Abstract
Deformations of the dam have been monitored by control points buried in the upper and lower dam of Samrangjin pumped storage power plant. The horizontal and vertical deformation observations performed in 1997, 2002, 2007 are to identity movements of the dam body by comparing and analyzing control points. For that reason, it was difficult to analyze movements of the dam in detail. Therefore, this research has observed surface of the dam using terrestrial laser scanner and estimate movements of the dam by comparing and analyzing scanned and designed surfaces of the dam since building completion. Vertical deformation of upper dam took place in the middle of ridge of dam, maximum cross section, up to 1.5m. In the middle and middle bottom of the downstream slope, vertical deformation was produced 0.75m around SP4-2 point and 0.5m around SP4-4 point. The maximum subsidence of vertical deformation in the lower dam took place in the middle of ridge of dam and upper part of upstream slope and subsidence was analyzed from -0.4 to -1.0m respectively. The result of this research can be used as initial observation to analyze whole movement of the dam in the future.
삼랑진 양수발전소 상 하부댐 시설물에 매설되어 있는 기준점을 이용하여 댐의 변위에 대한 모니터링이 이루어지고 있다. 1997년, 2002년, 2007년에 이루어진 수직 및 수평 변위 관측방법은 기준점에 대한 비교분석을 통해 댐의 거동을 파악하였다. 전통적 측량방법으로는 댐체의 전체적인 거동을 세밀하게 분석하기 어려운 문제가 있으므로 본 연구에서는 지상레이저스캐너를 이용하여 댐체 표면을 관측하여, 스캔성과와 설계단면과의 비교분석을 통해 준공이후 현재까지의 댐체 변형을 추정하였다. 상부댐의 설계대비 수직변위량은 댐마루의 중간부분인 최대단면부에서 최대 1.5 m가 발생하였고, 하류사면에서는 중앙과중하위 부분인 SP4-2 부근에서 0.75 m, SP4-4 부근에서 0.5 m가 발생하였다. 하부댐의 설계대비 수직변위량의 최대 침하는 댐마루와 상류사면 상단부에서 발생하였고 침하량은 $-0.4\;m{\sim}-1.0\;m$ 범위로 분석되었다. 본 연구의 성과는 향후 댐체의 전체적인 거동을 분석하기 위한 초기치 설정 관측으로 이용될 수 있다.