A Study on the Cost Estimate System Development Method for Nuclear Power Plant Construction Projects

  • Lee, Sang Hyun
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.133-137
    • /
    • 2017
  • Nuclear power plants in Korea are usually built based on a duplicated model; so the project cost data of the preceding unit can be used as reference when estimating the project cost for the succeeding unit. However, since the contracting method is oriented towards the price, empirical factors such as making top-down estimations using the reverse calculation method based on the completion cost of the preceding unit is dominant. In order to develop a project cost database to resolve such problems, the detailed cost boundary of the project cost data must be categorized by project and by system. This study proposes a method to connect the code of account with the base quantities and the IAEA account, and proposes a database structure for the development of a project cost estimation system. The estimation system developed in the future is expected to utilize the proposed project cost data structure.

  • PDF

Shear Retrofitting Effectiveness of CFS for R/C Columns (R/C기둥에 대한 CFS의 전단보강효과)

  • 이용택;이정희;황홍순;송성용;나정민;이리형
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.10a
    • /
    • pp.445-450
    • /
    • 2002
  • In this paper, FEM analysis is peformed in order to estimate the behavior of RC columns retrofitted with Carbon Fiber Sheet(CFS). Five specimens with different quantity of CFS are analyzed and compared with experimental results. The analytical results show that FEM can be used to predict the shear behavior of columns retrofitted with CFS.

  • PDF

An Experimental Study on the Frost Resistance of High-Strength Concrete using Blast-Furnace Slag (고로슬래그를 이용한 고강도콘크리트의 내동해성에 관한 실험적 연구)

  • 박선규;유재강;강석표;권영진;김무한
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1999.10a
    • /
    • pp.671-674
    • /
    • 1999
  • With increasing content of granulated blase furnace slag in cement, the content of capillary pores in the mortar decreases and later age strength of the concrete. Therefore, this provides greater reserves study is carried out to estimate frost resistance of high-strength concrete specimens with water cement ratios using blast-furnace slag. 1. Blast furnace concrete is comparatively more good frost resistance than normal concrete. 2. As the blast furnace slag increases, the quantity of pores with a radius of more than 30nanometer decreses.

  • PDF

Parametric Estimation of a Renewal Function

  • Jeong, Hai-Sung;Na, Myung-Hwan
    • International Journal of Reliability and Applications
    • /
    • v.1 no.1
    • /
    • pp.81-87
    • /
    • 2000
  • One of the most important quantities in reliability theory is the expected number of renewals of a system during a given interval. This quantity, the renewal function, is used to determine the optimal preventive maintenance policy and to estimate the cost of a warranty. In this paper we study a parametric approach for a renewal function. The simulation study is presented to compare the relative performance of the introduced estimators of a renewal function. And we show that the proposed parametric estimator performs well.

  • PDF

A Speed Sensorless Vector Control of Induction Motor Using Reduced-Order EKF (축소차원 EKF를 이용한 유도전동기의 속도 센서없는 벡터제어에 관한연구)

  • Lee, Hyun-Il;Kim, Young-Seok
    • Proceedings of the KIEE Conference
    • /
    • 1993.07b
    • /
    • pp.677-679
    • /
    • 1993
  • The necessary parameter and states for the field-oriented control scheme of induction motor have been correctly estimated by EKF(Extended Kalman Filter). In this paper, Reduced-Order EKF(Extended Kalman Filter) is proposed tn estimate rotor speed and rotor flux. It is profitable in the implementation of field-oriented control scheme rather than Full-Order EKF because of saving operational quantity. The simulation results show that the proposed Reduced-Order EKF is excellent performance.

  • PDF

A Study on the Development of Work-Crew Based Daily-Productivity for Representative B.O.Q Item in River Conservation Project (하천공사 대표공종의 작업조 구성 및 생산성 정보 개발)

  • Yoo, Duk-Yul;Park, Hyung-Keun;Lim, Hyeong-Min
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2519-2528
    • /
    • 2013
  • The standard of estimate is being used as basic material for appropriating construction expenses of public institutions and private institutions. The present thesis aims to propose a new form of a standard of estimate and a calculation method of work amount of equipment by targeting a representative construction type selected at river reservation work. The present thesis expects that the convenience of users can be expanded by improving applicability of a standard of estimate and simplifying a calculation process of work amount of equipment in a process planning stage so that the provision of work crew lineup information and daily productivity information is possible by a standard of estimate. In case of river conservation work, because the variables called work conditions act very largely, there exists much difficulty for generalizing productivity information and work amount of equipment, but if its accuracy could be enhanced by improving continuous productivity information and work amount information of equipment, the simplification of process planning establishment and cumulative process through a standard of estimate would be possible.

