• Title/Summary/Keyword: Public Land Development

Search Result 460, Processing Time 0.03 seconds

An Empirical Study on Urban Land Use Changing Patterns with the Rapid Urban Expansion (급속한 도시팽창과정에서 도시토지이용변동의 실증적 연구)

  • 김지열;강병기
    • Journal of the Korean Regional Science Association
    • /
    • v.8 no.1
    • /
    • pp.31-50
    • /
    • 1992
  • The aim of this paper is to define major factors influencing land development of each of major uses (residential, commercial, industrial) in the process of rapid urban expansion. The main hypothesis of this study is that land use changing patterns are directed by supply side of land managed to public policies rather than demand side. The graphic analysis is applied to relationships between urban growth and land development process of each use and between land development project managed to public policies and land development process. Public and land development projects and zonning protection seem to be major roles of land supply and main determinants of urban spatial structure. Location factors for land development of each uses are selected in 23 variables. Factor analysis is applied to test correlation between variables in 1971 and 1981. Factor structure between two years is similar, but progressive processing of functional separation is derived such as intensive land use is grouped, different location between residential and industrial use is deep. Dependent variables are standardized to logarithm of land development of each use per unit vacant land in two periods, between 1971 and 1980 year and between 1981 year. Correlation analysis between 6 dependent variables and 23 location factors in each years are applied. Major factors of each use are selected in criteria such as high correlation with dependent variables, low correlation between independent variables and common application in two periods. As the result, major factors for residential land development are Land Readjustment Project (LRP), percent of total zoned area in residential zone, residential floor space density per available area, percent of total area in industrial use; for commercial development is distance to CBD, percent of total area in commercial use, residential floor space density per available area in each year, and volumn rate of industrial use; for industrial use is percent of total area of industrial use is percent of total area of industrial use, Industrial Estate Project (IES), LRP, and distance from CBD. Land development pattern of each use between two periods are slightly different. So 6 equation is derived from appling backward method of regession. Adjusted multiple R squares of all is more than 0.5 and those equation is statistically significant and valuable to assist urban land use forecasting.

  • PDF

The Impact of the Land Compensation Act to the Outcome of Land Compensation: a Case Study of Gyeongsan DAEIM Public Housing District (경산 대임공공주택지구의 대토보상결과를 통해 살펴본 대토보상제도 문제점과 개선방안 연구)

  • Park, Chang-Yul;Park, Jung-Jun;Son, Sun-Gum
    • Land and Housing Review
    • /
    • v.11 no.4
    • /
    • pp.75-92
    • /
    • 2020
  • This study explores the outcome of the current Land Compensation Act for the indigenous residents of DAEIM Public Development Project Zone in Gyeongsan City. The purpose of the law is to return part of the development gains to the native residents and to support the re-settlement of the native residents. As the Land Compensation Act applies to each area with different standards, the monetary terms of land compensation which the native residents eventually receive varies across the region and development sites. That means the development gain is not fairly shared with the native residents of the redevelopment area and it does not necessarily support the settlement of the existing residents. It is supposed that the actual compensation for the native residents should be in full cash value but it is not in reality. The study demonstrates the outcomes of the land compensation that the residents received are far from the original purpose of the Compensation Act using the case example of DAEIM Public Development Zone in Gyeongsan, Gyeongsangbukdo. Only a small proportion of the natives managed to achieve the development gains. Accordingly the majority of the native residents has lost re-settlement opportunity. It suggests that the Compensation Act and the implementation procedure should be reviewed and revised accordingly. The details of compensation plan should be tested and set up in line with the characteristics of the project area. In particular, the compensation details in terms of the size and types of land, average value of land for indigenous residents receive, and the amount of compensation per household should be clearly demonstrated to the resident.

Assessment of Urban Land Suitability Analysis for Public Park Planning

  • Sungmin Cho
    • International journal of advanced smart convergence
    • /
    • v.13 no.3
    • /
    • pp.259-266
    • /
    • 2024
  • One of the most time consuming issues in a city development is the identification of suitable areas for urban infrastructures and proper land uses. Suitability analysis is the process and procedures to find the best available land in given area -that is, the ability of a system to select the needs of users in land use. This paper studied the usage of Geographic Information System technique and methods for the selection of the most appropriate sites for public park in the city of Gwangju. GIS was used as a standard technique to find the best available sites for development in urban areas. For this cause, digital elevation model and spatial data were used to produce different thematic layers by using software Idrisi. Criteria for finding the suitable site for park development were decided to evaluate the land and the followings 4 criteria were selected: on land with less than 3 degrees in slope, outside a 200m buffer around lakes, on land currently designated as forests, and 20ha or greater in size. To meet and measure each criterion, distance and context operators were applied to reclassify the importance of certain weight and Boolean images were generated to meet the criteria. These weights and maps has been combined using ArcGIS tools and the final map was prepared showing the most suitable sites. We may assist city planners and government officials in future development of public facilities including parks and related land use plans at urban level and act as to ensure proper land use planning and management of the urban areas.

