• Title/Summary/Keyword: Railroad tunnel

Search Result 235, Processing Time 0.028 seconds

Case Study of Environmental Impact Assessment about Groundwater Outflow during Railroad Tunnel Construction (철도건설사업시 터널지하수 유출에 관한 환경영향평가 사례 연구)

  • Lee Jeongho;Yoo Heonseok;Lee Young Soo;Park Chang Sug
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.303-308
    • /
    • 2004
  • It is recently reported that the importance of environmental impact assessment(EIA) about groundwater outflow problems is beingy raised in the case of tunnel excavation during railroad construction. The EIA about groundwater outflow into railroad tunnel is generally performed using the results of numerical analysis embodied through groundwater flow modeling program like MODFLOW. The basic data for this modeling include (1) the geological and hydrogeological investigation data along the planned block of tunnel excavation, (2) total amount of outflowed groundwater during tunnel excavation, and (3) the status of groundwater level fluctuation in the water-supply wells distributed in the planned block of tunnel excavation. In this study, the authors analyzed the cases of the computational modeling about groundwater outflow in three planned blocks of railroad tunnel, and suggest the environmental impact factors and mitigation plan during EIA of tunnel excavation in railroad construction.

  • PDF

The Quantitative Risk Assessment for Railroad-tunnel Fire Incidents by using CFD code (CFD code를 이용한 철도터널 화재 위험도 평가)

  • Kim, H.B.;Lee, D.H.;Jang, Y.J.;Jung, W.S.
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.169-172
    • /
    • 2011
  • Recently, railroad long tunnels are increasing and growing longer due to topological feathers like a lot of mountain in Korea. But fire disaster of a long tunnel cause many people to injury and death. For that reason, at the early design stage of a long tunnel, risk assessment and mitigation measure of risk for satisfying tunnel safety are required. According to the railroad facility safety standard (Korean MLTM Announcement No. 2006-395), risk assessment for railroad-tunnel fire should be performed when design stage. Therefore, various methods of risk assessment for tunnel fire have been studied and applied. In the paper, QRA(Quantitative Risk Analysis) for fire risk assessment by using CFD code is presented and the usefulness of CFD is discussed.

  • PDF

Construction Planning and Design of a Long Tunnel (장대 터널의 계획과 설계)

  • 장석부;윤영훈;김용일;김진한
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.117-124
    • /
    • 2000
  • This paper presents the construction planning and the detail design of a 16.2 km long railroad tunnel in a mountainous area. Major design conditions for railroad are the single track, loop-typed alinement, and a maximum grade of 24.5$\textperthousand$. A underground station(double track) with a length of 1.1km is located in the middle of the line for train cross-passing. Tunnel is excavated in highly complex geological conditions including faulted areas, abandoned mine works areas, and various rock types such as sandstone, shale, limestone, and coal seam partly. Drilling and blasting method was adopted because it is more flexible than TBM(Tunnel Boring Machine) as a result of risk assessment for geological conditions in this area. Two working adits were planned to adjust the construction schedule and can be used for ventilation and maintenance in operation phase. New material and concept were introduced to the tunnel drain design. They are expected to improve tunnel drain condition and capability. Rational tunnel support design was tried to consider the various tunnel size and purpose and to use the geological investigation results.

  • PDF

Estimation of RPS Method Using 3-Dimensional Numerical Analysis (3차원 수치해석을 이용한 RPS 공법의 적용성 평가)

  • Roh, Jeong-Min;Shin, Eun-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.2 s.33
    • /
    • pp.174-179
    • /
    • 2006
  • Recently, the crossing tunnel has been constructed frequently to connect the separated area by highway and railroad. The construction of crossing tunnel must be progressed while maintaining the existing traffic of the highway as well as railroad. There are many cross funnelling methods such as NTR, TRCM, Messer Shield, Front Jacking, and Pipe Roof Method. The advantages of adopting RPS(Roof Panel Shield) method in crossing tunnel construction with comparing other existing cross funnelling methods are needed a little volume of concrete and easy to change the direction of cutting shoe during the construction of pipe roof, The 3-dimensional numerical analysis of RPS to consider the arching effect was performed for the application in the crossing tunnel under railroad. The earth pressure distribution and settlement were predicted when the RPS method was applied during the excavation for crossing railroad tunnel construction.

