• 제목/요약/키워드: R&D Project Evaluation

검색결과 215건 처리시간 0.026초

연구개발과제 선정을 위한 단계별 평가모형 (An Evaluation Models for R&D Projects Selection)

  • 이상철;하정진;김성희
    • 산업경영시스템학회지
    • /
    • 제17권31호
    • /
    • pp.73-80
    • /
    • 1994
  • Sequentiality in decision making is an inherent characteristic of the R&D Process, Conceptual changes are noted during the Course of the Project which represent a continuous improvement in the quality of the data available during the various project stages. In this paper, Eight characteristic types of project evaluation models have been developed economic index models, portfolio models, decision theory models, risk analysis models, frontier models, scoring models, profile models and checklists. Each of these will be critically reviewed and appraised.

  • PDF

국방 R&D프로젝트의 일정-비용분석모델의 연구 (A study on a schedule-cost analysis model for defense R&D project planning)

  • 황홍석;류정철;정덕길
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1996년도 춘계공동학술대회논문집; 공군사관학교, 청주; 26-27 Apr. 1996
    • /
    • pp.213-216
    • /
    • 1996
  • R'||'&'||'D project management is a process of decisions concerned with the achievement of goals of objectives. Especially, defense R'||'&'||'D project planning is the key in the successfull management of defense development. The defense project managers are constantly having to perform "what if\ulcorner" exercise, such as what if the project is extended out for an additional cost\ulcorner In this reserch, we developed a schedule-cost analysis model based upon Critical Path Method(CPM) and Venture Evaluation and Review Technique(VERT) for schedule-cost trade off analysis defense R'||'&'||'D projects. In the first step, a deterministic model is developed as a heuristic which deterministic model is developed as a heuristic which determines the schedule extension and reduction cost as a function desired schedule. In the second step, a stochastic network simulation model is developed to analyse the project risk (sucess and failure). The expected time and cost can be determined for desired schedule under the assumptions of stochastic arc data (time and cost) with a various precedence relationships. This model provides the defense R'||'&'||'D managers with an estimated and expected cost for curtailing or extending a project a given amount of time. The effectiveness and efficiency of the proposed methods, a heuristic and stochastic networks simulations, have been demonstrated through examples.

  • PDF

R&D 프로젝트 관리 프로세스 개선 및 운영을 위한 평가지표 개발 연구 (A Study on the Development of Evaluation Index for the Improvement and Operation of R&D Project Management Process)

  • 이설빈
    • 한국콘텐츠학회논문지
    • /
    • 제18권9호
    • /
    • pp.308-319
    • /
    • 2018
  • 본 연구는 R&D 프로젝트 관리 프로세스 개선 및 운영을 위한 평가지표 개발을 위해 연구개발 프로젝트를 수행 하는 국내 중소기업체를 대상으로 실증조사 하였으며, 그 결과를 보면 다음과 같다. 첫째, 12개 평가 지표에 있어 최고 점수인 통합 관리의 60.77점에서부터 최저 점수인 30점대까지 무려 2배 이상의 편차를 보여 R&D 프로젝트 관리 프로세스 및 개선 운영을 위해 선별적 사용이 요구된다. 둘째, 업종별 차이 검정 결과 바이오산업이 가장 높게 나타났으며 화학과 전기전자산업이 가장 낮게 나타났다. 셋째, 종업원 규모별 차이 검정 결과 50~100인 미만이 중소기업에서 상대적으로 높게 나타나고 100인 이상 규모에서는 다소 낮은 차이를 보였다. 넷째, 경력별 차이 검정 결과 5~7년이 상대적으로 높게 나타났으며 7-10년이 다소 높게 나타났다. 전체적으로 R&D 프로젝트 프로세스 개선 운영을 위한 평가 지표 검정 결과 통합관리, 의사소통관리, 리스크관리, 시간관리의 4가지 요인의 순으로 중요도를 나타냈으며, 이는 효율적인 통합관리의 중요성과 각 개별 참여 주체간의 빠른 의사결정과 위험관리에 중심을 두고 집중관리가 요구됨을 시사해주었다.