A Study on the Reforming Method of the Rural Land Regulations in the North Korea;Focused on the Public Land Lease from Henry George's Theory (북한 농촌의 토지제도 개혁 방안 연구;헨리 조지(Henry George)의 이론을 적용한 '토지 공공 임대제'를 중심으로)

  • Park, Chang-Soo
    • Journal of Agricultural Extension & Community Development
    • /
    • v.9 no.1
    • /
    • pp.43-60
    • /
    • 2002
  • Recently the North Korea has been suffered from the grain shortage, and the fundamental reason was in the socialistic land regulations and collective production which restrain farmers' labor desire. So one of the key in solve the problem may be in the reformation of the socialistic land regulations and collective production, however, the capitalistic land regulations may not work as the reformational alternative in the North Korea. The third alternative for land should consider efficiency and equality of reformation itself as well as environmental problems. The purpose of the study was to discuss the possible application of the Public Land Lease from Henry $George(1839{\sim}1897)'s$ theory. The basic idea of the Public Land Lease was that the government has the right of sentence and the right of profit for the land, and the individual has the right of use for the land. Under the Public Land Lease, the individual must pay the land rent for the period of the use for land, and must return the land when the contract is over. If the North Korea's rural land regulations reformed into the Public Land Lease, it would be the first reformational model beyond china.

  • PDF

Soil Pollution and Contaminated Soil Management of the Public Housing Agency in Residential Land Development (전국 토양오염실태 및 공공택지개발지구의 오염토양 관리)

  • Oh, Jeongik;Jin, Kyunam;Lee, Hyunjeong
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.38 no.7
    • /
    • pp.377-386
    • /
    • 2016
  • The purposes of this research are to examine soil pollution in the nation and to explore the contaminated soil management of the public housing agency in public land for residential development. In so doing, the primary and secondary data were utilized, the former made use of the public data annually released by the Korea Ministry of Environment, and the latter relied on a self-administerd questionnaire survey conducted in the staff of the public housing agency, particularly those in charge of soil contamination in large-scale land, housing and urban development projects. The findings reveal that the national concentrations of 21 inorganic and organic soil contaminants (e.g., Cd, Cu, As, Hg, Pb, Cr, Zn, Ni, F, P, PCB, CN, Phenol, BTEX, TPH, TCE, PCE, Benzo(a)pyrene, and pH) in the land were extracted to be well below the risk level designated by the statutory guidance while industrial areas had them at a relatively modest level. In addition, the survey results indicate that the public housing agency didn't establish specific and clear guidelines for soil pollution and its remediation in the residential land development, so that contaminated sites have been primarily remediated by outsourcing companies. As the unexpected occurrence of contaminated sites causes the incurring expenses added to total project budget, the provision of both professional training and on-site manuals with the sufficient information on techniques and methods of soil contamination is critical to promptly and systematically deal with soil pollution.

The Design Criteria for the Model Development of the New-hanok Type Public buildings - Focused on Expert Opinion Surveys -

  • Park, Joon-Young;Bae, Kang-Won;Kim, So Young;Jung, Kyung-Yoon
    • KIEAE Journal
    • /
    • v.16 no.1
    • /
    • pp.37-45
    • /
    • 2016
  • Purpose: According to the characteristic of hanok public building, Planning criterion of structure, technology, efficiency, design is needed which can includes various type of new-hanok type public buildings. In this paper, we collect expert opinions to be used as a basis for developing models of New-hanok type Public Buildings. Method: This study was conducted in Research Study and expert surveys. The Part of reviewing Study looked at conception of new-hanok type public buildings model development and overview planning criterion set briefly. Expert surveys were targeted to professors and architects who are related in new-hanok type public buildings model development research. Result: In this study, we suggest improvement direction about planning criterion of new-hanok type public buildings model development based on opinions collected by expert surveys. In conclusion, first, In concept and legal status, it is necessary to adjust clearly than the term and legal status of new-hanok type. Second, various applicability is needed by using new materials and new construction method at the part of planning elements. Third, 'composed structure-convergence type' and 'composed structure-juxtaposed type' should be clearly classified or combined at the part of Setting of type. Forth, improvement on heat insulation, soundproof, waterproof efficiency is demanded to roof, wall, window systems. Fifth, arranging revitalization plan is important.

