• 제목/요약/키워드: Pumped Storage Power Station

검색결과 7건 처리시간 0.018초

청송 양수발전소 시공사례 (A Case Study on the Chungsong Pumped-storage power station Construction)

  • 홍창수;이현구;도종열
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 추계 학술발표회
    • /
    • pp.169-178
    • /
    • 2006
  • The pumped-storage power system is the one of the hydroelectric power systems, generating electricity with hydraulic head difference. In this system, the electricity is produced during the hours of peak demand by using water that has been pumped into an upper reservoir from a lower reservoir during the hours of low demand. Generally, the system consists of an under-ground power house and tunnels such as the headrace, pressure, and tailrace tunnels. The Chungsong pumped-storage power station is the sixth one In the pumped-storage power station in Korea. Both the regional self-government and the population of chungsong -Goon had made a great effort to draw this power station construction into this area. The proposed Chungsong pumped-power station construction project was accepted by the central government as a part of the national electricity plan for the first time in Korea.

  • PDF

빠른 응답성을 갖는 가변속 DFIM 분석 (Analysis of Doubly Fed Variable-Speed Pumped Storage Hydropower Plant for Fast Response)

  • 손금뢰;서정진;차한주
    • 전력전자학회논문지
    • /
    • 제27권5호
    • /
    • pp.425-430
    • /
    • 2022
  • A pumped storage power station is an important means to solve the problem of peak load regulation and ensures the safety of power grid operation. The doubly fed variable-speed pumped storage (DFVSPS) system adopts a doubly fed induction machine (DFIM) to replace the synchronous machine used in traditional pumped storage. The stator of DFIM is connected to the power grid, and the three-phase excitation windings are symmetrically distributed on the rotor. Excitation current is supplied by the converter. The active and reactive power of the unit can be quickly adjusted by adjusting the amplitude, frequency, and phase of the rotor-side voltage or current through the converter. Compared with a conventional pumped storage hydropower station (C-PSH), DFVSPS power stations have various operating modes and frequent start-up and shutdown. This study introduces the structure and principle of the DFVSPS unit. Mathematical models of the unit, including a model of DFIM, a model of the pump-turbine, and a model of the converter and its control, are established. Fast power control strategies are proposed for the unit model. A 300 MW model of the DFVSPS unit is established in MATLAB/Simulink, and the response characteristics in generating mode are examined.

양수발전소용 펌프수차${\cdot}$발전기 전동기 축계의 진동해석 (Vibration Analysis of Pump/Turbine and Generator/Motor Rotor System for Pumped Storage Power Stations)

  • 양보석;최병근;김용한;하현천
    • 한국유체기계학회 논문집
    • /
    • 제2권2호
    • /
    • pp.39-45
    • /
    • 1999
  • Pumped-storage power plants pumps the water from the lower reservoir to the upper reservoir using the extra electric power at night and generates electric power in the daytime. Currently it tends to be a high-head large-capacity machine. In this paper, we developed the computer programs for vibration analysis of the pump/turbine and generator/motor rotor system considering electromagnetic force, hydrodynamic unbalance force, dynamic characteristics of guide bearings and add mass of water. This program was verified by applying it to the real model and calculating the critical speed, natural mode and unbalance response.

  • PDF

고낙차 조건에서의 154kV XLPE CABLE 설치 (An Installation of 154kV XLPE CABLE in Steep Slope Condition)

  • 황순철;이창수;이천구;고창성
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1992년도 하계학술대회 논문집 B
    • /
    • pp.775-778
    • /
    • 1992
  • In 1980, 154kV OF cable was installed at the Cheong-Pyeong pumped-storage power station. Effective head of this pumped-storage station is 250m between upper and lower re-servior and length of cable route is 750m. However, several failures have happened owing to steep slope during the operation. 154 kV XLPE cable was applied for this power station to eliminate a lack of stability on account of steep slope and successfully installed in 1991. Meanwhile, installation procedure brings about many problem to be solved. In this paper, we describe the counter measure of cable sliding phenomena caused by heat shrinkage as well as the method of installation of cable under the steep slope condition. And hereafter, we think this paper will be a good reference to design and installation of 154kV XLPE cables in steep slope turnnel at urban areas.

