• Title/Summary/Keyword: Public project

Search Result 2,144, Processing Time 0.025 seconds

A Study on the Activation Plan of Village Maintenance for Public Housing Project of Local Small and Medium-Sized Cities (지방 중소도시 마을정비형 공공주택사업 활성화 방안 연구)

  • Kang, Dong-Ryeol;Ahn, Jung-Geun;Bae, Min-Cheul
    • Journal of Korean Society of Rural Planning
    • /
    • v.28 no.2
    • /
    • pp.21-32
    • /
    • 2022
  • Since the village maintenance type public housing project was introduced in 2015, the resident needs for regional revitalization and pleasant living conditions are not being met due to the poor performance of the public housing complexes that reflect the surrounding area maintenance plan (village plan) and regional characteristics. The purpose of this study is to suggest a plan to revitalize the village maintenance type public housing project in consideration of regional characteristics as a result of analyzing the needs of local residents through the problems of the village maintenance type public housing project being promoted so far and resident satisfaction. As a result of the analysis based on the public housing project implementation status analysis and resident satisfaction, the plans to activate the village maintenance type public housing project are as follows. First, in order to secure the effectiveness of the village plan, it is desirable to promote the public housing project and the village plan at the same time. It is necessary to secure a budget according to the selection of public offering projects in the village plan, such as promoting public housing projects without setbacks by prioritizing land purchases for public housing sites and establishing specialized strategies considering regional characteristics. Second, a public housing project that responds to local demand is required. The evaluation factors such as continuous promotion of the urban architecture integration plan and strengthening of regional linkage plans such as specialization of regionally tailored designs should be supplemented so that regional resources and village plans are linked with the public housing specialization plan. Third, surrounding area maintenance plan (village plan) should be secured by the strengthen of the legal status or establishing related provisions. It is also necessary to promote system improvement for area maintenance plan (village plan) when selecting a publicly funded public project.

Assessment of Public Engagement Approach in Various Project Stages: The Case Study of Central Market, Hong Kong

  • Wong, Crystal;Chan, Icy;Lam, Lily;Zayed, Tarek;Sun, Yi
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.267-277
    • /
    • 2020
  • The present research evaluates the public engagement approach in various project stages. Hong Kong had long been criticized as top-down and executive-led jurisdiction by overlooking the importance of cultural heritage and public concerns on public projects. It was suggested to the government to engage public and provide sufficient public consultation. Thereby, the government announced a series of revitalization and conversion measures in Policy Address in 2008. To carry out the measures, there were voices, because of diverse and sometimes conflicting interests, over the effect of revitalization project. On the other hand, studies reveal that there are benefits of revitalization and enhancement of public engagement approach. In pursuit of the subject, the present research aims at studying the Central Market as a case study pilot project. In October 2009, the Policy Address announced that the Central Market be revitalized. Tasked to implement the project, Urban Renewal Authority (URA) continued to adopt the people-oriented approach as the guiding principle in its core business and in heritage preservation and revitalization so as to create a sustainable development. Between government and the public, URA acts as a bridge for communication. As between URA and the public, URA conducted public consultation, set up an ad-hoc committee in January 2016 to be in charge of the project and will continuously inform the government and public with the updates and project progress. The main objectives of the present research are to assess the advantages and challenges in different stages of public engagement approach, to evaluate the engagement system, to give a comprehensive view for participation of stakeholders, and to find out effective strategies to enhance civil engagement. Research was achieved through interviews to key persons in the project, questionnaire that was distributed to community and experts in the field. Case Study of the Central Market was studied and investigated using different sources, such as newspapers, journals, etc, to evaluate the degree of public engagement in the project. Both detailed qualitative methodological approaches of interview, questionnaire, and case study, act as a synergy to demonstrate the research objectives and provide the comprehensive perceptions on the revitalization project. The results show that public participants in revitalized project have generated considerable value enhancements to social-cultural, environmental, political and economic aspect. This study provides valuable insights that the public participation can make positive contribution to sustainability in the city. The findings indicate that no any single system is flawless therefore seeking both public opinions and professional advices are also important as a comprehensive approach to achieve higher sustainability of the building.

