• Title/Summary/Keyword: Quality Maintenance

Search Result 1,821, Processing Time 0.031 seconds

A Study on the Outsourcing of Aircraft Maintenance Contracts

  • Cho, Kyung Rak
    • Journal of Aerospace System Engineering
    • /
    • v.15 no.6
    • /
    • pp.66-71
    • /
    • 2021
  • With the exception of some large domestic airlines with adequate maintenance capability, most low-cost and small airlines do not have the facilities, equipment/tools, or manpower to perform periodic inspections over "C check." They are repaired according to maintenance programs specified by manufacturers. The outsourcing (domestic or overseas) of maintenance contracts is thus crucial to achieve good quality service at low cost, and these contracts therefore need to be signed with a full understanding of what is to be expected. This study aims to determine the requirements to be considered prior to finalizing such contracts.

Optimal Preventive Maintenance Policy with Cost-dependent Improvement Factor (비용 종속적인 개선지수를 고려한 최적 예방보전 정책)

  • Hong, Seok-Soo;Park, Jong-Hun;Lie, Chang-Hoon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.36 no.2
    • /
    • pp.108-116
    • /
    • 2010
  • The maintenance of a deteriorating system is often imperfect. Previous studies have shown that the imperfect preventive maintenance (PM) can reduce the wear out and aging effects of deteriorating systems to a certain level between the conditions of as good as new and as bad as old. In this paper, we employ the concept of the improvement factor in investigating two optimal PM policies; failure limit policy and periodic PM policy. We redefine the improvement factor model as a function of the cost of PM, using this concept, we derive the conditions of optimal PM policies and formulate expressions to compute the expected cost rate. Based on this information, the determination of the maintenance policies which minimize the cost rate is examined. Numerical examples for the Weibull distribution case are also given.

Applicability of Statistical Evaluation to Power Quality Analysis (통계적 방법을 이용한 전력품질 관리방안)

  • Cho, Soo-Hwan;Jang, Gil-Soo;Kwon, Sae-Hyuk;Park, Sang-Ho;Jeon, Young-Soo;Kwak, No-Hong
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.22-24
    • /
    • 2006
  • The installations of power quality monitoring system have increased drastically over the past several decades. These systems have been effectively used to monitor, analyze and diagnose the conditions of power system, and furthermore can be used to improve the present asset maintenance policy, scheduled (time-based) method, into the advanced, cost-effective and labor-effective maintenance methods, such as condition-based maintenance, predictive maintenance and reliability centered maintenance. As an approach to this, this paper introduces the statistical methods, three kinds of control charts (Shewhart chart, CUSUM chart and EWMA chart), and discusses the applicability of these methods to recognize the changing trends of power quality indices and to estimate the system's condition, using Matlab.

  • PDF

A study on Measurement and Improvement of Indoor Air Quality in Dental Clinic

  • Choi, Mi-Suk;Ji, Dong-Ha
    • Journal of the Korea Society of Computer and Information
    • /
    • v.23 no.11
    • /
    • pp.143-149
    • /
    • 2018
  • The purpose of this study is to propose a management method to maintain the pleasant indoor air quality of the dental clinic by measuring and analyzing the indoor air quality of the dental clinic. The measurement was conducted in two rooms, a lobby where many residents stay in the reception room for waiting for medical treatment, and a VIP room where treatment activities are mainly performed. Measurement items are Temperature, Humidity, $CO_2$, CO, $NO_2$, $CH_2O$, VOC, $PM_{10}$ and measurement were taken on April 27, 2018. As a result of analyzing the temperature and humidity of the dental clinic, it was analyzed that the average indoor temperature was maintained at $25^{\circ}C$ and the humidity was kept at around 50%, maintaining proper indoor temperature and humidity environment. $CO_2$ was 855ppm in the VIP Room, which satisfied the maintenance standard. In the case of the lobby, it was analyzed to be 1,160ppm, which exceeded the maintenance standard and it is judged that the carbon dioxide generated by the respiration of the people staying in the lobby is the main reason. The mean concentration of formaldehyde in the VIP room was analyzed as $436{\mu}g/m^3$, exceeding the maintenance standard, and $2,100{\mu}g/m^3$ for the VOC exceeded the recommended standard. It was analyzed that the concentration was relatively higher due to the use of disinfectant and other drugs. The mean concentration of PM-10 in the lobby was analyzed as $65{\mu}g/m^3$ and it was analyzed that it satisfied the maintenance standard. To maintain a pleasant indoor air quality in a dental clinic it is necessary to minimize the effects of formaldehyde, VOC, $CO_2$ in the VIP rooms and lobby. For this purpose, the entire ventilation system and air purification system of the dental clinic should be installed. In case of the VIP room, local exhaust ventilation should be installed and workers should wear personal protective equipment.