The Comparison and Analysis of Waste Quantity through a Case Study of Demolition Works (해체공사의 사례분석을 통한 폐기물 발생량 비교분석)

  • Kim, Chang-Hak;Lee, Kyoung-Hee;Kim, Hyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.131-139
    • /
    • 2008
  • Now, one of the greatest concerns at home and abroad is eco-friendly construction. Above all, the reduce and recycle of the construction waste may be one of the most important things. The construction waste has been produced most at demolition phase, but the research into that area has not being to make nearly within the country. Recently, as the government have realized the importance of that area, they are making research to improve traditional demolition methods. Also, they are preparing to make a raw to enforce deconstruction during demolition phase. This research has analyzed the problems and waste types which produced during the demolition works by surveying in site. Until now, in the interior, the right quantity basis has not been suggested, because of the absence of any methods to estimate it accurately. Therefore, this study has compared and analyzed owner's ordering quantity, drawing analysis quantity with measuring the waste to produced at site during demolition works, this research results are expected to be the important materials for future research into the construction waste area.

Development of framework to estimate environmental loads of PSC beam bridges based on LCA

  • Lee, Wan Ryul;Kim, Kyong Ju;Yun, Won Gun;Kim, In Kyum
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.730-731
    • /
    • 2015
  • This study aims at giving the framework to estimate the environmental load at planning and schematic phase. With increasing awareness of environmental issues, the effort to reduce the environmental impacts caused by human activity has been increasingly enlarged. So far most of researches estimating CO2 emissions have analyzed energy consumption based on BOQ (Bills of Quantity) acquired after detailed design. There is also lack of reliability in the estimated environmental impact using the basic unit of a facility at the planning stage, because it uses a limited specific section of historical data. Thus, this study is targeted at developing framework to assess reliable environmental loads based on information available at project early phases by making case-bases from historical design information on PSC Beam Bridge. Historical database is built on the basis of the LCA (Life Cycle Assessment) and in order to set input information for estimating model, the literature about information in an early project phase are reviewed. Using the information available in the planning and schematic design stage, the Framework is presented to estimate the environmental load in an early stage in the project. Developing an environmental load estimation model in accordance with the Framework presented in this study, it is expected that the environmental load in the initial project phase can be estimated more quickly and accurately.

  • PDF

BIM System Development for Conceptual Design and Pre-Feasibility Study of Cable-Stayed Bridge (BIM 기반 사장교의 개념설계 및 예가분석 시스템 개발)

  • Chun, Kyoung-Sik;Park, Won-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.7204-7210
    • /
    • 2015
  • This paper has developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous cable-bridge with 2-pylons. First of all, we'd analyzed the design information (structural design report, blueprint and quantity) of the existing cable-stayed bridges and derived the design variables of cable-stayed bridges. We developed the BIM wizard that generates a cable-stayed bridge model parametrically based on derived design variables. The principle material quantities of cable-stayed bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. Then, we can estimate the construction cost in relation to its quantities and unit cost of cable-stayed bridge. In a result, we have established the system that the construction cost can be estimated more specific than the conventional method (construction estimates per meter or square meter). We hereby will be able to review various alternatives as soon as possible in bidding process.

The Conceptual Cost Estimate Model on Preliminary Design Phase for RC Rahmen Bridge (RC라멘교의 기본설계단계 개략공사비 산정모델)

  • Kim, Byung-Soo;Kwon, Suk-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.111-120
    • /
    • 2009
  • The conceptual cost estimation used the construction project needs for confirm budget not only at the planning phase but also at the preliminary design phase of the construction project. Present, the conceptual cost estimation model have problems the rate of error is very large because the linear simple model calculate by use the cost of the unit meter or the unit square. This study development the model used grouping and the key quantity method, the mixed unit cost for solve problem of the very large rate of error. The result of this study reduced difference of between the real design construction cost therefor it expect that contribute to the client or the service company estimate budget of RC rahmen bridge.