• Title/Summary/Keyword: Quality Maintenance

Search Result 1,832, Processing Time 0.025 seconds

A Study on the Improvement of Building Maintenance System - Focusing on Comparison with Japanese Case - (건축물 유지관리제도 개선방안 연구 - 한국과 일본의 유지관리 운영실태 비교분석 -)

  • Yoon, Hyo-Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.3
    • /
    • pp.737-745
    • /
    • 2015
  • The purpose of this study is to clarify the challenges and suggest regulatory improvement strategy by investigating the Japanese building maintenance system which had been conducted for decades. The efficiency and problems of the current building maintenance system of Korea are analyzed by stake holders and purpose of management. The results show that several strategies are important to improve the quality of building maintenance. They include check list focusing on the purpose of maintenance, efficient and fair criteria, rational checking period considering owner's budget, cooperation with professionals in facilities, and promotion of professional companies participation. The results imply that the challenges should be solved systematically rather than individually.

Case Studies of a Performance-Based Contract for National Highway Pavement Maintenance (성능보증제도를 적용한 일반국도 유지보수공사 시범사업)

  • Lim, Jaekyu;Kim, Yongjoo;Kim, Myeongil;Lee, Jaejun
    • International Journal of Highway Engineering
    • /
    • v.20 no.1
    • /
    • pp.1-8
    • /
    • 2018
  • PURPOSES : Case studies of an asphalt-overlay project with a performance-based contract method were conducted on a national highway in Korea to evaluate the effect of the method on asphalt pavement maintenance. This study evaluated the procedure of the performance-based contract method. METHODS : In this study, an asphalt-pavement maintenance project for a national highway was assessed with a performance-based contract to investigate the advantage of the new contract procedures. This is the first trial applying the performance-based contract to a pavement-rehabilitation project in Korea. In the four case studies, the warranty period of the performance-based contract was designed for seven years. The research team monitored the construction site to compare the normal contract method with the performance-based contract method. The case studies' project sites were investigated after the end of the construction. RESULTS : Based on the limited case studies, the performance-based contract method could extend the service life of the asphalt pavement and reduce the pavement-maintenance budget because the quality control was well managed by the contractors. However, a few construction laws would be necessary to apply the performance-based contract method in the future. CONCLUSIONS : Using the performance-based contract, the construction company made great efforts to guarantee the warranty period and to apply the optimal maintenance method, based on the pavement distress condition. The contractor and the agency would need to understand the new performance-based contract system for it to be activated. Therefore, a proper education program for the performance-based contract system would be needed to educate the stakeholders regarding the procedures and their effects on the pavement management and maintenance.

stimation of River Maintenance Water in the Geum River Watershed (금강유역의 하천유지유량 산정)

  • 안상진;김종섭
    • Water for future
    • /
    • v.24 no.1
    • /
    • pp.83-92
    • /
    • 1991
  • The purpose of this paper is to estimate river maintenance water of the main gauging stations in Geum river watershed. The estimation methods of river maintenance water are classified into two categories : views of supply and demand. The definition of river main-tenance water in this paper, is the maximum value between mean drought flow and environmental conserving flow. In order to estimate river maintenance water, the mean drought flow estimated at the upstream of the Daecheong Dam but the downstream of the Daecheong Dam estimated mean drought flow and water quality control flow use of QUAL2E Model. In result, a mean drought flow showed large value at the Gong ju and Gyu am station as the downstream of the Daecheong Dam. The river maintenance water is 33.82$m^3$/sec at the Gong ju station, 51.51$m^3$/sec at the Gyu am station. Therefore, an estimation of the river maintenance water in the Geum River watershed concluded suitability which is determined mean drought flow.

  • PDF

Development of the Tool for Software Re-engineering and Maintenance (소프트웨어 재공학과 유지보수 지원을 위한 툴의 개발)

  • Kim, Haeng-Gon;Hwang, Seon-Myeong
    • The Transactions of the Korea Information Processing Society
    • /
    • v.1 no.3
    • /
    • pp.299-310
    • /
    • 1994
  • Re-engineering tools can substantially increase software maintenance productivity and the quality of maintenance work. Re-engineering usually involves changing the form(e.g.changining objects names and definitions, restructuring process logic) of a program. In this paper, we describe the design and implementation of InMaC++ that is a software tool oriented towards maintenance of C++ object oriented programs. With InMaC++, programms can be displayed and edited in two forms : as the code and as the diagram InMaC++ also contains transformations in both directions, i,e. from code to diagram and from diagram to skeletons of code. Hence, it is suitable for re-engineering and maintenance of existing code. Specially designed browsers implement the graphical interface. InMaC++ contains a database that is based on a simple but effective data model of InMaC++ programs. The model contains only four object classes and three relations, which makes the tool small, and easy to implement and use. A simple query language allows browsing through the database.

