• Title/Summary/Keyword: Quality assurance/quality control

Search Result 323, Processing Time 0.058 seconds

A study on the Improvement of Facility-Wide Quality Assurance Technique for Quality Management of Military Product (군수품 품질경영 효율화를 위한 사업장 단위 품질 보증 개선 방안 연구)

  • Kang, In-Myun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.12
    • /
    • pp.613-619
    • /
    • 2017
  • Recently, the development and production of weapons systems for military products have been increasing. Therefore, there is a need for an efficient quality control method suitable for limited resources and manpower for the manufactured military products. Military munitions are characteristically developed and produced as business contract units. In addition, business and quality control are done by contract. For this reason, many contracts are concluded in one producer and similar products are often produced. Business and quality control also require extensive manpower and effort. If a company produces several similar products, a more efficient management approach is required. This study therefore examines these problems in an attempt to present solutions by analyzing the types of munitions contracts and the characteristics of products produced by one company. Based on the results, a method is proposed to manage the contract-specific management methods by company, that is, by business site. The method is applied to an engine manufacturing company and the integrated management plan is verified and its effectiveness confirmed. The effect of facility-wide method was a reduction of QA manpower and an improvement in maintaining quality assurance and stability through management of the workforce and contract grouping method.

An Application of the Super Flowing Concrete in Site (초유동 콘크리트의 현장시공)

  • 권영호;이상수;김동석;김진근;박칠림
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1996.04a
    • /
    • pp.402-407
    • /
    • 1996
  • In this paper, we described the basic elements(flowability, fillingability, elapsed time, pumpability, no-vibrating effects, and etc.) required for the application and quality control of the super flowing concrete (SFC) in construction site. Also, after investigating characteristics of SFC through various experiments, SFC were placed in the reaction wall of large scale structural laboratory in Deawoo Insititute of Construction Technology. As the result of this project, the developed SFC showed high flowability and self-filingability good enough for the requirement. Furthermore, quality control and assurance of the no-vibrating concrete in actual site was verified by various testing.

  • PDF

A Study on Implementing the QC Tools for Systematic Problem-Solving (문제해결을 위한 QC 도구의 체계적 활용방안에 대한 연구)

  • Yun, Tae-Hong;Kim, Chang-Yeol;Byun, Jai-Hyun
    • Journal of Korean Society for Quality Management
    • /
    • v.37 no.2
    • /
    • pp.68-77
    • /
    • 2009
  • There are many quality control(QC) tools useful for solving quality problems. In this paper, QC 7 tools, new QC 7 tools, and other quality tools are first compared with respect to their frequency of use. We suggest an integrated problem-solving procedure to systematically deal with various quality problems. For each step a streamlined flow chart is presented to help the practitioners to adopt relevant tools depending on certain situations they face. The procedure will help quality practitioners solve field quality problems.

Good manufacturing practice of radiopharmaceuticals in Korea

  • Oh, Seung Jun
    • Journal of Radiopharmaceuticals and Molecular Probes
    • /
    • v.1 no.2
    • /
    • pp.98-103
    • /
    • 2015
  • Good manufacturing Practice (GMP) regulation for diagnostic and therapeutic radiopharmaceuticals was prepared at 2014. The mandatory GMP regulation becomes effective on $1^{st}$, July 2015,with two years of grace periods. Korean radiopharmaceuticals GMP regulation was consisted of quality management, personnel, premise and facility, documentation, production, quality control and self-audit and they have a very similar structure to European Union and PIC/S GMP regulation. Here, we describe detailed description of GMP regulation each part and application to radiopharmaceuticals production. And we also compare Korea, Japan and USA radiopharmaceuticals GMP regulation. GMP is a method to maintain quality of radiopharmaceuticals in daily production and it must be embedded on the manufacturing operation and management.

