• 제목/요약/키워드: Quantitative risk assessment and management

Search Result 136, Processing Time 0.022 seconds

A Study on Risk Assessment and Risk Mitigation Measures of Liquefied Chlorine Leak (액화염소 누출의 위험도 분석 및 위험경감조치에 대한 연구)

  • Lee, Ju-Youn;Chon, Young-Woo;Hwang, Yong-Woo;Lee, Ik-Mo
    • Journal of the Korea Safety Management & Science
    • /
    • v.20 no.1
    • /
    • pp.1-9
    • /
    • 2018
  • As the chemical industry becomes more advanced, the awareness of chemical accidents is rising, and legal systems for chemical safety management are strengthened. In this study, quantitative risk assessment of liquid chlorine leak was conducted. Risk assessment was performed in the order of frequency analysis, consequence analysis, and risk calculation. The individual risk was presented in the form of contour lines. The social risk was expressed by the FN curve. The risk of day and night was in an unacceptable area, so it was required to mitigate risk. Therefore in-building, which could trap the pool, was selected as a risk mitigation measure. As a result of the cost benefit analysis, it was concluded that this measure should be reasonably implemented.

Development of A Quantitative Risk Assessment Model by BIM-based Risk Factor Extraction - Focusing on Falling Accidents - (BIM 기반 위험요소 도출을 통한 정량적 위험성 평가 모델 개발 - 떨어짐 사고를 중심으로 -)

  • Go, Huijea;Hyun, Jihun;Lee, Juhee;Ahn, Joseph
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.4
    • /
    • pp.15-25
    • /
    • 2022
  • As the incidence and mortality of serious disasters in the construction industry are the highest, various efforts are being made in Korea to reduce them. Among them, risk assessment is used as data for disaster reduction measures and evaluation of risk factors at the construction stage. However, the existing risk assessment involves the subjectivity of the performer and is vulnerable to the domestic construction site. This study established a DB classification system for risk assessment with the aim of early identification and pre-removal of risks by quantitatively deriving risk factors using BIM in the risk assessment field and presents a methodology for risk assessment using BIM. Through this, prior removal of risks increases the safety of construction workers and reduces additional costs in the field of safety management. In addition, since it can be applied to new construction methods, it improves the understanding of project participants and becomes a tool for communication. This study proposes a framework for deriving quantitative risks based on BIM, and will be used as a base technology in the field of risk assessment using BIM in the future.

Microbiological Risk Assessment for Milk and Dairy Products in Korea (우유 및 유제품의 안전성 평가를 위한 미생물학적 위해요소의 위해평가)

  • Kim, Hyoun-Wook;Han, Gi-Sung;Park, Beom-Young;Jeong, Seok-Geun;Kim, Hyeon-Shup;Oh, Mi-Hwa
    • Journal of Dairy Science and Biotechnology
    • /
    • v.29 no.2
    • /
    • pp.69-73
    • /
    • 2011
  • Food borne pathogens are a growing concern for human health and food safety throughout the world. Milk and dairy products are commonly associated with spoilage or contamination from a wide variety of physical, microbial, and chemical hazardous. Microbiological risk analysis consists of three components: risk assessment, risk management, and risk communication, and overall objective of this process is ultimately public health protection. The microbiological risk assessment is useful tool to evaluate food safety as it is based on a scientific approach. In addition risk assessment process includes quantitative estimation of the probability of occurrence of microbial hazards to evaluate more accurate human exposure. The aim of this study is to review the microbiological risk assessment on the prevalence of bacterial foodborne pathogens in milk and dairy products.

  • PDF

A Study on a Risk Assessment Method and Building Simulation for the Development of a Korean Integrated Disaster Evaluation Simulator (K-IDES) for High-rise Buildings

  • Kim, Tae-Young;Han, Gi-Sung;Kang, Boo-Seong;Lee, Kyung-Hoon
    • Architectural research
    • /
    • v.22 no.4
    • /
    • pp.105-112
    • /
    • 2020
  • The purpose of this study is to establish a method for assessing a building's risk against disaster, tentatively named the Korean integrated disaster evaluation simulator (K-IDES). Based on previous studies, FEMA's risk management series and FEMA IRVS are selected as case studies for developing a frame work of K-IDES, through the comparative analysis of domestic building design guides, codes, and special acts related to disasters, in order to develop a risk assessment methodology for quantitative results. The assessment method consists of a classification system and calculating risk, and a simulation applying the developed checklist in K-IDES to similar types of high-rise buildings will be conducted to validate its accuracy. The final goal is to systemize an integrated risk management in a high-rise building against disasters for the purpose of recognizing vulnerable areas from the beginning of the design process and reinforcing it from potential threats after construction.

Risk Assessment and Contingency Prediction considering Work Characteristics for Modular Plant Construction Projects (모듈러 플랜트의 업무특성을 고려한 위험 평가 및 예비비 예측)

  • Kang, Hyunwook;Kim, Jongwook;Kim, Yongsu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.81-89
    • /
    • 2018
  • The purpose of this study is to assess the risk and predict the contingency for modular plant construction projects. Considering the work characteristics of the modular plant, The adapted research method is that suggest models for assessment impact of risk and predict the contingency considering risk. Based on the proposed models, It is selected one modular plant construction project and assessment impact of risk factors and predicted the contingency. The results of this study are as follows: Assessment the probability of occurrence of risk factors and intensity of impact, and extract 15 important risk factors. These are classified as Engineering, Procurement, Fabrication, Transportation, Construction phases to consider the work characteristics of the modular plant. The predicted contingency is that 6.739%(Engineering 2.850%, Procurement 6.225%, Fabrication 6.211%, Transportation 4.165%, Construction 8.168%) to prepare the basic business expense. The model is used as a way to derive quantitative results in the decision-making process for risk management in construction projects.