  • PDF

Development of Improved Process Allocation Method in Process Industry (장치산업에서의 개선된 공정할당방법 개발)

  • 김종열;강창욱
    • Journal of Korean Society for Quality Management
    • /
    • v.28 no.3
    • /
    • pp.91-103
    • /
    • 2000
  • It is very important to rationally allocate manufacturing processes because customer's needs are being various, and product life cycle in the market Is being shortened. The process allocation is needed before making process control plan and is mostly being done by the field experience or intuition of machine operator, process engineer and/or maintenance technician. Therefore, a modified allocation method using the process variation is proposed. This paper presents the result of comparative studies between current method and the proposed one.

  • PDF

Preventive Replacement Policy with the Number of General Repairs (일반수리회수에 의한 장비 교환 정책)

  • 김용필;윤덕금
    • Journal of Korean Society for Quality Management
    • /
    • v.28 no.3
    • /
    • pp.11-17
    • /
    • 2000
  • This paper presents a model for determining the optimal number of general repairs and supplementary input cost limit rate in addition to minimal repair cost rate to implement preventive maintenance. The basic concept parallels the periodic replacement model with minimal repair at failure introduced by Barlow and Hunter(1960) and Park(1979), only difference being the replacement signalled by the number of previous general repairs performed on the system. A general repair brings the state of the system to a certain better state than before repaired. Numerical examples are provided.

  • PDF

Dynamic Progrmming Application in Determining the Optimal Replacement Time of Equipment (동적계획에 의한 장비최적교체시기 결정)

  • Jeong, Hyeon-Tae
    • Journal of Korean Society for Quality Management
    • /
    • v.14 no.1
    • /
    • pp.61-66
    • /
    • 1986
  • Many papers have suggested various models how to decide an optimal time for replacing equipment. In this study, Dynamic Programming is applied to establish a model of replacing equipment and a new algorithm is developed for computerization to meet the increased number of variables. It is possible to predict the real situation with higher accuracy by employing the proposed model including more variables such as planning horizon, original cost, salvage value, decreasing rate, operating and maintenance costs, increasing rate, and so on.

  • PDF

A Note on Improving Reliability in the Development of Weapon Systems (무기체계 개발단계에서 신뢰도 향상방안)

  • Choi, Chung-Hyun;Park, Sang-Eun
    • Journal of Applied Reliability
    • /
    • v.15 no.1
    • /
    • pp.1-5
    • /
    • 2015
  • This note suggests three approaches to improve reliability in developing weapon systems. The high complexity of the weapon systems make it hard to analyze and predict of those reliability. Current situations of the reliability have been reviewed in terms of logistics support analysis (LSA), warranty policy, maintenance and development. Three suggestions are notified to improve the reliability considering the complexity of the weapon systems.

English-Korean Transfer Based on Patterns and Examples (패턴 및 예문에 기반한 영한 변환)

  • 이기영;김한우
    • Proceedings of the IEEK Conference
    • /
    • 1999.06a
    • /
    • pp.997-1000
    • /
    • 1999
  • Conventional rule-based approaches have some problems caused by rule maintenance. Also they have some limitations to get the high quality translation results. This paper presents new English-Korean transfer approach that uses patterns and examples on limited domains. The use of patterns and examples can resolve the ambiguities and give high quality of MT Proposed approach can be applied in various NLP related area. Experimental results with a test corpus are discussed.

  • PDF

Performance Evaluation of Computed Tomographic Equipment (CT장치의 성능평가에 관한 연구)

  • Han Dong Kyoon;Kim Moon Chan;Yang Han Joon;Ko Shin Kwan
    • Journal of The Korean Radiological Technologist Association
    • /
    • v.27 no.2
    • /
    • pp.66-85
    • /
    • 2001
  • In medical equipments as complex as a computed tomographic equipment, routine quality control procedures are essential to the detection of small pathologic change in soft tissue as well as and the maintenance of optimal image quality. This study was condu

  • PDF