• 제목/요약/키워드: Public Work Projects

검색결과 155건 처리시간 0.024초

인필식 모듈러 공법을 적용한 주택건설공사의 작업분류체계 구축 및 표준 프로세스 제안 (Standard Process and Work Breakdown Structure for Housing Construction Projects using Infill Modular System)

  • 손정락;이동건;방종대;김진원
    • 토지주택연구
    • /
    • 제10권3호
    • /
    • pp.77-87
    • /
    • 2019
  • In Korea, the modular construction method was applied to the construction of facilities such as military barracks and school dormitories, beginning with the pilot project of Seoul New Elementary School in 2003. In 2017, public modular houses were supplied to Busan(Yongho-dong) and Seoul(Gayang-dong), and modular housing is expected to continue to be supplied in the future. However, there is no clear construction standard for the modular housing construction yet, and there are few cases where the infill modular system is applied. Therefore, this study established the work breakdown structure and proposed a standard process focusing on the infill modular system applied to the construction of Dujeong-dong modular house in Cheonan. Level 1 of the work breakdown structure by construction stage of Infill modular was defined as modular manufacturing, assembly, and finishing process. Level 2 was defined as preparation, modular production, modular infill, modular fixing, floor plastering, building finishing, and other site finishing. Level 3 is defined as 57 detailed unit work of infill modular construction. The standard process of infill modular is proposed for the assembly stage that is commonly applicable to infill modular housing construction. The results of this study can be used for the process plan, transportation plan, lifting plan of modular housing construction.

Addressing User Requirements in Open Source Software: The Role of Online Forums

  • Raza, Arif;Capretz, Luiz Fernando
    • Journal of Computing Science and Engineering
    • /
    • 제8권1호
    • /
    • pp.57-63
    • /
    • 2014
  • User satisfaction has always been important in the success of software, regardless of whether it is closed and proprietary or open source software (OSS). OSS users are geographically distributed and include technical as well as novice users. However, it is generally believed that if OSS was more usable, its popularity would increase tremendously. Hence, users and their requirements need to be addressed in the priorities of an OSS environment. Online public forums are a major medium of communication for the OSS community. The research model of this work studies the relationship between user requirements in open source software and online public forums. To conduct this research, we used a dataset consisting of 100 open source software projects in different categories. The results show that online forums play a significant role in identifying user requirements and addressing their requests in open source software.

중소형 건물 태양광발전시스템의 실증 연구 (Field Test Study of Photovoltaic Generation System for Medium and Small-Sized Buildings)

  • 김응상;김슬기
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2006년도 추계학술대회
    • /
    • pp.561-565
    • /
    • 2006
  • The paper presents a method of assessing the adequate tapaclty of photovoltaic generation systems for public buildings based on analysis of load variation patterns of customers. When PV systems are installed for supplying power for the customer load, reverse power relay is required by the guideline to be installed at the point of common coupling with the power network. The suggested method analyzes daily, weekly and monthly load demand of the customer that Irishes PV system installation, and determines the appropriate rating of the PV system for preventing PV generation from exceeding the customer demand. This work is expected to support renewable energy dissemination projects of public organizations.

  • PDF

공공건설공사의 하도급 거래 공정화를 위한 계약변경 제도개선 방향 (Improvement of Contract Change Order System for the Fairness of Subcontracting in Public Construction Projects)

  • 조영준
    • 한국건설관리학회논문집
    • /
    • 제21권5호
    • /
    • pp.3-10
    • /
    • 2020
  • 공공건설사업을 수행하기 위해서는 건설 하도급은 필수적인 사항이다. 건설공사의 하수급인은 발주자와 직접 계약을 체결하지 않고 원수급인과 계약을 체결하기 때문에 발주자와 원수급인의 계약에 큰 영향을 받고 있다. 하수급인을 보호하기 위해 공정거래법이 제정되고 건설공사의 표준하도급계약서가 운용되고 있지만 발주자와 원수급인과의 관계를 다루는 국가계약법령체계에서는 하도급계약이 제대로 반영되어 있지 못하다. 특히 하도급계약에서 설계변경이 발생할 경우 금액에 따라 다양한 절차를 거쳐야 하지만 이러한 절차 등이 건설공사 표준하도급계약서에 제대로 반영되지 않고 있으므로 공공건설현장에서는 어려움을 호소하는 경우가 있다. 이에 본 연구에서는 공공건설사업현장에서 설계변경이 이루어질 경우 하도급계약의 제도개선 방향을 다음과 같이 제시하였다. 첫째, 국가계약에서 하수급인의 원수급인에 대한 권리를 강화해야 한다. 둘째, 정보비대칭성을 해소하기 위해 하수급인이 하도급계약과 관련한 정보에 접근할 수 있도록 해야 한다. 셋째, 공공공사의 원도급계약체결시에는 하도급계약의 특성을 반영하여 하수급인의 지위를 보장해야 한다. 넷째, 하도급거래 공정화를 위해 분쟁처리방법을 소송보다 조정이나 중재를 우선하도록 해야 한다.