  • PDF

Public Park Project of School Facilities and Making Outdoor Space Based on the Consideration of Public Performance - Focused on Elementary School in Cheongju City - (공공성을 고려한 학교시설 공원화 사업과 외부 공간 조성 - 청주시 초등학교를 중심으로 -)

  • Kim, Seung-Geun;Sin, Ju-Seong
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.17 no.4
    • /
    • pp.13-20
    • /
    • 2010
  • Schools have developed together with local communities, as leading public buildings that represent local communities. Most elementary schools are located in walking distance, so that makes it possible to maintain close relationships with local residents. This study examine outside space where the school buildings are restructured for new images through public park project. The results of this research as follows. 1st, Public park project of school facilities is charge of key role to improve urban image. 2nd, Public park project of school facilities promote environmental, social and educational participation of school members. 3rd, We need to develop a outside space plan and to gather diverse opinions before we start on the Public park project of school facilities. 4th, It is important to maintain the space desirable through sharing of roles by members of schools and local communities. Public park project of school facilities has to be the center of participation, process, commune and practical use.

A International Comparative Study on the Bidding System & Policy for the Public IT Project (공공 IT 프로젝트 수발주 제도와 정책의 국제간 비고)

  • Noh, Kyoo-Sung
    • Journal of Digital Convergence
    • /
    • v.6 no.1
    • /
    • pp.11-19
    • /
    • 2008
  • The Bidding System of the public IT project in Korea is fallen behind, because of the ordering habitual practice based old system, overcompetition based sealed bid and subcontract practice. To innovate this old-fashioned practice for public IT project bidding, this paper wants to generate a proper improvement direction of the public IT project contract law and the related policy through the literature review about the ordering and receiving system in Korea, the practical survey about bidding marketplace in Korea, and competition between bidding system and/or policy of major countries: USA, UK, France and Japan. As a result of practical survey, many problems of the current public IT project bidding system came out and improvement ideas toward future situation turned up. These outputs implicate that the current law and system related public IT project demands better improvement work for the future ubiquitous Korea. Therefore, this paper, to solve these problems about bidding systems and practice, propose the new public IT project contract law and the related policy, reflecting these improvement ideas by the practical survey and the literature review, and benchmarking points from bidding system of other countries.

  • PDF

Information Systems in Project Management of The Public Sphere

  • Mamatova, Tetiana;Chykarenko, Iryna;Chykarenko, Oleksii;Kravtsova, Тetiana;Kravtsov, Olеg
    • International Journal of Computer Science & Network Security
    • /
    • v.21 no.8
    • /
    • pp.141-148
    • /
    • 2021
  • Project management is a current trend of management in the public sphere, based on different principles, methods and tools. The tools include information technologies providing control over time, cost, quality and planning process in order to ensure accountability to interested parties. The goal of the research was to examine the impact of the integration of information systems in project management of the public sphere on the quality of public governance and administration using the example of infrastructure projects involving the private sector in developing countries. The methodology of the research is based on the concepts of "digital-era governance" (DEG), "Information governance" and "project governance" to determine the effectiveness of information systems and technologies in the management of infrastructure projects in the public sphere. The data from the countries with Lower middle income (India, Indonesia, Philippines, Ukraine, Vietnam) and Upper middle income (Argentina, Brazil, China, Colombia, Mexico, Peru, Romania, Russian Federation, Thailand, Turkey) for 1996-2020 were used to study the effects of DEG. The results show two main trends in the countries with Lower middle income and Upper middle income. The first trend is the development of digital governance, the concept of "digital-era governance" through information systems and performance measurement of the governance system, forecasting of investment flows of infrastructure projects, measurement of payback and effectiveness parameters for investment management in the public sector, decision support. The second trend is the existence of systemic challenges related to corruption, social and institutional factors through the development of democracy in developing countries and the integration of NPM similar to developed countries. The confidence of interested parties, especially private investors, in public authorities is determined by other factors - the level of return on investment, risks and assignment of responsibility, probability of successful completion of the project. These data still remain limited for a wide range of project participants, including citizens.

The Effects on the R&D Project Performance according to the Characteristics of Project Management Organizations: The Difference between Public and Private Companies (연구사업관리 주관기관에 따른 기술혁신 R&D 프로젝트 성과 영향분석: 공공과 민간 기업의 차이 비교)

  • Yong-Kyu Lee;So-Hyun Park;Hee Kyung Kim;Taewon Lee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.2
    • /
    • pp.116-132
    • /
    • 2023
  • Technology innovation companies are focusing on contributing to business performance by R&D project as a strategic tool. Successful R&D leads to corporate competitiveness enhancement, national industrial development, but there are high uncertainty and risks in R&D. Public and private R&D projects are carried out to achieve various purposes. It was verified how the risk management and benefit management of the R&D project affect the detailed R&D project performance between the Public and private domain. The impact of Project Leadership on R&D performance was also analyzed. Those who have participated in the Public and Private R&D projects at companies or research institutes were surveyed. First, it was found that project risk and benefit management have partially an effect on R&D project performance. Second, Public and private R&D Project Leadership showed partially a interaction effect between project management and project performance.

