• Title/Summary/Keyword: Railroad network

Search Result 305, Processing Time 0.027 seconds

A Study on the Accident Case and Analysis on the Actual Condition of Construction Machinery in Railroad Construction Sites (철도건설현장 건설기계 재해사례 및 실태분석에 관한 연구)

  • Son, Du-Hyun;Song, Do-Heom;Go, Seong-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.5
    • /
    • pp.20-28
    • /
    • 2015
  • Recently, railroad's preference greatly increased as the environment-friendly means of transportation as the importance in the aspects of environment and energy efficiency. So the government established the Korea Rail Network Authority which takes full charge of railroad construction in 20047 for regular railroad construction to combine major key points in the whole country with each other to be one city region by connecting them to each other to be within the commute time range of a hour and thirty minutes. And it has arranged large-scale railroad construction by establishing plans to build the 1st and 2nd national railroad networks as the national project and investing about 100 trillion won in it from 2006 to 2020. As large-scale railroad construction is promoted as the national project like this, there has been a string of safety accidents in it due to the large and complex construction project. As the government strengthened the safety accident prevention plans, safety accidents have tended to decrease in 2011. However, accidents of construction machinery have found to increase. Therefore, this study tried to investigate accident cases of the Korea Rail Network Authority for the recent 5 years and analyze accidents of construction machinery to prevent them in railroad construction sites and suggest accident prevention plans due to it by conducting, investigating, and analyzing the survey of its operators and superintendents of the construction sites and drawing the problems.

Reconnecting the Trans-Korean Railway and future aspirations of Northeast Asia Railway Network (최근 남북.대륙철도 협력현황과 동북아철도협력 구상)

  • Na, Hee-Seung
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1029-1036
    • /
    • 2006
  • South and North Koreas are putting forth efforts to overcome the distrust and animosity of the past 50 years to open an era of harmony and cooperation where the two halves can work together for mutual benefits. As part of those efforts, both parties are working now to reconnect the railways between the North and the South that remained broken for the past 60 years. In addition, the restoration of Trans-Korean railway paves the way for the "Silk Road Railway" which links European continent to Asian regions and Pacific Rim. The restoration project acts as a conduit for cooperation within in the Northeast Asian continent, hence, an important tool for facilitating peace and prosperity within the Northeast Asian region. Notably, the Railway project is regarded as the cardinal future-oriented peace building project for cultivating constructive, cooperative relations (Trans-Korean Railway and Trans-Asian Railway works) by stimulating human resources and commodity flows through railroad transportations. Northeast Asian region takes on a similar instance to the unification of European continent through its astounding development in railroad transportation, i.e., the international re-construction of Railroad lines will act as a catalyst to link Eurasian areas into one regional community for cooperation and peace. At present, the government is creating a momentum to bind trans-Eurasian railroad works and an initiative for "Northeast Asia Railroad networks and consultative organization". The South Korean administration paves the way to develop railroad network within South-North Korean, Russia and Eurasian region. It also fosters railroad cooperation with China for people and goods transports. To achieve such objectives, the project requires wide publicity and cross-border cooperation from concerned countries. The blueprint would have to be drafted up for Northeast Asian railroad train demonstration runs, Northeast Asian transportation agreements, with a bid to promote constitute Northeast Asian Railroad Consultation body. Moreover, the government would also have to prepare both, a draft of the linkage and the mandated standardized proposal.

  • PDF

A Study on Durability Standard Specification of the Dropper Clamp of Catenary for High Speed Railway (고속철도 전차선로 드로퍼 클램프 내구성 기준 정립에 관한 연구)

  • Oh, Wan-Shik;Yang, In-Dong;Park, Byung-Gon;Hong, Seok-Jin;Kim, Seong-Cheol
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.9
    • /
    • pp.1431-1436
    • /
    • 2017
  • The high-speed railway of catenary system, supplies a stable electric power supply to the train by satisfying the special conditions between pantograph and trolley wire, which operates more than 250km/h mutually sliding and feeding electric lines. According to Korean Railway Standard KRS PW 0026-13 (R), the standard for the grip strength of the dropper clamp in conventional line is established, but the high-speed railway line is not yet. When the grip strength of the dropper clamp is detached from the catenary line of the high-speed railway line, various problems may occur, such as damage to the pantograph due to the collision and arcing. In this paper, it is expected to be used as a basic data for establishing the durability criteria of the high-speed railway dropper clamp by verifying the dropper clamp on the Gyeong-bu and Honam high-speed line.

