flexibility. The railway scenario has become an important communication scenario in the fifth generation era. The communication system should be designed to support high-data-rate demands with seamless connectivity at a high mobility. In this paper, the channel characteristics are studied and modeled for the railway tunnel scenario with straight and curved route shapes. On the basis of measurements using the "Mobile Hotspot Network" system, a three-dimensional ray tracer (RT) is calibrated and validated for the target scenarios. More channel characteristics are explored via RT simulations at 25.25 GHz with a 500-MHz bandwidth. The key channel parameters are extracted, provided, and incorporated into a 3rd-Generation-Partnership-Project-like stochastic channel generator. The necessary channel information can be practically realized, which can support the link-level and system-level design of the communication system in similar scenarios.

Software Quality Assurance Activities of Automatic Train Control System to meet Requirements of the IEC 62279 Standard (IEC 62279 요구사항 충족을 위한 열차제어시스템의 소프트웨어 품질보증 활동에 관한 연구)

  • Shim, Kyu-Don;Lee, Jong-Woo
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.4
    • /
    • pp.412-418
    • /
    • 2010
  • This paper presents the methods to acquire the Safety Certificate from Independent Safety Assessment based on the IEC standard62279 which is commonly applied to railway system for Automatic Train Control(ATC) system in accordance with Urban Maglev project. This also shows approach methods and relative activities for project life- cycle to accomplish and ensure the system requirements of ATC system, RAMS and S/W quality activities. Furthermore, the key tasks conducted with ISA are noted in detail. These kind of activities for software quality of ATC system to obtain S afety Certificate could be a CASE model to improve the quality of domestic railway system and products, and also contribute to the growth of railway business and toward the achievement of overseas' railway signaling markets.

The Safety Program Plan of the LRT(Light Rail Transit) System (경량전철시스템의 안전성구축방안)

  • 정락교;윤용기;목재균;이병송;최규형
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.586-593
    • /
    • 2000
  • This paper describes a safety program plan of the LRT(Light Rail Transit) project. The SPP is a management document that describes the system safety objectives and how they will achieved so it embodies principles, methods and 1)lattices commonly used in the transit industry. In a Preliminary Hazard Analysis phase, the hazard analysis of collision and derailment is carried out. In this paper we make a definition of hazard that hazard is consist of an inner part(means a reliability) and an outer part(means a fire, flood and earthquake). Also safety principles for infrastructure, stations, electric traction system, railway control of system and train are performed.

  • PDF

Develope the Product Verification Process for the National R&D Project (국가연구개발프로젝트의 성과물 검증 프로세스 개발)

  • Choi, Yo-Chul;Cho, Yeon-Ok;Kim, Sang-Am;Yoon, Heck-Jin;Lee, Jae-Cheon
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1566-1573
    • /
    • 2008
  • Generally, a system or service is verified by requirements if it has met them in transforming customer requirements into a system or service. But as the national research and development projects to develope safety systems or standards or process in railway system domain, it can be quite limiting that the product or systems verification process presented the international or industrial standards to be applied. This paper has analyzed and made up for the general verification process and presented the effective and efficient verification process about safety system, safety standard, process, and safety documents and the methods to manage the outcomes of verification process.

  • PDF