• 제목/요약/키워드: RESERVOIR

검색결과 3,706건 처리시간 0.031초

DETERMINATION OF TROPHIC STATE AND TESTING OF PHOSPHORUS MODEL IN THE KI HEUNG RESERVOIR

  • Lee, Do-Hun;Oh, Jong-Min
    • Water Engineering Research
    • /
    • 제1권3호
    • /
    • pp.199-208
    • /
    • 2000
  • The relationship between areal total phosphorus(TP) and areal hydraulic loading was identified and used as defining the trophic state of the reservoir. And three simple, conceptual TP models were tested against the measured in-reservoir TP concentration. The analyses were based on water quality data measured in the Ki Heung reservoir for two years. The results showed that Ki Heung reservoir has undergone eutrophic state, and Dillon's and Vollenweider's TP models were in close agreement with the measured annual mean TP concentration. However, the OECD's model understimated the measured annual mean TP concentration in the Ki Heung reservor. A discussion is given for the hypothetical application of TP loading plot which might be useful for establishing the TP control program in the resavoirs/lakes.

  • PDF

수혜 인원을 고려한 농업용 저수지의 최적 정비 모델 개발 (Developing an Optimum Equipment Model for Agricultural Reservoir Considering Beneficiary)

  • 김시운;김종옥;박승기;정남수;장우석;이세희;최원
    • 한국농공학회논문집
    • /
    • 제50권6호
    • /
    • pp.75-81
    • /
    • 2008
  • The purpose of this study was to develop an optimum equipment model considering various objective functions and variables of agricultural reservoir. Traditional optimum function for feasibility assessment is based on economic benefit, but we tried new approach of feasibility assessment based on the number of beneficiary. The data of Yuraimi reservoir and Yongbong reservoir in Yesan-gun such as numbers of related people, construction costs, safe diagnosis have been gathered for applying developed model. Data are used for determining optimum strategy with restricted cost. For verifying results of optimum maintenance, real maintenance data of Yuraimi reservoir were compared with simulated strategy. Results show that simulated maintenance strategies are 3 times more effective than real maintenance data.

금강호물의 새만금호 도입에 따른 금강호 수질변화 분석 (Estimation of water quality for Geumgang Reservoir by diversion of the Geumgang river flow to the Saemangeum reservoir)

  • 엄명철;조국현;임종완;김태철
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 2005년도 학술발표논문집
    • /
    • pp.509-514
    • /
    • 2005
  • Geumgang canal is planned to connect Geumgang lake with Saemangeum reservoir to accelerate desalinization and dillute polluted water in Saemangeum reservoir. The purpose of this study is to evaluate the variations of water quality by divesion of Geumgang lake flow to the Saemangeum reservoir. WASP5 model was used to estimate water quality concentration of Geumgang lake. Model calibration and verification was done for water quality data for 2001 and 2002. As a result of simulating water quality concentration for 4 scenarios, which was considered whether Geumgang canal will be built, there was little influence on water quality in Geumgang lake though Geumgang lake flow diverted to Saemangeum reservoir.

  • PDF

칠리제의 수치지도 자료와 지적현황측량 결과 비교 (Comparision of Digital Map vs Cadastral State Surveying of Chilli Reservoir)

  • 김욱남;박희주
    • 한국측량학회:학술대회논문집
    • /
    • 한국측량학회 2004년도 추계학술발표회 논문집
    • /
    • pp.545-550
    • /
    • 2004
  • Chilli reservoir is agricultural purpose reservoir made in 1945. But its bottom is covered with thick accumulated sewage layer, so its original function has failed. This study conducted cadastral state surveying to survey the state of this area prior to dredging the accumulated bottom sewage layer of Chill reservoir. Prior to cadastral state surveying we analyzed the digital map and aerial photographs of study area. In cadastral state surveying, traversed network was constructed on the road and banks near the reservoir, a surveyed map was made by surveying with Auto-reduction EDM Alidade. From the comparison results of the cadastral map and digital map, we found small chilli reservoir is expressed as rice field on the digital map, and it should be corrected. And when we make digital map and topographic map, the errors will be diminished if we use the cadastral map at the same time.