Development and Reliability Verification of Quality Control System for Compaction Grouting Method (컴팩션 그라우팅 공법의 품질관리 시스템 개발 및 신뢰성 검증)

  • Seo, Seok-Hyun;Lee, Jung-Sang;Jung, Eui-Youp;Park, Sang-Yeong;Lee, Hyo-Bum
    • Journal of the Korean Geosynthetics Society
    • /
    • v.19 no.4
    • /
    • pp.11-20
    • /
    • 2020
  • This study introduced the compact grouting method that can be used for improving soft ground and restoring buildings with unequal subsidence. The pump used in the traditional compact grouting method is a system that injects one hole each, which reduces the construction efficiency, and the analog injection method manually manages the construction by field workers, making it difficult to manage consistent quality. Pump and quality control system were developed to solve problems in existing construction. Since field supervisor determines amount of injected materials by using analog equipment and controls manually, it is difficult to manage consistent quality of construction. Therefore, the quality control system was developed in order to solve that problem. The quality control system consists of automatic mixing system of injection materials, multiple simultaneous injection pumps, and injection management monitoring system. Performance of the quality control system was verified through on-site testing, and ground improvement performance was verified through quality testing after testing and testing of the compact grouting method. Therefore, it is expected that the integrated quality control system developed will improve the quality assurance and efficiency and stability of construction at sites where construction and quality verification are difficult.

Actual Condition of Quality Control of X-ray Imaging System in Primary Care Institution: focused on Gwangju Metropolitan City (1차 의료기관의 엑스선 발생장치 정도관리에 관한 현황조사:광주광역시 지역을 중심으로)

  • Dong, Kyung-Rae;Lee, Seun-Joo;Kweon, Dae-Cheol;Goo, Eun-Hoe;Jung, Jae-Eun;Lee, Kyu-Su
    • Journal of Radiation Protection and Research
    • /
    • v.35 no.1
    • /
    • pp.34-42
    • /
    • 2010
  • With the expanded use of radiation in modern medical practices, the most important issue in regards to efforts to reduce individual exposure dose is quality assurance. Therefore in order to study the present condition of quality assurance, the Gwangju Metropolitan City area was divided into five districts each containing ten hospitals. Four experiments were conducted: a reproducibility experiment for kVp, mA, and examination time (sec) intensity of illumination; half-value layer (HVL) measurement; and beam perpendicularity test matching experiment. The tube voltage reproducibility experiment for all fifty hospitals resulted in a 95.33% passing rate and mA and examination time both resulted in a 77.0% passing rate. The passing rate for intensity of illumination was 86.0% and 52.0% for HVL, which was the lowest passing rate of all four factors. For the beam perpendicularity test matching experiment, generally the central flux is matched to within $1.5^{\circ}$. Of all fifty hospitals 30.0% were beyond $3^{\circ}$. The results of the survey showed that 58% responded that they knew about quality assurance cycle. All fifty respondents stated that they have not received any training in regards to quality assurance at their current place of employment. Although quality assurance is making relative progress, the most urgent issue is awareness of the importance of quality assurance. Therefore, the implementation of professional training focusing on safety management and accurate quality assurance of radiation will reduce the exposure to radiation for radiologists and patients and higher quality imaging using less dosage will also be possible.

A Case Study of Quality Assurance and Control for the Soil Environmental Assessment in Abandoned Mine (광산지역 토양정밀조사 정도관리(QA/QC) 사례 연구)

  • Ji, Won Hyun;Kim, Jong Keun
    • Journal of Soil and Groundwater Environment
    • /
    • v.19 no.3
    • /
    • pp.134-141
    • /
    • 2014
  • A testing inspection is one of the important in the industry, owing to determine the reliability and directivity of testing inspection results. Therefore, the quality assurance and quality control (QA/QC) work which performed by personnel not directly in the inventory compilation development, in testing inspection must be thoroughly considered. Some agencies for environmental test inspection, they sometimes misunderstood that the QA/QC was ended with proficiency testing performance and on-site assessment by a director. Thus, results were often calculated without QA/QC work by self manual when conducting test. The objective of this study was to improve reliability of testing and inspection agency through the QA/QC case study which basically performed to raising reliability of testing and inspection agency. In this study, it increased reliability of result by verifying calibration curve (IC, ICV, CCV), blank, accuracy (LCS, MS) and precision as QA/QC performance, while performing investigation of soil contamination in mining areas. This study suggests that reliability establishing method of test result and management method of analysis process, through the QA/QC instance of testing agency.

