• 제목/요약/키워드: Rail Terminal

검색결과 73건 처리시간 0.025초

철송 크레인 일정계획문제에 관한 연구 (A Study on Rail Crane Scheduling Problem at Rail Terminal)

  • 김광태;김경민;김동희
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.269-276
    • /
    • 2011
  • This paper considers the rail crane scheduling problem with minimizing the sum of the range of order completion time and make-span of rail crane simultaneously. The range of order completion time implies the difference between the maximum of completion time and minimum of start time. Make-span refers to the time when all the tasks are completed. At a rail terminal, logistics companies wish to concentrate on their task of loading and unloading container on/from rail freight train at a time in order to increase the efficiency of their equipment such as reach stacker. In other words, they want to reduce the range of their order completion time. As a part of efforts to meet the needs, the crane schedule is rearranged based on worker's experience. We formulate the problem as a mixed integer program. To validate the effectiveness of the model, computational experiments were conducted using a set of data randomly generated.

  • PDF

A Study on the Wedge Angle of the Rail Clamp according to the Design Wind Speed Criteria Change

  • Lee Jung-Myung;Han Dong-Seop;Han Geun-Jo;Jeon Young-Hwan
    • 한국항해항만학회지
    • /
    • 제29권7호
    • /
    • pp.641-646
    • /
    • 2005
  • In cargo-working, it unavoidably happens that the quay crane slip along the rail and the container move from side to side. Especially, they involve a lot of risk in bad weather. The rail clamp is a mooring device to prevent that the quay crane slips along the rail due to bad weather or the wind blast while the quay crane do the cargo-working And it will play a greater role in port container terminal integration and automation To design the wedge type rail clamp, it is very important to determine the wedge angle. In this study, we expect that the design wind speed of the quay crane will change over 16m/s. Assuming that the design wind speed is 40m/s, we determined the proper wedge angle of the wedge type rail clamp for the 50ton class quay crane.

컨테이너 항만의 철도 운송 터미널 설계변수 결정 (Determining Values of Design Parameters for a Rail Transportation Terminal in a Container Port)

  • 정봉주;이병권;김갑환;서정훈;박순오
    • 산업공학
    • /
    • 제20권4호
    • /
    • pp.469-478
    • /
    • 2007
  • Rail transportation terminals play an important role in inland transportation systems, because the operation productivity in the terminals significantly influences the efficiency of the whole transportation systems. This paper addresses a design method of a real rail terminal that satisfies a pre-specified throughput capacity. In order to construct high performance rail terminal, it is shown how design parameters can be estimated systematically. Examples of the design parameters are the number of transshipment tracks, the number of rail cranes, and the number of internal trucks. These design parameters are estimated by using simple equations and the validity of the values of these parameters are tested by using simulation. Furthermore, some iterative correction procedure, which uses the simulation technique and the equations alternately, are proposed.

중단거리 화물운송시장에서의 철도물류 경쟁력 강화방안 (A Study on the increasing competitiveness of railway freight transportation in mid- or short- distance market)

  • 방연근;유재균;이순철
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(II)
    • /
    • pp.319-325
    • /
    • 2003
  • This study focuses on the efforts of rail freight industry in Europe to adapt to the change of freight market. Nearly $80\%$ of freight is transported in short and medium distance market and due to e-commerce the freight becomes small and requires more frequencies than before. Rail freight industry tries to change their operation practices and to create measures to catch the market share. Trials in the two market segments, sea port to/from inland rail terminal and airport to/from inland rail terminal, are reviewed in this study.

  • PDF

철송 크레인 일정계획 문제에 대한 메타 휴리스틱 (Metaheuristics of the Rail Crane Scheduling Problem)

  • 김광태;김경민
    • 산업공학
    • /
    • 제24권4호
    • /
    • pp.281-294
    • /
    • 2011
  • This paper considers the rail crane scheduling problem which is defined as determining the sequence of loading/unloading container on/from a freight train. The objective is to minimize the weighted sum of the range of order completion time and makespan. The range of order completion time implies the difference between the maximum of completion time and minimum of start time of each customer order consisting of jobs. Makespan refers to the time when all the jobs are completed. In a rail freight terminal, logistics firms as a customer wish to reduce the range of their order completion time. To develop a methodology for the crane scheduling, we formulate the problem as a mixed integer program and develop three metaheuristics, namely, genetic algorithm, simulated annealing, and tabu search. To validate the effectiveness of heuristic algorithms, computational experiments are done based on a set of real life data. Results of the experiments show that heuristic algorithms give good solutions for small-size and large-size problems in terms of solution quality and computation time.