A Study of Wireless Communication Network Constructing Policy Plan for an Efficient Railroad System Infrastructure (효율적인 철도시스템을 위한 무선통신망 구축정책 방안연구)

  • Lee, Seungho;Kim, Sigion
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.4
    • /
    • pp.262-271
    • /
    • 2013
  • Wireless communication networks are recently taking an important role in railroad systems as railways now require high speed and high density operation with the aid of advanced information technology to improve maintenance efficiency and to handle passenger service growth. Train control systems are consequently changing from track circuitbased systems to communication-based systems. This paper analyses the role of wireless communication networks in recent railroad systems, reviews foreign cases, and then suggests a communication network constructing policy for increased transport capacity increase, securement of safety, and efficient train control.

Development and Performance Test of DC Smart Metering System for the DC Power Measurement of Urban Railway (도시철도 직류 전력량 계측을 위한 직류용 스마트미터링 시스템 개발 및 성능시험)

  • Jung, Hosung;Shin, Seongkuen;Kim, Hyungchul;Park, Jongyoung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.5
    • /
    • pp.713-718
    • /
    • 2014
  • DC urban railway power system consists of DC power network and AC power network. The DC power network supplies electric power to railway vehicles and the AC power network supplies electric power to station electric equipment. Recently, because of power consumption reduction and peak load shaving, intelligent measurement of regenerative energy and renewable energy adapted on DC urban railway is required. For this reason, DC smart metering system for DC power network shall be developed. Therefore, in this paper, DC voltage sensor, current sensor, and DC smart meter were developed and evaluated by performance test. DC voltage sensor was developed for measuring standard voltage range of DC urban railway, and DC current sensor was developed as hall effect split core type in order to install in existing system. DC smart meter possesses function of general intelligent electric power meter, such as measuring electricity and wireless communication etc. And, DC voltage sensor showed average 0.17% of measuring error for 2,000V/50mA, and current sensor showed average 0.21% of measuring error for ${\pm}2,000V/{\pm}4V$ in performance test. Also DC smart meter showed maximum 0.92% of measuring error for output of voltage sensor and current sensor. In similar environment for real DC power network, measuring error rate was under 0.5%. In conclusion, accuracy of DC smart metering system was confirmed by performance test, and more detailed performance will be verified by further real operation DC urban railway line test.

The Investigation of the Configuration of Wireless Communication Network for Railway Application of Multimedia Information Service (열차에의 멀티미디어 정보서비스 제공을 위한 무선통신네트워크 구성에 대한 검토)

  • Choi, Kyu-Hyoung;Cho, Bong-Kwan
    • Proceedings of the KIEE Conference
    • /
    • 2004.10a
    • /
    • pp.233-234
    • /
    • 2004
  • The study for ubiquitous computing infra is proceeding actively, it make possible to use service and access network anywhere, anytime because of wire/wireless communication technology and progress of hardware. Domestically, study for the network mobility support technology which is the key technology for future ubiquitous computing realization have progressed, but that is Insufficient. Especially, there is no study for independent mobility support study about railway wireless network. So, this study propose network mobility management technology for mobile network infra in railway and proper network model in train.

  • PDF

Regeneration of a defective Railroad Surface for defect detection with Deep Convolution Neural Networks (Deep Convolution Neural Networks 이용하여 결함 검출을 위한 결함이 있는 철도선로표면 디지털영상 재 생성)

  • Kim, Hyeonho;Han, Seokmin
    • Journal of Internet Computing and Services
    • /
    • v.21 no.6
    • /
    • pp.23-31
    • /
    • 2020
  • This study was carried out to generate various images of railroad surfaces with random defects as training data to be better at the detection of defects. Defects on the surface of railroads are caused by various factors such as friction between track binding devices and adjacent tracks and can cause accidents such as broken rails, so railroad maintenance for defects is necessary. Therefore, various researches on defect detection and inspection using image processing or machine learning on railway surface images have been conducted to automate railroad inspection and to reduce railroad maintenance costs. In general, the performance of the image processing analysis method and machine learning technology is affected by the quantity and quality of data. For this reason, some researches require specific devices or vehicles to acquire images of the track surface at regular intervals to obtain a database of various railway surface images. On the contrary, in this study, in order to reduce and improve the operating cost of image acquisition, we constructed the 'Defective Railroad Surface Regeneration Model' by applying the methods presented in the related studies of the Generative Adversarial Network (GAN). Thus, we aimed to detect defects on railroad surface even without a dedicated database. This constructed model is designed to learn to generate the railroad surface combining the different railroad surface textures and the original surface, considering the ground truth of the railroad defects. The generated images of the railroad surface were used as training data in defect detection network, which is based on Fully Convolutional Network (FCN). To validate its performance, we clustered and divided the railroad data into three subsets, one subset as original railroad texture images and the remaining two subsets as another railroad surface texture images. In the first experiment, we used only original texture images for training sets in the defect detection model. And in the second experiment, we trained the generated images that were generated by combining the original images with a few railroad textures of the other images. Each defect detection model was evaluated in terms of 'intersection of union(IoU)' and F1-score measures with ground truths. As a result, the scores increased by about 10~15% when the generated images were used, compared to the case that only the original images were used. This proves that it is possible to detect defects by using the existing data and a few different texture images, even for the railroad surface images in which dedicated training database is not constructed.

