• Title/Summary/Keyword: Quantity

Search Result 9,253, Processing Time 0.037 seconds

Determination of Economic Inventory Quantity under Probabilistic Demands and Cancellation of Orders in Production System with Two Different Production Speeds (이중생산속도를 가지는 생산시스템에서 확률적인 수요와 주문취소를 고려한 경제적 재고량 결정)

  • Lim, Si Yeong;Hur, Sun;Park, You-Jin
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.40 no.3
    • /
    • pp.313-320
    • /
    • 2014
  • We consider the problem to find economic inventory quantity of a single commodity under stochastic demands and order cancellation. In contrast to the traditional economic production quantity (EPQ) model, we assume that once the amount of inventory reaches to a predetermined level of quantity then the production is not halted but its production speed decreases until the inventory level drops to zero. We establish two probabilistic models representing the behaviors of both the high-production period and low-production period, respectively, and derive the relationship between the level of inventory and costs of production, cancellation, and holding, from which the quantity of economic inventory is obtained.

Basic Research on BIM-Based Quantity Take-off Guidelines

  • Yun, Seokheon;Kim, Sangchul
    • Architectural research
    • /
    • v.15 no.2
    • /
    • pp.103-109
    • /
    • 2013
  • Various types of building information should be linked to 3D model objects for their effective use by stakeholders. Because Building Information Modeling (BIM) based on 3D is used by different stakeholders, the created BIM need standard guidelines for each purpose, as, for example, for quantity take-off. Thus, this study was conducted to propose guidelines for BIM modeling for quantity take-off in the framework, especially, in the concrete and form. The proposed guidelines adopted each element of the BIM model based on an analysis of the problem of the general BIM model. Moreover, the usability and accuracy of the reinforced structure modeling guidelines were verified by comparing the quantity of the commercial estimation software and the modeling quantity using the proposed modeling guidelines.

A Study on Slide Way Deformation from High Frequency Heat Treatment by Finite Element Method (유한요소법을 이용한 고주파 열처리시 안내면 변형에 관한 연구)

  • 홍성오;조규재
    • Transactions of the Korean Society of Machine Tool Engineers
    • /
    • v.11 no.3
    • /
    • pp.57-64
    • /
    • 2002
  • Finite element program(ANSYS) estimated thermal deformation quantity in high frequency heat treatment process of a machine tool fred drive system slideway and apply deformation quantity in roughing process. Having processed the heat treatment minimizing methods of the quantity of deformation heat treatment process. Having done heat treatment with high frequency after taper processing with considering the existed heat treatment generating the quantity of deformation, existed quantity of deformation can be reduced down to 80%, consequently productivity and material saving can be achieved. When high frequency heat treatment finite element method estimated deformation quantity at difference temperature and time, it is progress at cost don and saved time.

A Study on a Procedure to Determine the Economic Incoming Quantity of Materials in Consideration of the Process Fraction Defectives (공정불량률(工程不良率)을 고려(考慮)한 자재납입량(資材納入量)의 결정(決定))

  • Lee, Hoe-Sik;Hwang, Ui-Cheol
    • Journal of Korean Society for Quality Management
    • /
    • v.18 no.1
    • /
    • pp.1-8
    • /
    • 1990
  • In this paper we present a procedure to determine the quantity of incoming materials when the nonconforming materials appear in the production process. We determined the total loss of materials $D_2$ due to fraction defectives in process and added this $D_2$ to the quantity of incoming materials $Q_0$ considered ingoing-outgoing quality level. The quantity of materials $Q_1$ as a result of this procedure should be an economic purchasing quantity and is a rectifying quantity of the EOQ determined in classical inventory model.

  • PDF

Consideration on the Creation of Construction Cost by Calculating the Quantity at the Planning Design Stage - Focusing on Construction Cost Management Vases and Work Methods - (초기 설계단계에서 개산 견적의 수량산출에 의한 건축공사비 작성에 대한 고찰 - 공사비 관리 사례 및 작업 방법을 중심으로 -)

  • Hyun, Dong-Myung;Jeon, SangHoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.329-330
    • /
    • 2021
  • The calculation of the correct construction value in the construction should be investigated after the quantity is calculated. In order to calculate the quantity requires a lot of cost and time, and the initial accurate quantity calculation is not possible. Therefore, in the planning step in order to successfully complete the project to demonstrate the practicality of the difference between the construction cost by the construction design by presenting a method for calculate the quantity through the estimate with the construction open, floor plan, surface view, section.

  • PDF

The Extraction Method of Spacial Element Cost based on the Quantity Take-Off and Bill of Quantity (건설공사의 수량산출서 및 산출내역서 기반 공간별/부위별 공사비 추출방법에 관한 연구)

  • Nam, Dong-hee;Kim, Hyung-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.232-233
    • /
    • 2021
  • As construction projects become larger and more complex in the construction environment, and as the Building Information Model(BIM) is technically introduced, the demand for construction costs in units of space is increasing. Cost estimating of spacial element can reduce the error in cost prediction method based on cost of work type and to utilize the construction cost data for each space in the design phase. The purpose of this study is to extract spatial statements by utilizing spacial information of quantitative statements based on items that are common elements of the Quantity Take-Off and Bill of Quantity.

