A Case Study on the Chungsong Pumped-storage power station Construction (청송 양수발전소 시공사례)

  • Hong, Chang-Soo;Lee, Hyun-Koo;Do, Jong-Youl
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.169-178
    • /
    • 2006
  • The pumped-storage power system is the one of the hydroelectric power systems, generating electricity with hydraulic head difference. In this system, the electricity is produced during the hours of peak demand by using water that has been pumped into an upper reservoir from a lower reservoir during the hours of low demand. Generally, the system consists of an under-ground power house and tunnels such as the headrace, pressure, and tailrace tunnels. The Chungsong pumped-storage power station is the sixth one In the pumped-storage power station in Korea. Both the regional self-government and the population of chungsong -Goon had made a great effort to draw this power station construction into this area. The proposed Chungsong pumped-power station construction project was accepted by the central government as a part of the national electricity plan for the first time in Korea.

  • PDF

Analysis of Doubly Fed Variable-Speed Pumped Storage Hydropower Plant for Fast Response (빠른 응답성을 갖는 가변속 DFIM 분석)

  • Sun, Jinlei;Seo, Joungjin;Cha, Hanju
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.27 no.5
    • /
    • pp.425-430
    • /
    • 2022
  • A pumped storage power station is an important means to solve the problem of peak load regulation and ensures the safety of power grid operation. The doubly fed variable-speed pumped storage (DFVSPS) system adopts a doubly fed induction machine (DFIM) to replace the synchronous machine used in traditional pumped storage. The stator of DFIM is connected to the power grid, and the three-phase excitation windings are symmetrically distributed on the rotor. Excitation current is supplied by the converter. The active and reactive power of the unit can be quickly adjusted by adjusting the amplitude, frequency, and phase of the rotor-side voltage or current through the converter. Compared with a conventional pumped storage hydropower station (C-PSH), DFVSPS power stations have various operating modes and frequent start-up and shutdown. This study introduces the structure and principle of the DFVSPS unit. Mathematical models of the unit, including a model of DFIM, a model of the pump-turbine, and a model of the converter and its control, are established. Fast power control strategies are proposed for the unit model. A 300 MW model of the DFVSPS unit is established in MATLAB/Simulink, and the response characteristics in generating mode are examined.

Vibration Analysis of Pump/Turbine and Generator/Motor Rotor System for Pumped Storage Power Stations (양수발전소용 펌프수차${\cdot}$발전기 전동기 축계의 진동해석)

  • Yang, Bo-Suk;Choi, Byung-Gun;Kim, Young-Han;Ha, Hyun-Cheon
    • The KSFM Journal of Fluid Machinery
    • /
    • v.2 no.2 s.3
    • /
    • pp.39-45
    • /
    • 1999
  • Pumped-storage power plants pumps the water from the lower reservoir to the upper reservoir using the extra electric power at night and generates electric power in the daytime. Currently it tends to be a high-head large-capacity machine. In this paper, we developed the computer programs for vibration analysis of the pump/turbine and generator/motor rotor system considering electromagnetic force, hydrodynamic unbalance force, dynamic characteristics of guide bearings and add mass of water. This program was verified by applying it to the real model and calculating the critical speed, natural mode and unbalance response.

  • PDF

An Installation of 154kV XLPE CABLE in Steep Slope Condition (고낙차 조건에서의 154kV XLPE CABLE 설치)

  • Hwang, Soon-Chul;Lee, Chang-Su;Lee, Cheon-Ku;Goh, Chang-Sung
    • Proceedings of the KIEE Conference
    • /
    • 1992.07b
    • /
    • pp.775-778
    • /
    • 1992
  • In 1980, 154kV OF cable was installed at the Cheong-Pyeong pumped-storage power station. Effective head of this pumped-storage station is 250m between upper and lower re-servior and length of cable route is 750m. However, several failures have happened owing to steep slope during the operation. 154 kV XLPE cable was applied for this power station to eliminate a lack of stability on account of steep slope and successfully installed in 1991. Meanwhile, installation procedure brings about many problem to be solved. In this paper, we describe the counter measure of cable sliding phenomena caused by heat shrinkage as well as the method of installation of cable under the steep slope condition. And hereafter, we think this paper will be a good reference to design and installation of 154kV XLPE cables in steep slope turnnel at urban areas.