Study of Reliability Analysis Based Power Generation Facilities Maintenance System - Focused on Continuous Ship Unloader - (신뢰성 분석 기반 발전설비 점검계획 수립 시스템 연구- 석탄 하역기를 중심으로 -)

  • Hwang Seong Hwan;Kim Yu Rim;Kang Sung Woo
    • Journal of Korean Society for Quality Management
    • /
    • v.51 no.2
    • /
    • pp.315-327
    • /
    • 2023
  • Purpose: Recently, research has continued to predict the time of failure of the facility through measurement data obtained by attaching a sensor to the facility. However, depending on the facility, it may be difficult to attach a sensor. The purpose of this study is to propose a power generation maintenance plan system based on failure record data obtained from Continuous Ship Unloader, one of the facilities that is difficult to attach sensors. Methods: This study uses data collected from 2012 to 2022 from the 'CSU-1B' model among Continuous Ship Unloader operated by Korea Midland Power Co., LTD. By fitting fault record data to the Weibull distribution, appropriate maintenance cycles and ranges for each target facility subsystem are derived. In addition, maintenance group between subsystems is selected through Euclidean distance, a metric often used for time series data similarity. Through this, a system for establishing an maintenance plan for power generation facilities is proposed. Results: The results of this study are as follows. For the 17 subsystems of the Continuous Ship Unloader, proper maintenance cycles and ranges were determined, and a total of four maintenance groups were chosen. This resulted in the creation of an power generation maintenance plan system and the establishment of an maintenance plan. Conclusion: This study is a case study of power generation facilities. We proposed a maintenance plan system for Continuous Ship Unloader among power generation facilities.

Reliability Analysis for Decoy using Maintenance Data (정비 데이터를 이용한 기만체계 신뢰도 분석)

  • Gwak, Hye-Rim;Hong, Seok-Jin;Jang, Min-Ki
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.10
    • /
    • pp.82-88
    • /
    • 2018
  • The decoy defensive weapon system is a one-shot system. Reliability is maintained through periodic inspection and high reliability is required to confirm whether or not the functioning is normal after launch. The maintenance cycle of a decoy was set up without target reliability and reliability prediction during the development period. However, the number of operations in the military has been increasing, necessitating the optimization of the maintenance cycle. Reliability is analyzed using the maintenance data of a decoy operated for several decades and the optimal maintenance cycle is suggested. In chapter 2, data collection and classification methods are presented and analysis methodology is briefly introduced. In chapter 3, the data distribution analysis and fitness verification confirmed that applying the Weibull distribution is the most suitable for the maintenance data of the decoy. In chapter 4, we present the analysis result of percentile, survival probability and MTBF and the optimal maintenance cycle was derived from the reliability analysis. Finally, we suggest the application methods for this paper in the future.

Update on the Evidence Regarding Maintenance Therapy

  • Lee, Jeong Eun;Chung, Chae-Uk
    • Tuberculosis and Respiratory Diseases
    • /
    • v.76 no.1
    • /
    • pp.1-7
    • /
    • 2014
  • Maintenance therapy has emerged as a novel therapeutic paradigm for advanced non-small-cell lung cancer (NSCLC). Maintenance therapy that aims to sustain a clinically favorable state after first-line chemotherapy has two strategies. Switch maintenance therapy entails switching to a new and non-cross-resistant agent in an alternating or sequential manner, on completion of first-line chemotherapy. Continuous maintenance therapy keeps ongoing administration of a component of the current regimen after four to six cycles of chemotherapy, if there is a stable disease, or better response. Both maintenance therapies can be continued, until disease progression. The potential evidence regarding maintenance therapy includes providing the opportunity to receive additional treatment, through sustaining tumor shrinkage, and delayed emergence of tumor-related symptom. Thus far, debates over the parameters used to predict the effectiveness of maintenance therapy, financial burden, and uncertainty of improving the quality of life exist. Despite many debates, maintenance therapy, which is currently recommended, has been disclosed to be beneficial.

Improving Maintenance Management Practices for Building Facility

  • Ismail, Zul-Atfi
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.21-32
    • /
    • 2014
  • The practiced conventional methods for maintenance management in Malaysian Polytechnic faced many issues due to poor service delivery, inadequate finance, poor maintenance plan and maintenance backlogs. The purpose of this study is to improve the conventional method practices which tend to be ineffective in Malaysian Polytechnic. The case studies were conducted with eight Polytechnics and are selected based on conventional method practices and its major problems. There are around 32 Polytechnics in Malaysia and almost are using conventional methods. The number is considered very big indicating that the use of modern Information and Communication Technology (ICT) is still very limited compared to other institutions of higher learning in Malaysia. The overall findings of this research indicated; poor service delivery, inadequate financial, poor maintenance planning and maintenance backlogs. There is also need to overcome less man power competencies of maintenance management practices which existed with all eight Polytechnics. The proposed system is intended to be used for maintenance management practices at Malaysian Polytechnics in order to provide high-quality of building facility with safe and healthy environments.

A Study on the Efficient Operation of Automated Teller Machine(ATM) Maintenance Using Simulation (시뮬레이션을 이용한 금융 ATM기 유지보수의 효율적 운영에 관한 연구)

  • Yu, Hyeung-Keun;Lee, Kang-Won
    • Korean Management Science Review
    • /
    • v.28 no.1
    • /
    • pp.107-116
    • /
    • 2011
  • The automated teller machine (ATM) is developed as a system to provide customers with an easy deposit and withdrawal of their money without time restriction and be served for 24 hours. Today, ATM is come up to the level of an unmanned branch. The automatic financing system is developed as an essential one for dealing with the rationalization of management and the globalization of financing in order to improve the efficiency of financial management work and increase the customer service quality. With reducing the operational cost of financial organizations through the efficient maintenance operation of ATM and increasing the service quality through the maximization of its processing efficiency, this study is to draw the scheme to ensure the competitiveness among the finance companies. The importance of ATM is highly recognized as the utilization of ATM is increased and the processing function is extended, but ATM is quite vulnerable to the malfunction occurred during the nighttime after banking hours. The ATM maintenance is done through consignment to the specialized maintenance company. The efficient operation of ATM maintenance work is important to the satisfaction of customer using ATM in the nighttime.