  • PDF

ATTITUDES TOWARDS KNOWLEDGE SHARING AMONG QUANTITY SURVEYORS

  • Kherun Nita Ali;Md Asrul Nasid Masrom;Pow Yih Wen
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.567-574
    • /
    • 2011
  • The purpose of this paper is to identify factors that influence knowledge sharing and determine the attitudes of quantity surveyors towards knowledge sharing based on the factors. The analysis was based on an online questionnaire survey of Registered Quantity Surveyors from Selangor and Kuala Lumpur. Individualism and collectivism were identified as two major factors that influence attitude towards knowledge sharing. Indicators of individualism include individual attitude, competitiveness, care, incentives and rewards; while the indicators of collectivism are trust, social behaviors and motivation. The findings show that the level of attitudes towards knowledge sharing among quantity surveyors is generally high under enabling organizational environment. However, this is a cautious conclusion as the valid sample on which the analysis is based is relatively small. Willingness to share was found to be highest when incentives and rewards are involved as well as when there is a knowledge management system to promote continuous learning and sharing of knowledge.

  • PDF

A Stochastic Analysis of the Water Quality on the Basin of Soyang River with Discharge Variation (유량변동에 따른 소양강유역 수질의 통계학적 해석)

  • Choi, Han-Kyu;Baek, Kyung-Won;Choi, Yong-Mook;Choi, Jin-Woo
    • Journal of Industrial Technology
    • /
    • v.21 no.B
    • /
    • pp.233-240
    • /
    • 2001
  • This research was conducted with the aim of efficiently managing large scale of rivers such like Songyang-river through predicting water quality change with analyzing the characteristics of the flowing in nutrients and pollutants. The main result will be used as basic data for effectively operating reservoirs through controling water quality and quantity. The relationship between quantity of flow and water quality was analyzed and pollution loading into the basin was estimated. Three areas of Soyang-river upstream and one area of Suip-cheon in Yanggu-gun were selected as research sites. Flow and water quality were measured simultaneously. The relation between quantity of discharge and pollution concentration and between quantity of discharge and pollution loading were analyzed by statistical method, respectively. We provided a rating curve through measuring quantity of discharge(collecting quantity of discharge) and pollutograph and pollution loading curve through water quality data. Also, we analyzed the correlation between quantity of discharge per unit area and pollution loading per unit area in each basin. As resurt of this research, Buk-cheon spot revealed an excellent first grade water quality for the items including $BOD_5$, DO, and SS. The correlation coefficient between Buk-cheon spot's quantity of discharge and pollution loading was 0.896~0.996, showing the validity of analysis applying correlation curve formula of quantity of discharge and pollution loading in the same spot. Also, pollution loading per unit area of the items including $BOD_5$, COD, DO, SS, T-N, T-P increased as the area of basins get increased following the sequence of Buk-cheon, Suip-cheon, Naelin-cheon spots.

  • PDF

Effect of MgO addition in glass composition on the strength of zirconia-glass composites (지르코니아-유리복합체용 글래스의 조성에서 MgO의 함량 변화가 강도에 미치는 영향)

  • Lee, Kyu-Sun;Lee, Chang-Wan;Lee, Chae-Hyun
    • Journal of Technologic Dentistry
    • /
    • v.29 no.1
    • /
    • pp.23-34
    • /
    • 2007
  • The quantity of MgO in the Zirconia of 20wt% Frit has been varied and the sintering temperature has been differentiated to monitor the changes in the mechanical features. The rise of sintering temperature from 1100$^{\circ}C$ to 1300$^{\circ}C$ was followed by higher sintering density. And, at a sintering temperature, the increase of the quantity of MgO was followed by lower sintering density. The bending strength has been lowered as the quantity of MgO increases in the Zirconia of 20wt% Frit, which seems to be because the MgO functions as impurities degrading the mechanical features. In terms of micro-structure analysis, the pore has been greatly enlarged, while the density varied very little, when the MgO of 3wt% was added. The size of pore became smaller as the added quantity of MgO increased larger in the sequence of 5wt% and 7wt%. But, the pore-generating rate became higher as the added quantity of MgO increased in the sequence of 3wt%, 5wt% and 7wt%. Thus, it is possible to summarize that the small quantity of MgO, say, of 3wt%, promotes the grain growth, and the large quantity of MgO, say, of 7wt%, hinders the grain growth. Also, if the quantity of MgO exceeds some level, the MgO hinders substances from moving, which, ultimately, keeps blowholes from becoming enlarged or extinct, and makes pores small and dispersed in broad area. In conclusion, the study on the change in the size of pore shows that the larger the quantity of MgO is, the more the micro pores are, thereby degrading the mechanical features.

  • PDF

A Study on Automated Quantity Take-off Methods of Earth Works in Road Design using 3D Design Concept (3차원 설계를 통한 도로설계단계의 토공 자동물량 산정 방안에 관한 연구)

  • Cho, Myunhwan;Kim, Nakseok;Chae, Jae-Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.277-283
    • /
    • 2016
  • Recently, the interests in three-dimensional design and BIM(Building Information Modeling) are increasing in civil engineering sector and the researches about three-dimensional design and quantity take-off methods for civil engineering structures have been conducted. However, these studies are just carried out the 3D design and quantity calculation of civil structures on the road or railway such as bridges and tunnels. The study on the quantity take-off methods and the evaluation of calculated results on the earth works should be performed in more detail. Based on these backgrounds in mind, the study was conducted the three-dimensional road design and evaluated the quantity take-off results on the earth works using 3D calculation method(average end area method, prismoidal method and composit method). The calculated quantity from composit method showed about 5% error of measuring efficiency than the average end area method, and when reporting the quantity calculation of earth works, it is necessary to specify the calculation method using quantity take-off of earth works.