• Title/Summary/Keyword: Railway Network Design Problem(RNDP)

Search Result 2, Processing Time 0.009 seconds

A Railway Network Design Problem Considering Passengers Route Choice (철도승객의 노선선택을 고려한 철도망 설계모형 연구)

  • Lim, Yong-Tae k;Jang, Jun-Seok;Park, Jin-Kyung;Lee, Jun
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.6
    • /
    • pp.581-587
    • /
    • 2008
  • This paper presents a railway network design problem (RNDP), which can be formulated as a bi-level program. In bi-level program upper level program is to minimize total travel cost including the construction cost of the railway facilities, whilst lower one describes the railway route choice behavior of passengers. We also propose a heuristic method for solving the program because it is a kind of NP-hard problem. From two numerical railway examples, we confirm that the RNDP and its algorithm produce a reasonable solution and that it is applicable to real world.

High-speed Rail Infrastructure Priority Decision Making on Level of Design Speed by Rail Network Design Problem (철도망 설계모형을 이용한 설계속도 수준별 고속철도망 투자우선순위 선정)

  • Park, Jin-Kyung;Lim, Yong-Taek;Lee, Jun;Eom, Jin-Ki;Moon, Dae-Seop
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.3
    • /
    • pp.427-436
    • /
    • 2009
  • This paper introduced Railway Network Design Problem (RNDP) to provide priority decisions on high-speed railway investment scenarios defined by various network segments and train systems. The RNDP optimizes the objective functions of minimize total travel time. Results show that the priority of high-speed railway investment is found to be East-west, West-coast, and South-coast line respectively. An entirely new line built with 400km/h is found to be the best alternative to East-west line. Regarding West-coast and South-coast line, the combined alternative of upgrading Geolla and Kyeonjon line with 200km/h and building a new line with 400km/h and 350km/h for remains of each line is the best.