철도-육상트럭 환적지에서의 입주사 작업시간을 고려한 크레인 적하작업 스케줄링 : 의왕ICD 사례 (Crane Scheduling Considering Tenant Service Time in a Rail-Road Transshipment Yard : Case of the Uiwang ICD)

  • 김광태;김효정;손동훈;장진명;김화중
    • 산업경영시스템학회지
    • /
    • 제41권4호
    • /
    • pp.238-247
    • /
    • 2018
  • This paper considers the problem of scheduling loading and unloading operations of a crane in a railway terminal motivated from rail-road container transshipment operations at Uiwang Inland Container Depot (ICD). Unlike previous studies only considering the total handling time of containers, this paper considers a bi-criteria objective of minimizing the weighted sum of the total handling time and tenant service time. The tenant service time is an important criterion in terms of terminal tenants who are private logistics companies in charge of moving containers from/to the terminal using their trucks. In the rail-road container shipment yard, the tenant service time of a tenant can be defined by a time difference between beginning and finishing loading and unloading operations of a crane. Thus, finding a set of sequences and time of the crane operations becomes a crucial decision issue in the problem. The problem is formulated as a nonlinear program which is improved by linearizing a nonlinear constraint in the model. This paper develops a genetic algorithm to solve the problem and performs a case study on the Uiwang ICD terminal. Computational experiment results show that the genetic algorithm shows better performance than commercial optimization solvers. Operational implications in terms of tenants are drawn through sensitivity analyses.

철도 터미널 화물열차 작업선배정에 관한 연구 (A Study on the Assigning Track of Freight Trains in a Rail Container Terminal)

  • 김경민;박범환;김동희;홍순흠
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1209-1214
    • /
    • 2010
  • In these days, rail container service is being more important because it has relatively simple network. In addition, small lot sizes of shipment, frequent shipment, and demand for flexible service are important characteristics in rail container transportation. Efficient container operation at terminals is important in reducing transportation costs and load/unload time. This paper describes the assigning track of freight trains in the railway freight terminal. The paper addresses the operational requirements and facility restrictions to construct a mathematical model for track assignment. In addition, it suggests several types of objectives for the model.

  • PDF

러시아 모스크바 공항철도의 도입과 시사점 (Introduction & Suggestion about Airport Rail System of Moscow, Russia)

  • 이진호;조지현
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.1318-1326
    • /
    • 2009
  • Moscow is one of well-developed city about intermodal transport system by subway line. But some airports which located in suburb area have really bad transport system connecting downtown Moscow, and many people have experienced a lot of inconveniences. Russian Railways (RZD) established airport rail company in year 2005 and they have operated Aero-Express train from downtown of Moscow to major airports. Intermodal transport system was considered to the construction of Russian airport rail system, and various types of tickets and airport rail terminals are operated by RZD, and subsidiary businesses with airline companies are promoted. This study will analyze the success factors of Moscow airport rail system and introduce the success effects, and considering points for the operation of Incheon airport rail terminal in the future.

  • PDF

트랜스퍼 크레인의 고정도 주행제어에 관한 연구 : 2자유도 서보계 설계법을 이용한 제어계 설계 및 실험적 연구 (An Experimental Study on the Accurate Tracking Control of a Transfer Crane Based on the 2DOF Servosystem Design Approach)

  • 김영복;이권순;한승훈
    • 한국해양공학회지
    • /
    • 제20권5호
    • /
    • pp.57-62
    • /
    • 2006
  • The most important thing in acontainer terminal is to handle the cargo effectively in the limited time available. To achieve this objective, many strategies have been introduced and applied. To create an automated container terminal, it is necessary for the cargo handling equipment to be equipped with more intelligent control systems. From the middle of the 1990's, automated rail-mounted gantry cranes (RMGC) and rubber-tired gantry cranes (RTG) have been widely used to handle containers in yards. Recently, many pieces of equipment, like CCD cameras and sensors, have beenmounted in these cranes to cope with the automated terminal environment. In this paper, we try to support the development of more intelligent automated cranes, which allow for more effective cargo handling in yards. For this purpose, the modeling, tracking control, anti-sway system design, skew motion suppressing, and complicated motion control and suppressing problems must be considered. Especially, in this paper, the system modeling and a new tracking control approach are discussed, and an experimental study is performed based on a two-degree-of-freedom (2DOF) servosystem design.

슬립을 고려한 트랜스퍼 크레인의 주행제어에 관한 연구 (A Study on the Tracking Control of a Transfer Crane with Tire Slip)

  • 정지현;이동석;김영복
    • 제어로봇시스템학회논문지
    • /
    • 제16권12호
    • /
    • pp.1212-1219
    • /
    • 2010
  • The most important thing in the container terminal is to handle the cargo effectively in the limited time. To achieve this object, many strategies have been introduced and applied to. If we consider the technical trends and environment of the automated container terminal, it is necessary that the systems for cargo handling are equipped with more intelligent control technologies. To cope with this tendency, from the middle of the 1990's, the automated RMGC (Rail-Mounted Gantry Crane) and RTGC (Rubber-Tired Gantry Crane) have been developed and widely used to handle containers in the yards. Recently, in these cranes, the many equipments like CCD cameras and sensors are mounted to cope with the automated terminal environment. If we want to obtain more efficient handling performance, the modelling, tracking control, anti-sway system design, skew motion suppressing and complicated motion control problems must be considered in the control system design and application process. Considering these problems, in this paper, the system modelling with the tire slip and a tracking control approach are proposed. Especially, we design the tracking control system based on the 2DOF servosystem design approach to cope with undesirable disturbance input. The experiment results show the desirable performance and usefulness of the designed control system.