A Study on the Method Improvement of the Integrated Railway Safety Audit System through the Analysis of Results (철도종합안전심사 결과 분석을 통한 효율적 심사방안 연구)

  • Song, Bo-Young;Song, Byeong-Ho;Oh, In-Tack
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2503-2516
    • /
    • 2011
  • According to Railway Safety Act, Korea Transportation Safety Authority (KOTSA) has been entrusted with 'Integrated Railroad Safety Audit (IRSA) and has implemented the safety audit to the railroad operation agencies such as Korea Railroad (KORAIL) and the railroad facility management organization such as the Korea Rail Network Authority (KR Network). The target of IRSA is to establish the effective rail safety management system and to raise the safety level of the railroad operation and facility agencies by checking synthetically their performance of safety duties with sincerity according to the Railway Safety Act. Even though newly introduced IRSA is conducted smoothly, it is necessary to study the methodology and criteria of the state's safety audit system. The purpose of this paper is to improve the efficiency of IRSA by the comparative research between IRSA and other similar safety audit system and to establish the consecutive improvement concept of IRSA. Second purpose is to confirm the effectiveness of IRSA by the analysis of the relationship between audit results and the safety level of the rail operation agencies.

  • PDF

Analysis of Network Topology for Distributed Control System in Railroad Trains (철도차량용 분산형 제어시스템을 위한 네트워크 토폴로지 분석)

  • Hwang, Hwanwoong;Kim, Jungtai;Lee, Kang-Won;Yun, Ji-Hoon
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.52 no.10
    • /
    • pp.21-29
    • /
    • 2015
  • For higher reliability against component failures in railroad trains with many electronic sensors and actuators, a distributed control system with which all electronic components are connected via a network is being considered. This paper compares and analyzes various topologies of Ethernet network for a railroad train in the aspects of (1) failure recovery, (2) the number of ports per device, (3) the number of cable connections between vehicles, and (4) performance. Especially, the unique characteristic of a train system that the number of vehicles changes is considered through analysis. Various combinations of in- and inter-vehicle topologies are considered. In addition, we introduce a hybrid of star and daisy-chain topology for inter-vehicle connection when the maximum number of inter-vehicle connections is limited to reduce possible failures of inter-vehicle connections. Simulation results show performance comparison between different topology combinations; the hybrid topology is shown to enhance delay performance even with a highly limited number of inter-vehicle connections.

Harmonic Analysis for Traction Power Supply System Using Four-Port Network Model (6단자망 회로모델을 이용한 전기철도 급전시스템의 고조파 해석)

  • Chang, Sang-Hun;O, Gwang-Hye;Kim, Ju-Rak;Kim, Jeong-Hun
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.6
    • /
    • pp.255-261
    • /
    • 2002
  • Recently, traction motors in trains are supplied with single phase a.c. power. After this power is converted to d.c. power, it is inverted to three phase power to operate traction motors. As going through the process of the conversion, harmonic current is generated in train. The method of conventional analysis on harmonics, studied by RTRI, is modeled with equivalent circuit of ac AT-fed electric railroad system using by the distributed constant circuit. However, this circuit as two-port network model has some difference in comparison with real system. The reason why the conventional method is different from the real system is that the conventional method dose not include three conductor groups, that is catenary, rail, and feeder, and admittance between the conductors for line capacitance. Therefore, this method has a little error. This paper proposes new method to more effectively estimate Harmonic current. In this method, numerous components in electric railway are categorized and each component is defined as a four- port network model. The equivalent circuit for the entire power supply system is also described into a four-port network model with connections of these components. In order to evaluate the efficiency and the accuracy of a proposed method, it is compared with values measured in Kyung-Bu high speed line and ones calculated by the conventional method.