• Title/Summary/Keyword: Quantity of standard work

Search Result 56, Processing Time 0.023 seconds

A Study on the New Classification System and Interpretation Work Methods for Standardization of Power IT Terminologies (전력IT용어의 표준화를 위한 새로운 매트릭스 분류체계 및 뜻풀이 작업 방법에 대한 연구)

  • Kim, Jung-Hoon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.2
    • /
    • pp.277-284
    • /
    • 2010
  • As technology is developed, the quantity of new vocabularies is increasing more rapidly. So many vocabularies of technology have various meanings for each part and are used diversely according to circumstances. Therefore, the necessity of reasonable methods of standardization and purification is increasing and it is necessary to establish a classification system of terminology for the first phase of the standardization. Firstly, based on classification systems of power and IT standard dictionaries, scientific and technological standard, SPARK, power IT fields of IEC and organization units of corporations, we propose a new classification system for the standardization of power IT terminologies. The classification system consists of a hierarchical structure with general classification, application fields and specific technologies while keeping the conventional matrix-type classification system. And interpretation methods of power IT terminologies, which are classified according to the new classification system for the standardization of power IT terminologies, is proposed. The interpretation works of the power IT terminologies confirm that the classification system is systematic and the interpretation process is efficient.

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.2
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.

A Study on the Possibility of Initial Cost Saving in the New Housing Model Considering Long-life and Constructability - Focused on the Case Analysis with Converting Skeleton and Cladding to New Systems - (장수명화와 시공성을 고려한 새로운 공동주택 모델의 초기 비용절감 가능성 연구 - 구조체와 외장전환 사례분석을 중심으로 -)

  • Kim, Soo-Am;Shin, Sung-Eun;Chung, Joon-Soo;Shon, Young-Jin
    • Journal of the Korean housing association
    • /
    • v.23 no.6
    • /
    • pp.49-59
    • /
    • 2012
  • This study suggested a new model in consideration of long life and constructability of apartment house suggested in the former part. New model suggested the possibility of cost saving based on the idea that people trend to reject because of the recognition that the new model would cost a lot of expense which work as the barrier for the expansion and distribution at the local market so as to prepare the ground for its activation. The Study was aimed at verifying the possibility of cost saving through comparing it with the existing standard apartment house system centered on the skeleton and cladding system among the new structural design models suggested in the former part. Assuming that these existing standard both models should be changed structural design into new model system, the quantity volume, cost and construction period along with the alteration of finished materials between two models were compared altogether. Simultaneously BIM library was built for easy taking-off bill of quantity and consideration of working methodology for construction working cycle, which was translated into construction cost so as to derive the cost of the two subject systems to be counted. Through the analysis, it was concluded that new model would secure variability in the future and constructability along with shortening the construction period (29%) and achieve cost saving (13%) of construction against the those of existing model.

LCA Based Environmental Load Estimation Model for Road Drainage Work Using Available Information in the Initial Design Stage (초기 설계단계의 가용정보를 활용한 도로 배수공종의 LCA기반 환경부하량 산정모델)

  • Park, Jin-Young;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.70-78
    • /
    • 2018
  • Due to the increasing concern about climate change, efforts to reduce environmental load are continuously being made in construction industry, and life cycle assessment (LCA) is being presented as an effective method to assess environmental load. Since LCA requires information on construction quantity used for environmental load estimation, however, it is not being utilized in the environmental review at the initial design stage where it is difficult to obtain such information. In this study, a construction quantity computation system based on the standard section was developed for the drainage facilities of the road and utilized in the model to calculate the environmental load. This model can estimate the environmental load by calculating the amount of resources required for LCA using only the information available at the initial design stage. To verify the validity of the model, five validation cases were applied and compared with the unit estimation model and the multiple regression analysis model. As a result, it is confirmed that the mean absolute error rate is 9.94%, which is relatively accurate and effective model in the initial design stage.

An Analysis of the Characteristics of Standard Work and Design Information on Estimating Environmental Loads of PSC Beam Bridge in the Design Phase (PSC Beam 교량의 설계단계 환경부하량 산정을 위한 공종 및 설계정보 특성 분석)

  • Yun, Won Gun;Ha, Ji Kwang;Kim, Kyong Ju
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.4
    • /
    • pp.705-716
    • /
    • 2017
  • As many environmental pollution problems have arisen, various studies related to the environmental evaluation have been carried out in the construction industry. However, there is no methodology for estimating the environmental load quickly for design alternatives of civil facilities in the design phase. This study aim to establish criteria of works information and designed parts which can efficiently estimate environmental loads of PSC beam bridge based on standard quantity at the early design phase. For this purpose, a detailed environmental loads database was constructed by performing Life Cycle Assessment (LCA) based on detailed design data of 25 bridges. In addition, major work with high impact on environmental load were selected, and the analysis of characteristics of environmental load according to the required materials and 8 impact categories were conducted. As a result, the superstructure accounted for 42.91%. In the superstructure, remicon of the material base and PSC beam work occupied 53.13% and 31.25%. In the substructure, remicon, rebar, and cement, which are material base, accounted for more than 93%. It is expected that this major work and material information for each part of bridge can be utilized in the construction of the model, which can estimate the approximate environmental load, reflecting the characteristics of the structure in the design phase.

