This paper proposes an analytical methodology of station capacity calculation on high - speed railway. Our method explicitly takes into account the effect of the number of sidings and the combination of train halting patterns (stop - stop, pass - stop, stop - pass, pass - pass) on the capacity of a station. To verify the reliability of our model, we conducted capacity analysis of selected stations using the Railsys simulator. We found that the difference in calculated capacity between our model and Railsys was less than 10%. After Monte Carlo simulation, our model was determined to be a good one. In addition, the consistency in capacity between our model and the train-path allocation program (Korea Rail Network Authority) was statistically significant.
Recently, railroad's preference greatly increased as the environment-friendly means of transportation as the importance in the aspects of environment and energy efficiency. So the government established the Korea Rail Network Authority which takes full charge of railroad construction in 20047 for regular railroad construction to combine major key points in the whole country with each other to be one city region by connecting them to each other to be within the commute time range of a hour and thirty minutes. And it has arranged large-scale railroad construction by establishing plans to build the 1st and 2nd national railroad networks as the national project and investing about 100 trillion won in it from 2006 to 2020. As large-scale railroad construction is promoted as the national project like this, there has been a string of safety accidents in it due to the large and complex construction project. As the government strengthened the safety accident prevention plans, safety accidents have tended to decrease in 2011. However, accidents of construction machinery have found to increase. Therefore, this study tried to investigate accident cases of the Korea Rail Network Authority for the recent 5 years and analyze accidents of construction machinery to prevent them in railroad construction sites and suggest accident prevention plans due to it by conducting, investigating, and analyzing the survey of its operators and superintendents of the construction sites and drawing the problems.
Groundwater drawdown was pointed out as one of the causes of induced settlement on high speed railways, especially concrete track. In this study, the effect of groundwater variation on settlement was evaluated through a comparison of field measurements with numerical analysis results. A trial and error method, i.e., repeated numerical analyses by changing material properties, was used to calibrate the model. The model was applied to investigate the effect of groundwater drawdown, thickness of soft layer, and embankment height on residual settlement after concrete track completion. A soft layer thicker than 4m would result in more than 30mm of settlement; a detailed analysis of groundwater behavior thus should be conducted from the design stage to construction.
Journal of Korean Society of Archives and Records Management
/
v.7
no.2
/
pp.113-138
/
2007
This study was started from a critical mind for the construction records management in South Korea and examined the state of the construction records management system of the Korea Rail Network Authority which is constructing the biggest Express Railway Construction of National Project in Korea. The Methodology of this study is based on the functional requirement of the Records Management International Standard, ISO 15489, which standardized the record management process in the cases of Record Capture, Declaration, Classification, Storage, Access, Tracking and Disposition. In regard to the functional requirements from Capture to Disposition, each level(title) consists of 3 to 4 items, for a total of 22 principles in all. The estimation was created for each of the 22 categories using 4 levels: observance, partial observance, insufficiency and non observance. And pointing out the problem, suggesting the improvements for the Korea Rail Network Authority and structural improvements according to the KS X ISO 15489 principles.
Yoon, Byungsik;Lee, Sook-Jin;Kim, Dong Joon;Sung, Dong Il
Journal of the Korea Academia-Industrial cooperation Society
/
v.21
no.9
/
pp.1-8
/
2020
The Ministry of Land, Infrastructure and Transport of Korea has been trying to spread integrated railway communication network technologies based on a major railway policy since 2012. As a result, the world's first commercial Long-Term Evolution - Railway (LTE-R) network was established on the Gangneung line (Manjong station - Gangneung station) and has been commercially operating as a railway communication system since 2017. Special function and performance requirements are needed for safe and efficient railway operations, such as group calls, emergency calls, functional addressing, and train control based on wireless communications. In this paper, we present functional and performance railway communications requirements that are based on European wireless railway communications systems. In addition, we measured communications characteristics and performance using a KTX field test on the Gangneung line to analyze the validity and reliability of the LTE-R network. Although the average Radio Frequency (RF) conditions were satisfied in the requirements, we found sudden communications quality degradation, such as Radio Link Failure (RLF) in some railway sections. We propose a way to improve performance and network installations based on in-depth analysis of LTE-R communications field-test results.