Evaluation of Image for Phantom according to Normalization, Well Counter Correction in PET-CT (PET-CT Normalization, Well Counter Correction에 따른 팬텀을 이용한 영상 평가)

  • Choong-Woon Lee;Yeon-Wook You;Jong-Woon Mun;Yun-Cheol Kim
    • The Korean Journal of Nuclear Medicine Technology
    • /
    • v.27 no.1
    • /
    • pp.47-54
    • /
    • 2023
  • Purpose PET-CT imaging require an appropriate quality assurance system to achieve high efficiency and reliability. Quality control is essential for improving the quality of care and patient safety. Currently, there are performance evaluation methods of UN2-1994 and UN2-2001 proposed by NEMA and IEC for PET-CT image evaluation. In this study, we compare phantom images with the same experiments before and after PET-CT 3D normalization and well counter correction and evaluate the usefulness of quality control. Materials and methods Discovery 690 (General Electric Healthcare, USA) PET-CT equiptment was used to perform 3D normalization and well counter correction as recommended by GE Healthcare. Based on the recovery coefficients for the six spheres of the NEMA IEC Body Phantom recommended by the EARL. 20kBq/㎖ of 18F was injected into the sphere of the phantom and 2kBq/㎖ of 18F was injected into the body of phantom. PET-CT scan was performed with a radioacitivity ratio of 10:1. Images were reconstructed by appliying TOF+PSF+TOF, OSEM+PSF, OSEM and Gaussian filter 4.0, 4.5, 5.0, 5.5, 6.0, 6,5 mm with matrix size 128×128, slice thickness 3.75 mm, iteration 2, subset 16 conditions. The PET image was attenuation corrected using the CT images and analyzed using software program AW 4.7 (General Electric Healthcare, USA). The ROI was set to fit 6 spheres in the CT image, RC (Recovery Coefficient) was measured after fusion of PET and CT. Statistical analysis was performed wilcoxon signed rank test using R. Results Overall, after the quality control items were performed, the recovery coefficient of the phantom image increased and measured. Recovery coefficient according to the image reconstruction increased in the order TOF+PSF, TOF, OSEM+PSF, before and after quality control, RCmax increased by OSEM 0.13, OSEM+PSF 0.16, TOF 0.16, TOF+PSF 0.15 and RCmean increased by OSEM 0.09, OSEM+PSF 0.09, TOF 0.106, TOF+PSF 0.10. Both groups showed a statistically significant difference in Wilcoxon signed rank test results (P value<0.001). Conclusion PET-CT system require quality assurance to achieve high efficiency and reliability. Standardized intervals and procedures should be followed for quality control. We hope that this study will be a good opportunity to think about the importance of quality control in PET-CT

  • PDF

Recent Progress of the DUPIC Fuel Fabrication in Korea

  • Lee, J.W.;Kim, W.K.;Lee, Jae-W.;Park, G.I.;YANG, M.S.
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2004.02a
    • /
    • pp.170-181
    • /
    • 2004
  • DUPIC powder and pellets were successfully fabricated in accordance with the quality assurance program described in the Quality Assurance Manual for DUPIC fuel fabrication, which was developed on the basis of the CAN3-Z299.2-85 standard. This manual describes the quality management system applicable to the activities performed for DUPIC fuel fabrication. It covers the work processes, policies and procedures used for planning, executing, and verifying the work carried out for DUPIC fuel fabrication. It is important that a Quality Program is in place before the fabrication of the fuel for irradiation testing. In order to qualify the DUPIC pellet manufacturing processes, 3 series of experiments for the pre-qualification and 3 series for the qualification were performed. In these experiments, the optimum process conditions were established. Then, under the control of the QA program, 8 series of production runs were performed to make the qualified DUPIC pellets in a batch size of 1 kg. In these production runs, DUPIC fuel pellets satisfying the standard CANDU fuel pellet specifications could be successfully produced.

  • PDF

An Objective method of risk assessment based on RAM analysis for warship (함정 분야의 RAM분석 기반 위험평가 방안)

  • Beak, Yong-Kawn;Kang, Byoung-Soo;Jo, Kwan-Jun
    • Journal of Korean Society for Quality Management
    • /
    • v.43 no.4
    • /
    • pp.511-520
    • /
    • 2015
  • Purpose: This study suggests a method of risk assessment based on RAM analysis in order to reduce the subjectivity. Methods: RAM analysis is used to assessment risk consequence(RC) and risk likelihood(RL). Result: The calculated result of the product, which has higher risk assessment, shows lower MTBF system. Conclusion: Risk assessment based on objective database will provide objectivity and effective quality control.