An Exploratory Study on the Management Behavior of the Public Software Project (공공 소프트웨어 프로젝트의 관리 행태에 관한 탐색적 연구)

  • Kim, Yong-Kyong;Kim, Pil-Joong
    • Journal of Information Technology Applications and Management
    • /
    • v.13 no.4
    • /
    • pp.237-255
    • /
    • 2006
  • This study was exploratively performed to demonstrate the management behavior of the public software project in korea. In this study, 167 auditing reports on the public software project which were carried out during $1999{\sim}2003$, were employed and surveyed. Survey reveals that quality management was the most neglected in process of software project management relative to other 12 management areas. And configuration management, risk management, time management, and scope management follow up in order in its vulnerability in software project management.

  • PDF

Integration of the Feasibility Assessment Procedure and EIA of the Big Public Investment Project : In the Case of the Saemangeum Reclamation Project (대규모 공공투자사업의 경제적 타당성 평가와 환경영향평가 통압 방안 - 새만금 간척사업을 사례로 -)

  • Choi, Mi-Hee
    • Journal of Environmental Impact Assessment
    • /
    • v.11 no.2
    • /
    • pp.93-107
    • /
    • 2002
  • The choice of big public investment project needs an appropriate feasibility analysis before it is implemented, bemuse a rot wisely chosen one would bring about big and longrun societal costs. But the feasibility analysis for the big public investment project in Korea has been done without linking the economic benefits and environmental damages. Consequently social conflicts arose frequently during and after project implementation, owing to such concerns asincreasing costs and serious ecological damages. The recent social conflict over the Saemangeum Project is a typical case. This reclamation project began in 1991 and finished 60% of the whole process in 1999, when its feasibility was again assessed under the public pressure by the joint assessment team consisting of both citizen's and government's professionals. Even the assessment report by this joint team could not show the convincing results owing to the improper assessment procedure and failure to set proper feasibility criteria. This paper pointed out the limitations of our current procedure of feasibility assessment and identified the concrete problems that atosee during the recent reassessment process of the Saemangeum reclamation project by the joint team. In order to improve the current problem-ridden practices, it is concluded by the policy recommendation for establishing a right feasibility assessment procedure for the public investment projects.

MODEL FOR GOVERNMENT RESCUE POLICIES IN PUBLIC-PRIVATE PARTNERSHIP PROJECTS

  • S. Ping Ho
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.996-1001
    • /
    • 2005
  • Today, government is no longer considered the sole provider of public works or services. Public-Private Partnership (PPP) has been recognized as an important approach to solving problems for governments in providing public works and services. However, the joint ownership of public works/services complicates the administration of PPP projects. Particularly, the fact that government may rescue a distressed project and renegotiate with the developer causes serious problems in project procurement and management. This paper aims to study when and how government will rescue a distressed project and what impacts government's rescue behavior has on project procurement and contract management. A game-theory based model for government rescue will be developed. This pilot study, the author hopes, may provide theoretic foundations to practitioners/policy makers for prescribing creative PPP procurement and management policies and for examining the effectiveness of PPP policies.

  • PDF

A Study on the Feasibility analysis model for Housing Environment Improvement Project of Depressed region - Focused on the project by the public sector - (낙후지역 주거환경개선사업 타당성분석 평가모델 연구 - 공공(公共) 시행사업을 중심으로 -)

  • Choi, Jung-Min;Choi, Chan-Hwan
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.14 no.1
    • /
    • pp.83-90
    • /
    • 2012
  • The purpose of this study was to set and analyze the standard model for prioritizing and deciding to take part in housing environment improvement project in the perspective of the public sector. The results of this study were as follows. The location competitiveness, potential demand, marketability and competitive price, etc were selected by assessment indicators. And Various indicators, including of the size of the area, public transportation, accessibility, convenience of living and the influx of the population, were used by weights indexes. The profit of local residents and the public promoter, variability of earnings, sensitivity analysis and the ratio of money in reserve, etc were also established as detailed indexes for the profitability and business risk analysis. To analyze the cash flow of the project process and review the necessary capital in advance, the payback, total working expenses, gearing ratio and sensitivity of a risk, etc were also set as additional detailed indexes. Lastly, considering it is quasi-public projects, the measure to protect tenants, necessity need of redevelopment and local government's will were additionally used by indexes. And Points were distributed on the importance of each index and scored out of 100. It will allow for the public project promoter to decide rationally whether to come in on the project. The public project promoter like the Korea Land and Housing Corporation will be able to make use of various indexes are based on this study to make decision whether joining the housing environment improvement project in depressed region.