A Study on School Location decision direction for Urban Amenity - The focus on Location relation school and park of land use planning- (도시쾌적성을 위한 학교용지의 입지결정방향에 관한 연구 - 학교용지와 공원용지와의 연관적 배치를 중점으로-)

  • Kim, Hyung Don;Kim, Sung Joong;Nam, Jung Hoon
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.8 no.1
    • /
    • pp.34-46
    • /
    • 2009
  • The purpose of this study was to analyze the school location decision direction for land use planning of public land development. And this research proposed the school location decision direction for urban amenity. So this research present the implication on urban planning and design for architecture, park-school complex. This study perform the relationship with land use planning out side environment of school land. This research proved the fact that the school land relationship with the park, the other school land etc. And this result will be used in decision-making-process of land use planning, public land development construction, urban design and city policy.

  • PDF

An Institutional Approach on Land Problems; Concentrate on Agricultural Development Areas (농업진흥지역(農業振興地域)의 문제점(問題點)과 개선방안(改善方案))

  • Kim, Jai-Hong
    • Korean Journal of Agricultural Science
    • /
    • v.22 no.2
    • /
    • pp.223-230
    • /
    • 1995
  • Agricultural land act was promulgated 1994, 12, 22. Now this is the time to evaluate present agricultural land related laws and its implications. Land problem is a conflict between private characteristics of ownership and public characteristics of utilization. Agricultural development aeras are the key areas where the conflict is intersected. Agricultural development aeras have many regulations to their use, so the price is relatively low. However to keep the food sufficiencies and public purposes, government have to keep agricultural development aeras. To compensate the owners of agricultural development aeras, I suggested some measures. One is direct payment to the owners of agricultural development aeras, the others are environmental subsidies.

  • PDF

Suggestions for Detection System of Bid-rigging in Public Construction Projects

  • Song, Sanghoon;Bang, Jong-Dae;Sohn, Jeong-Rak;Cho, Gun-Hee
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.712-713
    • /
    • 2015
  • In recent years, the bid-rigging in public construction markets has been treated as a critical issue in Fair Trade Commission. The investigation revealed that the collusion was implemented extensively in every area from the material supply to the construction service of general contractors. This study reviewed the causes of the bid-rigging in public construction projects, and proposed the improvement plan to eradicate bad practices. Firstly, the causes and purposes of bid-rigging were categorized into two types of internal factors from construction companies and external environment factors influencing business activities. Secondly, the system development method was explained to detect the signs of bid-rigging based on the technical proposal documents in open tender. The detection systems of repetitive public owner also provide the function of sharing data on the companies and cases to violate the fair trade regulation. In addition, the problems and improvement direction of public procurement policies were discussed.

  • PDF

A Study on the Use of Parking Lots and Improvement Methods of Land Supply in Public Development Zones (공공개발지구 내 주차장용지의 이용실태와 토지공급방법 개선방안 연구)

  • Park, Chang Yul;Kim, Si Jin
    • Land and Housing Review
    • /
    • v.10 no.4
    • /
    • pp.13-30
    • /
    • 2019
  • Parking lot within housing site contains public interest of relieving parking space shortage problem and subject to public restriction. If auctioned off at higher price by excessive competition in general competitive bid for land bidders, the development of parking lot will be made against its original purpose supply. The core issue is that a bid price is quite often to be blown out of proportion by 150%~ 250% due to extreme competition and, could face serious problem if a winning bidder runs sale business. If it is rental business, although about 30% of the total floor space of the whole building to be used as neighborhood facilities, too high winning bid price cause to lose transparency. In case of sale at aggregate buildings, most business operators would sell 30% of the neighborhood facilities, spare the parking lot and manages thereof separately. According to Aggregate Buildings Act, neighborhood facilities are allowed for individual registration and ownership of parking lot by business operator or designated person by business operator. In this case, the parking lot becomes 70% of the total floor space of the whole building and 70% of the land share which makes the mortgage very valuable and easier for business operator to get financial loan. There used to be many cases such as owners of neighborhood facilities (aggregate buildings partial owners) who run parking lot to repay their loan running parking lot to repay loan, but found that very tough and reached auction and relatively disadvantaged. For parking lot within housing site, it is recommend to exclude the public factors that land has and take into account of public restriction in area (housing site). Business opportunity for operators and protection of property rights for buyers in aggregate buildings, land supply method is recommended to replace from highest bid method into draw or private contract. In terms of price, supply at estimated price (construction price) and restriction on usage (Co-ownership of parking lot) proposals are submitted.