  • PDF

GIS기반 적지분석을 통한 조류-양수 융합발전시스템 설치후보지 도출 연구 (Derivation of Candidate Sites for a Tidal Current-Pumped Storage Hybrid Power Plant Using GIS-based Site Selection Analysis)

  • 이철용;최현우;박진순;김지훈;박준석
    • 한국지리정보학회지
    • /
    • 제23권4호
    • /
    • pp.184-207
    • /
    • 2020
  • 본 연구에서는 GIS기반 적지분석을 적용하여 조류-양수 융합발전시설의 설치후보지역을 도출하는 것을 목표로 하였다. 연구대상지역은 진도 일대 서남해 해역이며, 융합발전시설의 설계 및 설치 특성을 고려하여 적지분석을 위한 고려인자를 도출하였다. MOHID(Modelo HIDrodin?mico)를 이용하여 조류 수치모의를 수행하였고, 모의 결과를 공간자료로 변환하였다. 이후 본 연구에서는 제안하는 GIS기반 중첩분석 방법을 적용하여 설치후보지역을 도출하였다. 연구 결과에서 총 10개 지역이 후보지역으로 도출되었으며, 이 중 진도, 성남도, 하조도가 상대적으로 넓은 해역에 대해 조류-양수 발전기 설치가 가능한 것으로 판단되었다.

양양 남대천의 어류상과 어류군집 (Ichthyofauna and Fish Community Structure in Namdae Stream, Yangyang, Korea)

  • 김치홍;이완옥;홍관의;이철호;김종화
    • 한국어류학회지
    • /
    • 제18권2호
    • /
    • pp.112-118
    • /
    • 2006
  • 2004년 4월부터 2005년 3월까지 매월 양양 남대천 11개 지점에서 어류상을 조사한 결과 총 15과 35종이 출현하였다. 우점종은 Triboblodon hakonensis (27.9%), 아우점종은 Zacco koreanus (15.0%)로 나타났다. 한국 고유종은 Rhynchocypris kumgangensis 등 5종이 출현하였으며, 본 조사에서 처음으로 확인된 종은 Pungtungia herzi 등 11종이었다. 조사 지점별로 상류에는 R. kumgangensis, 중류에는 Z. koreanus와 Z. platypus, 하류에는 T. hakonensis가 우점하는 안정된 군집구조를 이루고 있으나, 중류 지역에 양수 발전소가 건설 중에 있어 추후 어류상의 변화가 예상된다.

지상레이저스캐너를 이용한 댐의 변위관측 (Deformation Measurements of Dam using Terrestrial Laser Scanner)

  • 박세훈;최득화;한동엽
    • 한국측량학회지
    • /
    • 제27권1호
    • /
    • pp.645-655
    • /
    • 2009
  • 삼랑진 양수발전소 상 하부댐 시설물에 매설되어 있는 기준점을 이용하여 댐의 변위에 대한 모니터링이 이루어지고 있다. 1997년, 2002년, 2007년에 이루어진 수직 및 수평 변위 관측방법은 기준점에 대한 비교분석을 통해 댐의 거동을 파악하였다. 전통적 측량방법으로는 댐체의 전체적인 거동을 세밀하게 분석하기 어려운 문제가 있으므로 본 연구에서는 지상레이저스캐너를 이용하여 댐체 표면을 관측하여, 스캔성과와 설계단면과의 비교분석을 통해 준공이후 현재까지의 댐체 변형을 추정하였다. 상부댐의 설계대비 수직변위량은 댐마루의 중간부분인 최대단면부에서 최대 1.5 m가 발생하였고, 하류사면에서는 중앙과중하위 부분인 SP4-2 부근에서 0.75 m, SP4-4 부근에서 0.5 m가 발생하였다. 하부댐의 설계대비 수직변위량의 최대 침하는 댐마루와 상류사면 상단부에서 발생하였고 침하량은 $-0.4\;m{\sim}-1.0\;m$ 범위로 분석되었다. 본 연구의 성과는 향후 댐체의 전체적인 거동을 분석하기 위한 초기치 설정 관측으로 이용될 수 있다.