References
- Al Khalil, M. I. (2002). "Selecting the appropriate project delivery method using AHP." International journal of project management, 20(6), pp. 469-474. https://doi.org/10.1016/S0263-7863(01)00032-1
- Alarcon, L. F. and Ashley, D. B. (1996). "Modeling project performance for decision making." Journal of Construction Engineering Management, 122(3), pp. 265-273. https://doi.org/10.1061/(ASCE)0733-9364(1996)122:3(265)
- Cho, K., Hong, T., and Hyun, C. (2009). "Effect of project characteristics on project performance in construction projects based on structural equation mode." l, Expert Systems with Applications, 36(7), pp. 10461-10470. https://doi.org/10.1016/j.eswa.2009.01.032
- Choi E. A. (2009). "Selection criteria of project delivery systems by types of public construction project : focused on the projects of Busan metropolitan city." MS Thesis, Dong-Eui Univ.
- Edmond W. M. L., Albert P. C. C., and Daniel W. M. Chan (2008). "Determinants of Successful Design-Build Projects." Journal of Construction Engineering and Management, 134(5), pp. 333-341. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:5(333)
- Ibbs, C. W., Kwak, Y. H., Ng, T., and Odabasi, A. M. (2003). "Project delivery systems and project change: Quantitative analysis." Journal of Construction Engineering and Management: 129(4), pp. 382-387. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:4(382)
- Jeong D. W. (2006). Development of a contractor selection process using best value concept for public design-build projects, MS Thesis, Seoul Univ.
- Jeong S. R. (2011). Selection Model for Decision Method of Qualified Party for Design in Design-Build Delivery System, MS Thesis, Seoul Univ.
- Kim. K. R, and Yoo L. H. (2008). "The Directions for the Improvement of Project Delivery System for Public Construction Projects." AIK, 52(2), pp. 16-18.
- Kim K. S. (2013). A Study on Selection Method of Construction Management System based on Public Construction Projects, MS Thesis, Chung-Buk Univ.
- Kim K. I., Seo Y. C., and Hyun C. T. (2001). "The Delivery System Selection Procedure in the Large Public Construction Projects." AIK, 17(3), pp. 51-58.
- Kim D. Y. (2004). "Risk based Profitability Forecasting in International Construction Projects." MS Thesis, Yon-Sei Univ.
- Kim S. I. (2001). A Study on the Change and Persistence of Public Construction's Bidding Contract System in Korea, Ph. D. Dissertation, Seoul National Univ.
- Kim S. I., Chang C. K., Park D. K., and Bae Y. C. (2014). "Improvement of Architecture-Engineering Service Procurement System for Public Construction Project." Korean Journal of construction engineering and management, KICEM, 15(5), pp. 61-70. https://doi.org/10.6106/KJCEM.2014.15.5.061
- Lee S. H. (2005). A study on recent status and operating for bidding system of overseas improvement bidding system of domestic, Ministry of Strategy and Finance.
- Lee S. B., (2011). A Study on the Improvement of Evaluation Criteria in Selecting Construction Manager for Public Construction Projects, MS Thesis, Chung-Ang Univ.
- Lee K. S. (2002). "Improvement of Construction Delivery System." KRIHS, 33, pp. 34-45.
- Minchin Jr, R. E., Li, X., Issa, R. R., and Vargas, G. G.(2013). "Comparison of cost and time performance of design-build and design-bid-build delivery systems in Florida." Journal of Construction Engineering and Management, 139(10), pp. 139-148.
- Moon H. (2008). "Understanding for Determining Project Delivery System of Public Construction Projects." KRIHS, 320, pp. 150-159.
- Moon H. S. (2007). Selection criteria of delivery methods for domestic multi-housing construction project. MS Thesis, Seoul Univ.
- Moon H. S. (2008). "The Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects." Korean Journal of construction engineering and management, KICEM, 9(3), pp. 75-84.
- Oh S. Y., and Lee M. Y. (2014). Guidebook of Construction Procurement, Korea Institute of Procurement.
- Park H. T. (2015). A Decision Support Model for Optimal Delivery of Public Construction Projects, Ph. D. Dissertation, Chung-Ang Univ.
- Pishdad-Bozorgi, P., and de la Garza, J. M. (2012). "Comparative Analysis of Design-Bid-Build and Design-Build from the Standpoint of Claims. In Construction Research Congress 2012@ Construction Challenges in a Flat World." ASCE, pp. 21-30.
- Seo Y. C. (2003). A Model for selecting project delivery systems of public construction projects, MS Thesis, Seoul Univ.
- Tak S. W. (2008). A Study on the Selection Process Model of Project Procurement System based on Owner's Requirement : Focused on Value Evaluation using Data Envelopment Analysis, MS Thesis, Dan-Kook Univ.