  • PDF

Derivation of Candidate Sites for a Tidal Current-Pumped Storage Hybrid Power Plant Using GIS-based Site Selection Analysis (GIS기반 적지분석을 통한 조류-양수 융합발전시스템 설치후보지 도출 연구)

  • LEE, Cholyoung;CHOI, Hyun-Woo;PARK, Jinsoon;KIM, Jihoon;PARK, Junseok
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.23 no.4
    • /
    • pp.184-207
    • /
    • 2020
  • This study aimed to determine candidate areas for tidal current-pumped storage hybrid power plants using GIS-based site selection analysis. The study area is the southwestern sea surrounding Jindo Island in South Korea. Factors to be considered for the site selection analysis were derived considering the design and installation characteristics of the hybrid power plant. Numerical simulation to predict tidal speed was performed using the MOHID(Modelo HIDrodin?mico) and the results were converted into spatial data. Subsequently, a GIS-based overlay analysis method proposed in this study was applied to derive the installation candidate area. A total of 10 regions were identified as candidate sites. Among them, it was determined that the power generator could be installed in relatively wide sea areas in Jindo, Seongnamdo, and Hajodo.

Ichthyofauna and Fish Community Structure in Namdae Stream, Yangyang, Korea (양양 남대천의 어류상과 어류군집)

  • Kim, Chi-Hong;Lee, Wan-Ok;Hong, Kwan-Eui;Lee, Cheul-Ho;Kim, Jong-Hwa
    • Korean Journal of Ichthyology
    • /
    • v.18 no.2
    • /
    • pp.112-118
    • /
    • 2006
  • The ichthyofauna and fish community structure were investigated at eleven stations in Namdae stream, Yangyang during April, 2004 and March 2005 monthly. During the surveyed period thirty five species belonging to fifteen families were collected. Dominant species in number was Triboblodon hakonensis (relative abundance : 27.9%) and subdominant was Zacco koreanus (15.0%). There were five Korean endemic species including Rhynchocypris kumgangensis. Eleven species including Pungtungia herzi are first recorded in this study. There are stabilized fish community structure with dominant species R. kumgangensis in upstream, Z. koreanus and Z. platypus in midstream and T. hakonensis in downstream respectively. But, it is very worried the change of ichthyofauna in foreseeable future because of pumped storage power station construction in midstream.

Deformation Measurements of Dam using Terrestrial Laser Scanner (지상레이저스캐너를 이용한 댐의 변위관측)

  • Park, Sae-Hoon;Choi, Duk-Hwa;Han, Dong-Yeob
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.27 no.1
    • /
    • pp.645-655
    • /
    • 2009
  • Deformations of the dam have been monitored by control points buried in the upper and lower dam of Samrangjin pumped storage power plant. The horizontal and vertical deformation observations performed in 1997, 2002, 2007 are to identity movements of the dam body by comparing and analyzing control points. For that reason, it was difficult to analyze movements of the dam in detail. Therefore, this research has observed surface of the dam using terrestrial laser scanner and estimate movements of the dam by comparing and analyzing scanned and designed surfaces of the dam since building completion. Vertical deformation of upper dam took place in the middle of ridge of dam, maximum cross section, up to 1.5m. In the middle and middle bottom of the downstream slope, vertical deformation was produced 0.75m around SP4-2 point and 0.5m around SP4-4 point. The maximum subsidence of vertical deformation in the lower dam took place in the middle of ridge of dam and upper part of upstream slope and subsidence was analyzed from -0.4 to -1.0m respectively. The result of this research can be used as initial observation to analyze whole movement of the dam in the future.