A Rating Tabulation System of Amenity / Disamenity Elements in Rural Villages (농촌마을 수준에서의 어메니티 강화 및 저해요소 평가등급체계 구축)

  • Lim, Chang-Su;Choi, Soo-Myung;Kim, Young-Joo;Cho, Young-Jae
    • Journal of Korean Society of Rural Planning
    • /
    • v.13 no.2
    • /
    • pp.27-38
    • /
    • 2007
  • This study, a sub-one of comprehensive research work titled under "A Evaluation System of Amenity / Disamenity Elements in Rural Villages", tried to propose a rational methodology for development of rating tabulation for evaluation of amenity / disamenity elements in rural villages. The system developed in the study has the formalized rating grades between 2 and 5 for convenience/simplification of analysis work. For each evaluation element in the lowest order of the system, 5 types of rating technique were arranged, which were based on statistical analysis using mean and standard deviation values, its existence or not, relative significance of its holding volume and quality, synthesized weight scale of its quality and quantity, and the others. And, standardized 4-steps procedure for rating tabulation was proposed. Finally, through case studies of 4 sample villages representing the flat-plain, upland, seashore and periurban rural areas, the applicability of this rating tabulation system was verified.

Variation Determinants in Building Construction: Ghanaian Professionals Perspective

  • Asamaoh, Richard Oduro;Offei-Nyako, Kofi
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.4
    • /
    • pp.20-25
    • /
    • 2013
  • Variation in construction means modification of design, changes in quality, quantity of work including the alteration of standard of materials or goods to be used in the work and the removal from site any kind of material not in accordance in the contract. In Ghana, Variation order has become major issue in the construction industry. This had resulted in cost overruns, delay and in some contracts dispute, between parties. The aim of this paper was to identify the root causes of variation; effects of variations on projects in Ghana and the means of reducing the impact of variation order. The method of the study involved literature review, primary data collection, interview and closed - ended- questionnaires. Mean Scores Method was used to rank the identified factors causing variation. Analysis Of Variance Test was use to test for the significant difference between means among the professional groups. The study revealed that most causes of variation were change of design by client and inadequate working details. Establishment of oversight project management committee and flow of information were identified as means of controlling variations during project administration.

Image reconstruction algorithm for momentum dependent muon scattering tomography

  • JungHyun Bae;Rose Montgomery;Stylianos Chatzidakis
    • Nuclear Engineering and Technology
    • /
    • v.56 no.5
    • /
    • pp.1553-1561
    • /
    • 2024
  • Nondestructive radiography using cosmic ray muons has been used for decades to monitor nuclear reactor and spent nuclear fuel storage. Because nuclear fuel assemblies are highly dense and large, typical radiation probes such as x-rays cannot penetrate these target imaging objects. Although cosmic ray muons are highly penetrative for nuclear fuels as a result of their relatively high energy, the wide application of muon tomography is limited because of naturally low cosmic ray muon flux. This work presents a new image reconstruction algorithm to maximize the utility of cosmic ray muon in tomography applications. Muon momentum information is used to improve imaging resolution, as well as muon scattering angle. In this work, a new convolution was introduced known as M-value, which is a mathematical integration of two measured quantities: scattering angle and momentum. It captures the objects' quantity and density in a way that is easy to use with image reconstruction algorithms. The results demonstrate how to reconstruct images when muon momentum measurements are included in a typical muon scattering tomography algorithm. Using M-value improves muon tomography image resolution by replacing the scattering angle value without increasing computation costs. This new algorithm is projected to be a standard nondestructive radiography technique for spent nuclear fuel and nuclear material management.

Demolition Cost Estimation of Small-size Rental Housing based on the Quantity per Unit Method (원가계산방식에 의한 다가구임대주택 해체공사비 예측)

  • Park, Seong-Sik;Lee, Sung-Bok;Shin, Sang-Hoon
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.415-427
    • /
    • 2011
  • This study is aiming at estimating the demolition cost of deterioration housing by the rational method in order to provide for the demolition and new build project of the rental multi-family housing of LH. We investigated the actual state of demolition construction and work process of small size housing, and analysed an actual condition of estimation for the demolition cost through an advice by the expert of construction cost estimate. Furthermore, the 'estimation standard for the predetermined amount', 'estimation standard for the disposal cost of construction wastes' and precedent studies in public construction work were considered. As one of results in this study, cost accounting system, breakdown system and construction cost for the demolition work based on the standard of estimate were proposed and the predetermined amount of demolition construction for the multi-family housing with 2 or 3 floors could be produced by them. Eventually, It is estimated that the demolition cost per a multi-family housing is about 18,331,000(won) and 104,000(won) per floorage($m^2$). To the details, the result indicated that the direct demolition cost needs about 14,339,000(won) per a multi-family housing and the consignment disposal cost of wastes needs 3,992,000(won) per one. The results of the study will be used as the fundamental data to estimate the project cost in the phase of budget establishment for demolition and new build project of the deteriorated rental multi-family housings, and also cost accounting system of demolition construction and breakdown system are expect to be used effectively at the ordering of public construction work.

Design and Implementation of SGML Document Management System (SGML 문서 관리 시스템의 설계 및 구현)

  • Kim Yong-Hun;Lee Won-Suk;Ryu Eun-Suk;Lee Kyu-Chul;Lee Sang-Ki;Kim Hyun-Ki;Lee Hae-Ran;Zhoo Zong-Chul
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.32 no.3
    • /
    • pp.157-177
    • /
    • 1998
  • The 21st century will be the advanced Information society era. The management of very large quantity of electronic documents is important because new applications such as Digital Libraries, CSCW (Computer-Supported Cooperative Work) in Intranet, CALS (Commerce At the Light Speed) are emerging, which require the functionalities of efficient storing, searching and managing a bulk of electronic documents. SGML(Standard Generalized Markup Language) is an ISO Standard for representing structure information of electronic documents. This paper proposes an effective data model for storing and managing SGML documents. We also describe the design and implementation details of SGML document management system, which has capabilities of storing SGML instances, generating schema dynamically, and retrieving structure elements efficiently.

  • PDF