• Title/Summary/Keyword: Quay productivity

Search Result 36, Processing Time 0.021 seconds

The Estimation of Productivity Considering New Technology Port- Equipment By Using Simulation (시뮬레이션을 활용한 신기술 항만장비의 생산성 추정)

  • Kim, Dong-Won
    • Journal of the Korea Society of Computer and Information
    • /
    • v.20 no.1
    • /
    • pp.237-246
    • /
    • 2015
  • In this paper, Improved productivity models of container terminal are provided by utilizing a simulation considering Tandem-lift Quay Crane and transport vehicle of container's high productivity 'Alternative ship-to-yard vehicles.' Feature of this method is deriving the data of tandem-lift Quay Crane and Alternative ship-to-yard vehicles, estimating the productivity model of tandem-lift Quay Crane by using regression analysis. Tandem-lift Quay Crane is equipment of loading and unloading to increase productivity approximately by 2 time existing (single, twin) Quay Crane by dealing with four 20ft containers or two 40ft containers at the same. Alternative ship-to-yard vehicles can transfer containers(4TEU) more than existing Yard Tractor. This paper is deriving the optimal combination showing the highest productivity by using simulation considering Tandem-lift Quay Crane and Alternative ship-to-yard vehicles on container terminals and developing estimating model of productivity by using regression analysis using data of simulation.

A Comparative Study on Productivity of Next Generation Quay Crane in Container Terminal (컨테이너 터미널의 차세대 안벽크레인 생산성 비교분석)

  • Ha Tae-Young;Choi Yong-Seok
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2004.11a
    • /
    • pp.297-302
    • /
    • 2004
  • This paper analyzed productivity of quay cranes on container terminal that have perpendicular yard layout block. In most existing container terminals, quay cranes of single trolley type are used to loading and unloading containers, but quay crane productivity of these type has many limitation about large size containership. For these reasons, recently quay cranes of various type that mn improve productivity are developed and as the representative example, dual trolley, double trolley, supertainer are developing. These cranes are realized that very high productivity bemuse their cycle time is short more than existent single trolley quay crane. Therefore, we analyzed productivity of these cranes that are realized by next generation crane alternatives and as result qf this research, mechaniml productivity by cycle time and net productivity by simulation were measured.

  • PDF

An analysis about the coefficient used to estimate the quay capacity at the container terminal (컨테이너 터미널의 적정 안벽능력 분석에 적용되는 계수들에 대한 분석)

  • 김창곤
    • Journal of Korean Port Research
    • /
    • v.14 no.3
    • /
    • pp.259-267
    • /
    • 2000
  • This study aims to analyse the coefficient used to estimate the quay capacity per year at the container terminal. The capacity of the container terminal is composed of the capacity at the quay side and the other working conditions at the back of the quay side. But when we refer the capacity of the container terminal, generally we used capacity as that of the container terminal. To estimate the quay capacity independently of the working conditions at the back of quay side, we calculate the quay capacity as th product of working hours per year, productivity of container crane and relate other coefficients, such that berth utilization, crane utilization and efficiency. So that coefficients are properly defined to reflect the other working conditions. If we calculate the quay capacity by the product of working hours modified by the berth utilization and crane productivity modified by the crane utilization and efficiency, the meaning of that coefficients must be strictly defined. So there could be no confusion to apply that coefficients to calculate the quay capacity. In this study, we exclusively define the meaning of the berth utilization, crane utilization and efficiency according to the internal-meaning of thats in the function to calculate the quay capacity. And compare each coefficients by decomposing the working hours at the terminal.

  • PDF

Quay Crane Dual-cycle Plan considering Yard Tractor waiting time (야드 트랙터 대기시간을 고려한 크레인 듀얼 사이클 계획)

  • Chung, Chang-Yun;Shin, Jae-Young
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2009.10a
    • /
    • pp.220-221
    • /
    • 2009
  • One of the important performance measure for productivity at container terminals is the working productivity in the quay. working scheduling of quay cranes (QCs) gives a significant impact on the quay working productivity. The recent managers of the terminals pay high interests in equipment investment and operation methods with a new concept in order to enhance the quay working productivity. The double cycle or dual cycle, which is a method to increase the quay productivity with no application of new equipment, but with the change of operations, has been received strong attention in academic research. The majority of studies until this time has been realized the quay work as the bottleneck and focused on those works. However, if the QCs do notver, it the Cs d-trotver,(CT) if t the Cs, there would be the pos ibilf tes that the effectiveness of them is decreasedveaused by the longer, if t the Cs. Thus, this paper, suggests the solutions on the con th scheduling for the dual cycle operation considering the YT.