R & D 프로젝트의 위험분석모형의 연구 (A Risk Analysis Model Using VERT for R & D Project Management)

  • 황홍석
    • 한국경영과학회지
    • /
    • 제20권1호
    • /
    • pp.85-99
    • /
    • 1995
  • Increasingly, risk analysis is becoming important ingredients in achieving the successful implementation and application in the area of the project management. The project management system is designed to manage or control the project resources on a given activity within time, cost and performance so called TPPM (Total Productive Project Management). In this research, a risk analysis model misproposed to identify potential problem areas, quantify the risks, and generated the chice of the action that can be taken to reduce the risk. In addition two analysis models are proposed : 1) risk factor model and 2) network simulation model using VERT (Venture Evaluation and Review Technique ). The objective of the remodels is to estimate the schedule, cost performance risks. These proposed quantitative models for project risk analysis are proving its value for the project managers who need to assess the risk of changes in cost, schedule, or performance. The proposed models will be used in the area of project selection, evaluation and the allocation of project resources.

  • PDF

연구개발프로젝트의 비용효과분석 활용 실태 - 주요 기업연구소의 조사결과를 중심으로 - (A Survey of the Cost Benefit Analysis to R&D Projects of Selected Laboratories.)

  • 서현진
    • 기술경영경제학회:학술대회논문집
    • /
    • 기술경영경제학회 1998년도 제13회 하계학술발표회 논문집
    • /
    • pp.38-56
    • /
    • 1998
  • We are faced with the crisis of the R&D investment because of the effects of the IMF conditions. Most of the laboratories are going to restructure by the cutting off of money, man power and the reduction of R&D thema. Therefore it is necessary to allocate the R&D resources effectively to the R&D projects. The evaluation and the selection of the R&D projects have been recognized as the most important process for the allocation of the R&D resources. The result of the KITA(1997) shows that the commercial success rate of the R&D from new-product brain storming is only 5.8%. This study aims to analyze the actual conditions of the cost benefit analysis(CBA) of R&D projects of selected laboratories and to study measure methods of the R&D benefits. The research method of this study reviews the CBA of R&D firstly, and surveys 200 selected high ranking labs of the R&D expenditures. For the comparison of the results between '87 and '97, this survey used the same questionaries for each year. As the result of the survey only 27 labs(response rate 13.5%) responded. The result of the '97 survey is as follows : The CBA is used by 44% of responding labs. The economic evaluation method for the R&D project selection is used by 48% of labs and this numbers increased by over 10 percents points compared with the result of '87. The CBA is used for about 40% about each of the budget preparing and the budget analysis, and by 30% of labs to analyze sales and expenditures of the overall period of the project. As the measurement of benefits of R&D projects, 30% of labs responded that it is impossible to measure the benefits, and 20% of labs measured the benefits between sales and expenditures of the R&D project.

  • PDF

R&D 프로세스 성숙도가 제품개발 성과에 미치는 영향: R&D 프로젝트 성과의 매개효과를 중심으로 (The Effects of R&D Process Maturity on Product Development Performance: Focused on Mediating Effect of R&D Project Performance)

  • 신경식;오민정;김원기;박소현
    • 정보처리학회논문지:컴퓨터 및 통신 시스템
    • /
    • 제7권7호
    • /
    • pp.165-174
    • /
    • 2018
  • 본 연구는 R&D 프로세스 성숙도가 제품개발 성과에 미치는 영향을 확인하고, 그 과정에서 R&D 프로젝트 성과가 R&D 프로세스 성숙도와 제품개발 성과의 관계에서 매개역할을 하는지 검증하는데 목적이 있다. 본 연구목적의 실증분석을 위해 설정된 연구가설을 검증하기 위하여 R&D 업무를 수행하는 55개의 기업과 공공기관을 대상으로 R&D 업무와 관련된 131명의 인원에게 설문을 수집 분석하였다. 실증분석 방법으로 변수들과 요인들에 대한 신뢰성 및 타당성 검증, 상관관계분석을 진행하였고 R&D 프로세스 성숙도가 제품개발 성과에 미치는 영향에 대해서는 단순 다중회귀분석, R&D 프로젝트 성과의 매개효과에 대해서는 매개회귀분석을 SPSS 통계프로그램으로 분석하였다. 분석결과 R&D 프로세스 성숙도가 높을수록 제품개발 성과와 R&D 프로젝트 성과가 높아지는 것으로 나타났고, R&D 프로젝트 성과는 부분매개효과가 있음을 확인할 수 있었다. 이러한 연구결과를 기반으로 기업에서는 제품개발 성과를 향상시키기 위해서는 체계적인 R&D 프로세스의 수립과 운영이 필요하고, 기업 특성에 적합한 프로젝트관리 방법론의 개발이 중요하다는 결론을 제시하였다. 본 연구결과에서 정리된 R&D 프로세스 성숙도 및 R&D 프로젝트 성과, 제품개발 성과에 대한 실증분석 결과를 기업 경영에 실질적인 R&D 관리 방법론으로 활용한다면 기업의 연구개발 성과 향상에 기여할 것으로 기대된다.