Prediction of Reduction of Traffic(Railroad) Noise using Soundproof Tunnel in a high-rise apartment building (고층 주거지역에서 터널형 철도 방음 시설의 소음 저감 예측)

  • 김준엽;나희승;엄기영;조준호
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2001.05a
    • /
    • pp.843-848
    • /
    • 2001
  • Railroad noise is one of the main causes of environmental impact. Whenever a new railroad line is planned or a housing project near an existing railroad is proposed, an estimate of the relevant noise levels is usually required. For this, it is necessary to quantify those parameters that affect the railroad noise. This paper deals with an estimation of railroad noise using soundproof tunnel in a high-rise apartment building

  • PDF

A Case on Excavation Plan and Design of Adjacent Railroad Tunnel (근접 철도터널의 굴착계획 및 설계 사례)

  • 김선홍;정동호;석진호;정건웅;서성호
    • Explosives and Blasting
    • /
    • v.20 no.3
    • /
    • pp.59-71
    • /
    • 2002
  • The points of this design case are the planning and excavation method of a new double-tracked railroad tunnel which is approx. 11∼22 meters apart from existing single-tracked railroad tunnel. For the optimum excavation method some needs are required in design stage, such as the reduction of noise and vibration, public resentment, damage of buildings and construction costs. Hence the estimation and application of allowable noise and vibration criterion is important. The ground coefficient (K, n) of this site is determined by field trial blasting. The excavation method is chosen to satisfy the allowable noise and vibration criterion. In addition, in order to ensure the stability of existing single-tracked railroad tunnel, the instrumentation of maintenance level is accompanied during the construction stage. As a result of this design condition, central diaphragm excavation with line drilling and pre-large hole boring blasting is applied to the area within 15 meters apart from existing tunnel. And above 15 meters apart, pre-large hole boring blasting is designed.

A research on the tunnel insulator pollution characteristic in Korea Railroad (철도 터널구간 애자류 오염도 분석에 관한 연구)

  • Jeon, Yong-Joo;Lee, Tea-Hoon;Choi, Kyoung-Il;Lee, Shi-Bin;Han, Sang-Gil
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.1169_1170
    • /
    • 2009
  • This paper introduces insulator pollutant accumulate pattern in the tunnel of korea railroad. To accomplish this goal, effective sample collecting method was proposed for the first step. Dust at the surface was collected directly. Distilled water and brush was used while collecting. Through this method dust is easily and accurately collected. The second step is pollutant analysis. Several analyze item is selected such as quantity, conductivity, contact angle, Optical Microscope(OM), IR, Equivalent Salt Deposit Density(ESDD), and ICP-AES. The third step, best represent tunnel was selected considering location, length and natural surroundings. Also to consider the difference at inside the tunnel, several bracket insulators were selected along to the location. To make the result precise, above procedure was repeated several times at the same target. Finally relation among type of train, numbers of movement, surroundings, length will be considered in combination with the pollution. With this result pollute map for KORAIL could be accomplished and inspect period will be optimized case by case.

  • PDF

Design of umbrella arch method based on adaptive SVM and reliability concept (Adaptive SVM 기법 및 신뢰성 개념을 적용한 강관다단공법의 설계기법 연구)

  • Lee, Jun S.;Sagong, Myung;Park, Jeongjun;Choi, Il Yoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.4
    • /
    • pp.701-715
    • /
    • 2018
  • A reliability based design approach of the tunnel reinforcement with umbrella arch method was considered to better represent the uncertainties of the weak rock properties around the tunnel. For this, a machine learning approach called an Adaptive Support Vector Machine (ASVM) together with the limit equilibrium method were introduced to minimize the iteration numbers during the classification training of the tunnel stability. The proposed method was compared with the results of typical Monte Carlo simulations. It was concluded that the ASVM was very efficient and accurate to calculate the probability of failure having auxiliary umbrella arches and uncertain material properties of the tunnel. Future work will be concentrated on the refinement of the fast adaptation of the SVM classification so that the minimum number of numerical analyses can be used where the limit solution is not available.

Application of Seismic Reflection Method in the tunnel of Youngdong Railroad(Mt. Dongbaek~Dokye) (영동선 동백산-도계간 터널내 반사법 탄성파탐사 적용사례)

  • 김용일;윤영훈;조상국;양종화;김장수;이내용
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.696-708
    • /
    • 2002
  • Seismic Reflection Methods(TSP, HSP) have been applied in the junction between 2nd Adit and Main Tunnel (Solan Tunnel) of Youngdiong Railroad(Mt. Dongbaek∼Dokye). In this paper, methods and case study will be introduced to predict discontinuties in the tunnel before excavation by the Seismic Reflection Methods(TSP, HSP)and secure construction stability of the tunnel in blasting and excavation.

  • PDF

Variable Suspension Design for Active Pantograph

  • Shin, Seungkwon;Kim, Hyungchul;Jung, Hosung;Park, Jongyoung;Kim, Sangahm
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.7 no.2
    • /
    • pp.105-108
    • /
    • 2015
  • There are a lot of traffic jams in the metropolitan area and the commuting time has been longer nowadays. So the urban people has been interested in the GTX(Great Train Express) project in Korea. The GTX is the train which runs at 200km/h speed in underground tunnels. If the train also operates at high speed in tunnel section, the pressure wave will happen and the uplift force of pantograph may vary abruptly. If the rigid trolley bar system is used in tunnel section, it is difficult to improve the commercial speed of train. In order to improve the train speed in tunnel section, this paper presents the new pantograph concepts which can change the suspension stiffness and deals with the dynamic behavior characteristics of pantograph according to the parameter variation.