  • PDF

저수량 오차를 목적함수로 한 저수지 일 유입량 모의 (Simulation of Daily Reservoir Inflow using Objective Function Based on Storage Error)

  • 노재경
    • 한국농공학회지
    • /
    • 제42권4호
    • /
    • pp.76-86
    • /
    • 2000
  • The objective function of reservoir storage error was suggested to simulate daily reservoir inflow. DAWAST model, UMAX, LMAX, FC,CP, CE were calibrated. Daily reservoir inflow was imulated with calibrated parameters and reservoir storage was simulated on a daily basis. The simulated results were compared with the monthly results by Gajiyama equation and ten-day results by Tank rainfall-runoff model through equal value lines and hydrographs . DAWAST model showed the best results compared with Gajiymama equation and Tank model. Especially, DAWAST model showed a good agreement in dry periods. NEW concept using objective function of storage error was believed to be satisfactory and to be applied in estimating reservoir inflow.

  • PDF

Development of a Decision Support System for Reservoir Sizing

  • Kim, Seong-Joon;Noh, Jae-Kyoung
    • 한국농공학회지
    • /
    • 제42권
    • /
    • pp.17-23
    • /
    • 2000
  • A decision support system for determining reservoir capacity, named as KORESIDSS (KOwaco's REservoir SIzing Decision Support System), was developed. The system is composed of three subsystems; a database/information subsystem, a model subsystem, and an output subsystem. This system is operated using MS-Windows with a GUI (Graphic User Interface) system developed using Visual Basic 5.0. As a continuous runoff model, the DAWAST model (DAily WAtershed STreamflow model) developed by Noh(1991) was and its analysis module was developed. This system was applied to a newly-planned dam, the Cheongyan Dam, Which will be located in Cheongyang-Gun, Chungcheongnam-Do and it was proved to be applicable in determining reservoir storage.

  • PDF

파키스탄 파트린드댐의 저수지 퇴사관리를 위한 배사효과 분석 (Analysis of Sediment Flushing Effect for Reservoir Sedimentation Management of the Patrind Dam in Pakistan)

  • 노준우;박진혁;허영택;김상호
    • 한국물환경학회지
    • /
    • 제29권6호
    • /
    • pp.799-807
    • /
    • 2013
  • Reservoir sedimentation is one of the major concerns for sustainable reservoir operation. Since sediment concentration of the rivers in the Himalayan Mountain is very high, a proper sediment management scheme is necessary. This paper presents long-term reservoir sedimentation and sediment flushing based on the gate operation. Focused on the reservoir to be constructed for the Patrind hydropower project in Pakistan, 4 different flushing scenarios were proposed in this study to prevent successive sedimentation. By extending flushing period and by increasing the flushing discharge for 2 times, the flushing rate increases up to 53.2% and 43.6% in proportion to flushing period and discharge, respectively. Based on the simulation presented in this paper, it is expected to establish efficient sediment management plan to increase hydro power generation and sediment flushing simultaneously.

주암호 복내 저수구역내 침수 자생식물의 질소 및 인 모니터링 (Monitoring of Nitrogen and Phosphorus from Submerged Plants in Boknae Reservoir around Juam Lake)