R&D 프로젝트 성과의 경제적 가치 측정 모델 연구 (A Study on Economic Measurement Model of R&D Project Performance)

  • 김영명;성한규
    • 기술혁신연구
    • /
    • 제21권1호
    • /
    • pp.229-252
    • /
    • 2013
  • 본 연구의 목적은 연구개발(R&D) 프로젝트의 성과를 재무적 가치로 측정하기 위한 모델을 제안하는 것이다. 이를 위해 선행 연구를 통해 연구개발 프로젝트 성과를 측정할 수 있는 지표를 추출하고, 그 측정 방법을 제시하였다. R&D 성과를 재무적 가치로 환산하려는 일부 시도가 있었으나 전문가 평가, 예상 매출액, 미래시장 점유율, 할인율, 순현재가치, 실물옵션 접근법 등 주관적 의견과 과도한 예측으로 측정결과에 대한 의문이 제기되었다. 이러한 문제점을 보완하고 다양한 각도에서 재무적 가치로 평가가 가능한 모델을 제안하고자 한다. 개발된 모델을 국내 IT 기업의 실제 사례를 통하여 검증을 실시하여 신뢰성을 높였기 때문에 추후 기업의 R&D 프로젝트에 대한 경제적 평가에 새로운 전기를 마련할 수 있을 것으로 기대된다.

  • PDF

소방·방재 R&D 성과분석 연구 (Performance Analysis for Fire Suppression and Disaster Management R&D Projects)

  • Yoon, Jonghyun;Kim, Geunyoung;Lim, Hyeounjoon
    • 한국재난정보학회 논문집
    • /
    • 제10권2호
    • /
    • pp.208-218
    • /
    • 2014
  • 재난 안전사고에 따른 피해액 증가 및 재난 안전 관련 산업의 성장은 소방방재 R&D 사업에 대한 과학적 성과평가의 필요성을 높여 주고 있다. 2004~2011년 동안의 소방방재 R&D 성과분석 결과에 따르면 성과유형에 있어서 학술적 성과와 공공적 성과가 다수를 이룬다. 그리고 연구수행주체와 연구개발단계별로 성과유형의 특성이 있음을 확인하였다. 이와 같은 결과는 연구수행주체별 성과물의 특성과 연구개발단계별 성과물의 특성을 감안하여 연구과제 선정평가 시 적절한 연구수행 주체와 과학기술분야의 선정과 수행 주체별 성과목표 설정의 적절성을 판단하는데 활용할 수 있을 것으로 보인다. 아울러 성과관리를 위한 기초적인 자료로 활용될 것으로 보인다. 향후 이와 같은 소방 방재 특성을 개선하기 위한 방안을 마련하기 위한 연구를 전문적으로 수행할 필요가 있는 것으로 보인다.

업무효율 향상을 위한 연구개발사업 평가관리시스템 구현 (A study on R&D project evaluation system for enhanching work effectiveness)

  • 류지웅;송종철;문병주;정회경
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국정보통신학회 2012년도 추계학술대회
    • /
    • pp.515-517
    • /
    • 2012
  • 국가 기술경쟁력 강화를 위한 연구개발사업의 중요성은 지속적으로 증대되고 있으며, 따라서 사업의 투자 성과 및 활용성을 평가하는 것, 또한 중요한 요소이다. 본 논문에서는 정보통신분야의 국가 연구개발사업을 관리하는 정보통신산업진흥원의 다양한 형태의 사업에 대한 성과 및 결과에 대한 평가방안과 프로세스를 반영한 전자평가시스템 개발에 대해 논의하고자 한다. 이를 통해 평가의 객관성을 보장하고, 프로세스의 시스템화를 통해 업무의 효율성을 증대시킬 수 있는 방안에 대해 살펴보고자 한다.

  • PDF

연구과제 선정.평가 체계설계에 관한 연구 (Project Selection & Evaluation System Design and Implementation-Literature Review and Case Study-)

  • 용세중;최덕출;한종우;정용훈;이원영
    • 기술혁신연구
    • /
    • 제2권1호
    • /
    • pp.116-141
    • /
    • 1994
  • This paper presents a model for R&D project selection and evaluation system design developed through literature review. The model emphasizes the fitness between the five elements of the system : evaluation phase and purpose, personnel and organization, evaluation critiria and decision model, evaluation form and procedure, and projects. The model was applied in real situation as a test case. The important findings are that a good project selection and evaluation model contributes only partially to the effectiveness of the project selection and that system development and implementation activity is a dynamic and multi-facetted learning process.

  • PDF