  • PDF

A Study on the Dynamic Export Yard Planning Considering Pattern of Coming-in Containers (반입 패턴을 고려한 동적 수출 장치장 운영 계획에 관한 연구)

  • Lee, Jong-Ho;Shin, Jae-Young
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2007.12a
    • /
    • pp.337-339
    • /
    • 2007
  • The productivity of container terminal is usually regarded same as the productivity of quay crane. Operation of quay crane for the export is started from picking up a container in yard block. In doing so, smooth flow of container is vital to maximize the productivity of quay crane. Improvement of quay crane's productivity means improvement of entire productivity in container terminal, which reinforces the competitiveness of terminal consequently. Setting effective plan is essential to improve work flow from yard to quay crane. For optimal plan, it is necessary to gather information about exact time schedule of come-and-go containers for loading, amount of containers that will be come to terminal. Generally, the arrival time of containers and the amount of containers are definite and predictable. However, in the case of export container, the arrival time of containers is random and unpredictable. This study examines the pattern of coming-in containers as time goes in container yard and provides the solution to how to plan export yard considering the change of state in terminal and adapt it to container yard plan

  • PDF

A Comparative Study on Productivity of High Performance Quay Crane in Container Terminal (고성능 안벽크레인의 터미널 하역 생산성 비교분석)

  • Ha Tae-Young;Choi Yong-Seok
    • Journal of Navigation and Port Research
    • /
    • v.29 no.6 s.102
    • /
    • pp.547-553
    • /
    • 2005
  • The purpose of this paper is to evaluate the quay crane productivity in automated container terminal with perpendicular yard layout. In particular, four quay crane (single trolley/dual trolley/double trolley/supertainer) are considered to evaluate the productivity on the terminal performance. Each quay crane load or unload containers by a different process. For each quay crane, two productivities are considered and compared: mechanical productivity, net productivity. As the net productivity of quay crane is significant, in this paper, an application of simulation model to simulate automated container terminal is developed and a wide variety of computational experiments were conducted.

Dual Cycle Plan for Efficient Ship Loading and Unloading in Container Terminals (컨테이너 터미널의 효율적인 선적 작업을 위한 Dual Cycle 계획)

  • Chung, Chang-Yun;Shin, Jae-Young
    • Journal of Navigation and Port Research
    • /
    • v.33 no.8
    • /
    • pp.555-562
    • /
    • 2009
  • At container terminals, a major measurement of productivity can be work-efficiency in quay-side. At the apron, containers are loaded onto the ship and unloaded to apron by Q/C(Quay Crane). For improving the productivity of quay crane, the more efficient Y/T(Yard Tractor) operation method is necessary in container terminals. Between quay-side and yard area, current transferring methods is single-cycling which doesn't start loading unless it finishes unloading. Dual-cycling is a technique that can be used to improve the productivity of quay-side and utility of yard tractor by ship loading and unloading simultaneously. Using the dual-cycling at terminals only necessitates an operational change without purchasing extra equipment. Exactly, Y/T operation method has to be changed the dedicate system to pooling system. This paper presents an efficient ship loading and unloading plan in container terminals, which use the dual-cycling. We propose genetic and tabu search algorithm for this problem.

A Study on improvement of Quay productivity with minimizing double activities in Container Terminal Yard (컨테이너터미널 야드 중복작업 최소화를 통한 안벽 생산성 향상에 관한 연구)

  • Kim, Geong-Jung;Lee, Jung-Sun;Lee, Moun-Su;Kwak, Kyu-Seok
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2007.12a
    • /
    • pp.340-341
    • /
    • 2007
  • In case of Busan Port container terminals scale of a yard device chapter is small and narrow, and redundant works of device chapter facilities ability and transfer cranes are misgovernment occurring very much bemuse of this There is to the misgovernment that cannot support design ability of a container crane of quay because of this There is this in a change of marine transportation harbor environment to cross over to a large easel next of a ship, and a large problem cannot but become. Watched how redundant works were occurring in the second yards, and presented a problem Also, present the hint point tint these redundant works analyze how productivity of quay productivity and container crane is improved if solution works, and face to this.

  • PDF

Optimization of YT Dispatching Policy for Maximizing Quay Side Productivity in Container Terminals (컨테이너 터미널의 해측 생산성 극대화를 위한 YT 배차 전략 최적화)

  • Kim, Taekwang;Ryu, Kwang Ryel
    • Journal of Navigation and Port Research
    • /
    • v.44 no.3
    • /
    • pp.227-234
    • /
    • 2020
  • One of the most important operational goals in container terminals is to maximize the quay side productivity by minimizing the turnaround times of the vessels, for which the operations of the quay cranes (QC) to load/unload containers onto/from the vessels should be conducted efficiently without delays. This paper suggests using a policy-based dispatching method for YTs (Yard Tractor) that deliver containers between QCs and the storage yard. The goal of using such a dispatching policy is to maximize the efficiency of the YT operation and accordingly to minimize the QC delays because of late arrivals of the YTs. In particular, in this paper, we modified the previously proposed policy for its application to real container terminal and verified the effect through simulation experiments using real terminal data.

Analytical Models for the Optimal Number and the Optimal Operation of Yard Trucks in Container Terminal (컨테이너 터미널의 야드 트럭의 최적 대수와 최적 운행을 위한 해석 모형)

  • Kim, Ki-Young
    • IE interfaces
    • /
    • v.20 no.4
    • /
    • pp.498-503
    • /
    • 2007
  • The synchronized operation of a quay crane(QC) and a transfer crane(TC) increases the productivity of a container terminal. In this paper, analytical models are suggested for the optimal number and the optimal operation of the yard trucks (YTs) which travel between a quay crane and a transfer crane in a container terminal. YT may represent yard tractor, AGV and shuttle carrier. The analytical models are so simple and useful that the analysis and the results of this paper can be used not only in container terminal practices but also in many other application fields.