Banding the World Together; The Global Growth of Control Banding and Qualitative Occupational Risk Management

  • Zalk, David M.;Heussen, Ga Henri
    • Safety and Health at Work
    • /
    • v.2 no.4
    • /
    • pp.375-379
    • /
    • 2011
  • Control Banding (CB) strategies to prevent work-related illness and injury for 2.5 billion workers without access to health and safety professionals has grown exponentially this last decade. CB originates from the pharmaceutical industry to control active pharmaceutical ingredients without a complete toxicological basis and therefore no occupational exposure limits. CB applications have broadened into chemicals in general - including new emerging risks like nanomaterials and recently into ergonomics and injury prevention. CB is an action-oriented qualitative risk assessment strategy offering solutions and control measures to users through "toolkits". Chemical CB toolkits are user-friendly approaches used to achieve workplace controls in the absence of firm toxicological and quantitative exposure information. The model (technical) validation of these toolkits is well described, however firm operational analyses (implementation aspects) are lacking. Consequentially, it is often not known if toolkit use leads to successful interventions at individual workplaces. This might lead to virtual safe workplaces without knowing if workers are truly protected. Upcoming international strategies from the World Health Organization Collaborating Centers request assistance in developing and evaluating action-oriented procedures for workplace risk assessment and control. It is expected that to fulfill this strategy's goals, CB approaches will continue its important growth in protecting workers.

Development of RBI Procedures and Implementation of a Software Based on API Code (III) - Quantitative Approach (API 기준에 근거한 RBI 절차 개발 및 소프트웨어의 구현 (III) - 정량적 접근법 -)

  • 송정수;심상훈;최송천;윤기봉
    • Journal of the Korean Society of Safety
    • /
    • v.18 no.1
    • /
    • pp.56-63
    • /
    • 2003
  • During the last decade, effort has been made f3r reducing maintenance cost for aged equipments and ensuring safety, efficiency and profitability of petrochemical and refinery plants. Hence, it was required to develop advanced methods which meet this need. RBI(Risk Based Inspection) methodology is one of the most promising technology satisfying the requirements in the field of integrity management. In this study, a quantitative assessment algorithm fir RBI based on the API 581 code was reconstructed for developing an RBI software. The user-friendly realRBI software is developed with a module for evaluating quantitative risk md financial risk using the potential consequence and the likelihood. Also, inspection planning module for inspection time and inspection method are included in it.

Stock assessment by ecosystem risk analysis of large purse seine fishery in the southern sea of Korea (한국 남해안 대형선망어업의 생태계 위험도 분석에 의한 자원평가 연구)

  • Seo, Young-Il;Zhang, Chang-Ik;Lee, Jae-Bong;Cha, Hyung-Kee
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.47 no.4
    • /
    • pp.369-389
    • /
    • 2011
  • Changes in ecosystem risks were evaluated using the ecosystem-based fisheries assessment (EBFA) approach of Zhang et al. (2009, 2010) and the comprehensive ecosystem-based fisheries management (EBFM) plan was made for the southern sea of Korea in this study. The risk assessment of the southern sea ecosystem was conducted by establishing ecosystem management objectives and by estimating risk scores (RS) for indicators. To conduct this analysis a number of indicators and their reference points for assessing these risk scores were developed in this study. The number of indicators in the risk analysis was 28 for the quantitative tier 1 analysis and 30 for the qualitative tier 2 analysis. The objective risk index (ORI), species risk index (SRI) and fisheries risk index (FRI) were calculated from the risk scores. Comparing the past (1988) and the current (2008) status of fisheries resources, management implications were discussed. The fishery risk index (FRI) of large purse seine fishery in the southern sea of Korea decreased substantially from 0.972 in 1988 to 0.883 in 2008, and improvement in the management of fisheries operated in the southern sea of Korea.

A Study on the Quantitative Risk Assessment of Hydrogen-CNG Complex Refueling Station (수소-CNG 복합충전소 정량적 위험성평가에 관한 연구)

  • Kang, Seung-Kyu;Huh, Yun-Sil
    • Journal of the Korean Institute of Gas
    • /
    • v.24 no.1
    • /
    • pp.41-48
    • /
    • 2020
  • This study performed a quantitative risk assessment for hydrogen-CNG complex refueling stations. Individual and societal risks were calculated by deriving accident scenarios that could occur at hydrogen and CNG refueling stations and by considering the frequency of accidents occurring for each scenario. As a result of the risk assessment, societal risk levels were within the acceptable range. However, individual risk has occurred outside the allowable range in some areas. To identify and manage risk components, high risk components were discovered through risk contribution analysis. High risks at the hydrogen-CNG complex refueling station were large leakage from CNG storage containers, compressors, and control panels. The sum of these risks contributed to approximately 88% of the overall risk of the fueling station. Therefore, periodic and intensive safety management should be performed for these high-risk elements.