한의약건강증진사업 발전을 위한 공중보건한의사 역할 탐색 (Exploring the roles of Korean public health doctors in the development of Korean medicine health promotion project)

  • 진성미;박선주
    • 대한예방한의학회지
    • /
    • 제21권3호
    • /
    • pp.11-18
    • /
    • 2017
  • Objectives : In an effort to suggest a developmental plan of Traditional Korean Medicine health promotion project(TKM-HPP), this study was conducted to identify the problems experienced by public health Traditional Korean Medicine(PH-TKM) doctors in duty and to analyze successful cases of the health promotion project. Methods : Two PH-TKM doctors in duty at the Public Health Centre branch and Public Health Centre respectively, and one TKM doctor in charge of Public Health Centre participated in the in-depth interview. The research procedure was as follows; 1) inform study objectives and interview questions to participants, 2) in-depth interview with semi-structured questions, and 3) post-confirmation and verification. The interview was recorded and transcripted. In-depth interview was composed of 6 subsections: 1) Introducing participants and share purpose of interview, 2) Confirmation of the job status and difficulty of public health centre, 3) Reflecting and sharing experiences of public health clinic job performance cases, 4) Current status and improvement needs of TKM-HPP, 5) Discussions on improvement of TKM-HPP in public health center, 6) Sharing and reconfirmation of interview results. Thematic analysis was conducted from the narratives. Results : The study showed that; 1) the support from the local government was critical for the successful TKM-HPP and participation of the PH-TKMs; 2) the major problems experienced by PH-TKMs were lack of training for TKM-HPP in the field and lack of knowledge at local government level; 3) the suggestions to provide PH-TKMs with manual to educate residents effectively and redefine roles of PH-TKMs in the project. It also suggests that TKM-HPP model should be developed by the district in a way of reflecting regional characteristics. Conclusions : Firstly, more efforts should be made on the projects rather than medical treatment in public health centers, except for areas where medical institutions are scarce. Secondly, in order to facilitate participation of PH-TKM doctors, each local office should reduce medical care and increase efforts related with projects. Thirdly, the institution has to develop feasible TKM-HPP plans that can be carried out by PH-TKMs by the manual. Lastly, pre-training should be provided to PH-TKMs to understand contents of TKM-HPP related to public health centre work before the placement.

사회환경분야 환경영향평가 개선방안 (A Study on the Improvement Scheme of Environmental Impact Assessment in Social Environment)

  • 신경희;임효숙;조공장
    • 환경영향평가
    • /
    • 제21권1호
    • /
    • pp.15-24
    • /
    • 2012
  • The purpose of this study is to understand the process and characteristics of social impact caused by development projects through research and analysis on issues presented during development projects carried out in Korea. Furthermore, on the basis this analysis, this study proposes possible improvement measure environmental impact assessment for minimizing social impact of development projects in the future. Issues related to development projects are generated mainly by the following three causes. Initial social impact can occur when a development project directly causes certain changes in natural, living and social environment. Operational problems related to assessment are another cause of social impact, and it can also occur when changes in natural and living environment work in tandem with social environment sphere. Social impact of development projects is not brought about solely by changes in social environment, but is the result of interaction of factors such as changes in social, natural, living environment and problems related to assessment or operation/management. As to why the current environmental impact assessment could not provide satisfactory solution to the issues mentioned above, this study suggests the following reasons: limitations of assessment method used in social environment category, difficulties in defining assessment criteria, limitations inherent in criterion referenced assessment method, insufficient issue-making in local community, and lack of participation on the part of local residents. Possible solutions for these limitations are as follows: 1) To identify local issues in social environment category through participation of local experts in scoping stage, 2) To adopt deliberative method for local participation, 3) To utilize social survey technique.