  • 강세원;서동철;이상규;서영진;박주왕;최익원;박종환;임병진;허종수;조주식
    • 한국환경농학회지
    • /
    • 제32권1호
    • /
    • pp.9-16
    • /
    • 2013
  • 주암호내 복내 저수구역에서 서식하는 자생식물체들이 침수시 주암호 수질에 미치는 영향을 파악하기 위하여 복내 저수구역이 침수되기 전인 2010년 8월의 영양염류(질소 및 인) 최대 흡수량과 침수 후 다시 침수이전 수위로 회복된 2011년 2월에 남은 식생의 영양염류 잔존량 차이를 이용하여 산술적인 영양염류 용출량을 산정하였다. 2010년 8월에 침수되기전 복내 저수구역내 식생의 면적은 987,872 $m^2$이었다. 침수전인 2010년 8월에 복내 저수구역내 식생의 분포면적별 T-N의 흡수량은 물억새가 247 kg/total reservoir area, 이삭사초가 11,340 kg/total reservoir area로 분포면적이 넓은 이삭사초의 T-N 흡수량이 물억새에 비해 많았으며, T-P의 흡수량도 1,231 kg/total reservoir area로 이삭사초가 가장 많았다. 침수 후 2011년 2월에 조사된 상부지역 물억새의 T-N 및 T-P의 잔존량은 각각 34 및 11 kg/total reservoir area로 침수 전에 비해 감소하였고, 이삭사초의 T-N 및 T-P의 잔존량은 각각 491 및 68 kg/total reservoir area로 물억새와 비슷한 경향으로 침수 전에 비해 감소하였다. 이상의 결과를 종합하여 복내 저수구역내 식생의 T-N 및 T-P의 총 용출량을 산정한 결과 T-N 용출량은 복내 저수구역 총 식생면적(987,872 $m^2$)당 12,212 kg, T-P 용출량은 총 식생면적당 1,324 kg이었다. 따라서 복내 저수구역내 자생식물은 침수시 수중에서 분해되면서 식물체내 질소 및 인이 용출되어 주암호의 수질오염을 가중시킬 수 있는 한 요인이 될 수 있으므로 호소내 수질개선을 위해서는 저수구역내 식물체의 관리방안이 필요할 것으로 판단된다.

다목적댐 용량 재할당에 대한 연구(I)- 치수용량 분석 (A Study for Storage Reallocation of Multipurpose Reservoir(I) - Flood Control Storage Analysis)

  • 이재응;권용익;윤용남;안태진
    • 한국수자원학회논문집
    • /
    • 제37권4호
    • /
    • pp.273-281
    • /
    • 2004
  • 일반적으로 저수지는 건설되기 이전에 설정된 이용계획에 따라 용량이 할당되고, 방류량의 조절로 운영정책이 확립된다. 이렇게 수립된 저수지 할당계획은 댐의 증고 또는 용도변경과 같은 특별한 사항이 발생하기 전까지는 변화되지 않는다. 하지만 시간이 경과함에 따가 공공의 필요성과 목적에 변화가 발생할 수 있으므로 이를 반영하기 위한 하나의 대안으로서 다목적댐의 용량 재할당에 대한 연구를 수행하였다. 본 연구에서 금강유역의 대청다목적댐을 대상으로 여러 가지 저수용량 재할당 대안에 대하여 홍수조절용량에 대한 평가를 실시한 결과, 대청댐의 상시만수위를 증가시키더라도 동일한 홍수사상에 대하여 대청댐 단독운영의 경우 보다 홍수 제어능력이 감소하지 않는다는 것을 확인할 수 있었다.

DAMBRK 모형을 이용한 괴연저수지 붕괴유출량 추정 (Estimation of Break Outflow from the Goeyeon Reservoir Using DAMBRK Model)

  • 이진영;박동혁;김성준;김태웅
    • 대한토목학회논문집
    • /
    • 제37권2호
    • /
    • pp.459-466
    • /
    • 2017
  • 최근 지자체 및 한국농어촌공사가 관할하는 저수지의 붕괴가 빈번하게 발생하고 있다. 최근의 사례로, 축조된 지 70년 이상의 노후된 농업용 저수지인 경북 영천시 소재의 괴연저수지가 2014년 08월 21일 9시경 집중호우로 인하여 여수로를 중심으로 붕괴되었다. 본 연구에서는 괴연저수지의 붕괴상황을 DAMBRK 모형을 통하여 재현하였다. 그리고 DAMBRK 모형에서 분석된 댐붕괴 유출량으로 침수범람도를 작성하였다. 괴연저수지 붕괴 당시 무인항공기로 촬영한 침수사진과 비교하여 괴연저수지의 붕괴 지속기간과 붕괴유출량을 추정하였다. 본 연구 결과는 괴연저수지와 같이 저수지 붕괴가 발생할 경우, 하류 지역에 대한 침수피해 예측에 활용할 수 있을 것으로 기대된다.