In 2004, KTX operated in Korea on the 5th in the world. But there are various factor on planed schedule delay of Big National Construction Project like Seoul-Busan High Speed Rail Project(Seoul-Busan HSR). For example, Often change of government policy, project management control problem of design and construction, conflict of interested party like environmental organization/resident are the main delay factors. The suggestions for improvement of the construction schedule through the Seoul-Busan HSR will help to make a new leap forward in rail construction.
After the railway reform in 2004, Korea National Railroad was divided into two separate organizations. The Korea Railway Network Authority is responsible for the construction of new line. Korea Railroad corporation is a public-owned railway operator. The compensation for the loss of rail operator from the Public Service Obligation(PSO) observance is specified in the Law of Rail Industry Development No.32, No.33. However, it is necessary to revise the compensation criteria of PSO after the actual enforcement of the law for more efficient rail operation. This study aims for revising compensation criteria of PSO. In this study, we suggested a revised compensation criteria. The scope of compensation for the loss of regional line operation was adjusted by new criteria considering the characteristics and the business results of the line. The compensation rate is linked with the actual business results of the line for giving motivation to the rail operator.
The China entered World Trade Oganization(WTO) last year, thus opening its border to more - and freer - trade. With its foreign trade rapidly expanding and with economic growth continuing at a substantial -rate, China will be the largest container traffic generating country in the world. In the light of this potential trade bonanza, regional ports in North-East Asia strive to gain a competitive-edge. The Port of Busan, the world's third largest container port, wants to capture a significant share of the china's container cargoes. In this circumstance, development strategies of the Port of Busan are suggested as follows. First, to cope with increasing volumes, the New Busan Port on Gaduk island should be constructed without failure. Second, it is necessary to add modernized high-performance gantry cranes and to train crane operators' skill. Third, it needs to apply Dwell Time- Sliding Scale System for transshipment cargoes. Fourth, it needs to develop the EDI network in terminal areas or adjacent hub ports to exchange trustworthy and satisfactory informations Fifth, port authority -needs to enlarge designated Free Trade Zone to facilitate the free flow of cargoes. Sixth, the restoration of rail links between North and South Korea is abundantly clear. Thus it needs to enlarge railroad facilities in advance. Seventh, it needs to establish the Port Authority of Busan immediately. Finally, it needs to strengthen port sales and to open events like 'Marine Week 2001' regularly to attract potential canters or big shippers.
This paper gives an overview and developing status of the on-board Automatic Train Control (ATC) System employed to control the Urban Maglev vehicle in Korea. In the construction of demonstration line for Urban Maglev Program, the Daewoo Engineering Company (DEC) has participated as a supplier of the whole ATC System since 2009. According to the contract with Korea Rail Network Authority, DEC is under progress for the development of the whole ATC system including Safety Integration Level (SIL) assessment from the ISA, which is followed by the international standards IEC62278, IEC62279, and EN50129. Once the Urban Maglev Program is completed successfully in 2013, the developed system will be the first localized whole ATC system which has SIL assessment and commercial operation experience in Korea.
Proceedings of the Safety Management and Science Conference
/
2010.11a
/
pp.581-591
/
2010
Korea Rail Network Authority ordered Urban Transit Magrev System on the alternative tender lines. The project was contained order with GS Construction and Yooshin Corporation as a result of competition as 5 consortium. Urban Transit Magrev System route was constructed in the whole Yeongjong-dong and Yongyu-dong, Jung-gu, Inchen. The main project is via transportation center in Inchen Int'l airport ~ Work complex ~ Water park ~ Yongyu-station and has Total continuation of 6.1kilometers, Station of 6 spot, Car base of a spot, go out line(a single line) of 380meters. Scale of construction is Major of Roadbed, Railroad, Building, Inspection and Repair facilities. The first Urban Transit Magrev System in Korea is a new symbol of Korea and has polished beauty and creative artistry based on functional perfection. It was designed in harmony with Inchen Int'l Airport improving the dignity of SOC design.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.