프로그램 해석을 기반으로 한 공간 디자인에 있어 다이어그램 적용에 관한 연구 - MVRDV와 벤 반 버클의 프로젝트를 중심으로 - (A Study on Application of Space Design Diagrams based on Program Interpretation - Focusing on the Projects by MVRDV and Ben van Berkel -)

  • 김수미;김문덕;정사희
    • 한국주거학회논문집
    • /
    • 제20권1호
    • /
    • pp.113-122
    • /
    • 2009
  • In the work of contemporary spatialization, the meaning of program is being an important conceptual element beyond simple functional dimension. The design of this diagram allows to balance among changing programs, and it comes into the spotlight as a medium, which links the virtual to the reality as embodying the virtual, which is not embodied realistically, realistically through the design process. In other words, this method is attracting the public attention as a design tool which can concentrate on design process rather than a fixed tool. This study focuses on the role of balancing among mixed programs and the diagram as a design tool. Therefore, the purpose of this study is to analyze and research the work of spatialization, which apply to diagrams of contemporary designers, is to identify operating mechanism and then is to examine the characteristics and importance of them.

표준품셈의 신뢰성에 대한 영향요인 분석 (An Analysis on the Influence Factors relative to Reliability of Standard Production Unit System)

  • 김용우;신원상;손창백
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.187-189
    • /
    • 2011
  • Standard production unit system has been used as accumulated standard for the cost estimation of public construction projects. However, it is difficult to estimate reasonable cost due to adaptation of a uniform standard and reflect changes in the technology. The purpose of this study is to provide basic data for improvement of standard production unit system through the identifying problems and analysing its influence on enactment and/or revision work of standard production unit system.

  • PDF

공공건설사업의 최적 발주방식 선정을 위한 의사결정지원모델 (A Decision Support Model for Optimal Delivery of Public Construction Projects)

  • 박희택;박찬식
    • 한국건설관리학회논문집
    • /
    • 제17권5호
    • /
    • pp.22-34
    • /
    • 2016
  • 현재 국내 공공건설사업의 발주제도는 입 낙찰제도와 뚜렷한 구분이 없이 혼용되고 있으며, 선정할 수 있는 기준 자체도 단순히 사업예산이나 추정금액에 의해 정해지고 있다. 발주방식은 본래 사업의 특성이나 유형, 목적 등 다양한 요인들의 특성을 적절히 반영하여 결정해야 함에도 불구하고, 주어진 예산이나 기간, 획일적인 법 규정으로 인해 탄력적으로 운영되지 못하고 있어, 이에 대한 근본적인 해결방안을 마련해야 할 필요성이 지속적으로 제기되고 있다. 이를 위해, 본 연구는 최적 발주방식을 선정할 수 있는 의사결정지원모델을 제안하였다. 이를 위해 문헌고찰과 설문 및 면담조사, 통계적 분석기법을 활용하여 영향요인을 발굴하고, 최종 발주방식 유형별 의사결정지원모델을 제안하여, 실무 적용타당성을 검증하였다. 그 결과 의사결정지원모델은 향후 발주방식을 선정하는데 기초자료로 유용하게 활용함으로써 기존 업무관행을 개선할 수 있을 것으로 기대한다.

골프장 개발에 따른 환경영향평가에 관한 연구 -한국과 일본의 문화적 비교 분석- (A stuffy on the environmental Impact Assessment of golf course development - A comparative cross - cultural analysis between Korea and Japan)

  • 이동근;;;김귀곤;최영수
    • 한국조경학회지
    • /
    • 제18권2호
    • /
    • pp.1-13
    • /
    • 1990
  • In recent years, the construction of golf course has been increasing very rapidIy and serious concern is paid to its environmental consequences both in Korea and in Japan. EIA systems as a major requirements for golf course developments emerged to reduce the adverse impact of their developments in Korea as well as in Japan. This study aims to compare EIA systems, procedures and methodologies employed between Korea and Japan in order to demonstrate the success and failure of EIAs in each country. The results of this study can be summarized as follows : 1) EIAs are systematically undertaken based upon law in Korea but on regulation in Japan. 2) Public participation Isn't encouraged in the Korean EIA procedure while the Japan EIA system involves public participation. 3) Korean EISs shall be prepared after the proposed projects are approved according to the related laws and be followed by the necessary procedures, but in the carte of Japan, EISs be prepared prior to their approval . 4) ELSs shall be prepared by agencies with special expertise with respect to 7he environmental impacts (appointed by government) or the sponsoring agencies themselves in Korea whereas they be prepared by agencies proposing the projects in japan. 5) EISs both in Korea and in Japan are characterized by cliches which may be unfamiliar to reviews and the public. 6) EIAs describe the existing presence and predict and evaluate that a development work influences the present conditions. Here Japan EIA treats mainly natural - and life environment, whereas Korean EIA dose social - and economic environment. And hence in the case of Japan is undertaken more quantitative and scientific analysis, whereas in the case of Korea is less. It is suggested that the key point to impact analysis is to use the correct concepts, fomulate the comparative studies of methodologies and find the methods that suit the decision as well as which country's own circumstances.

  • PDF