• 제목/요약/키워드: Public Construction

검색결과 2,512건 처리시간 0.026초

건설공사 발주 공공기관의 안전점검 체계구축에 관한 연구 (Establishment of a Safety Inspection System for Public Institutions Ordered Construction Projects)

  • 박응호;이수동;정기효
    • 대한안전경영과학회지
    • /
    • 제25권3호
    • /
    • pp.55-62
    • /
    • 2023
  • Public institutions have a responsibility to ensure the safety of their employees and the public. One way to do this is to implement a systematic safety inspection system based on risk assessments and continuous improvements. This study developed a systematic safety inspection system for public institutions that are ordered construction projects. The proposed system in this study consists of a three-step process: (1) developing safety grade evaluation tables, (2) preparing and conducting safety inspections, and (3) evaluating and improving safety management grades. The first step is to develop safety grade evaluation tables by analysis and diagnosis of the construction site's work type, disaster statistics, and related laws. The second step is to conduct safety inspections using the developed evaluation tables. The third step is to determine the safety management grade based on the results of the safety inspection, and to improve risk factors found during the safety evaluation. The proposed system was implemented in highway construction projects carried out by public institutions. The results showed that the proposed system has two major effects: (1) reducing accident-related deaths and injuries, (2) improving safety management levels by continuous evaluation and improvement. The proposed system can be utilized in construction projects ordered by public institutions to improve the level of occupational safety and health.

공공사업의 CM제도 개선 및 정책방향 (A Review of the Improvement of Construction Management (CM) System and the CM Policy for the Public Construction Works)

  • 장기창
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.207-212
    • /
    • 2002
  • 우리나라에서 건설산업의 구조개편, 건설기술의 경쟁력 향상 등과 맞물려 CM에 대한 다양한 논의과정이 있었으며 건설산업기본법('97) 및 건설기술관리법('01)에 CM제도가 규정됨으로써 명실상부하게 체계를 갖추게 되었다. 이 중 특히 공공사업에 대해서는 효율성 제고라는 문제의식에서 출발하여 제도의 활성화를 위한 시범사업(Pilot Project)이 정부를 중심으로 추진중에 있다. 현재 추진중인 시범사업은 제도의 정착, 활성화 뿐만아니라 기존의 CM제도를 좀더 구체화하고 다양화하는 과정으로서 그 시행의 중요성을 인식할 수 있을 것이다. 이러한 시범사업의 추진을 통하여 현재의 감리중심의 CM제도에서 발주자 및 사업특성을 고려할 수 있도록 Owner형 CM, PM형, 민자사업 적용방안 등 다양한 CM적용형태를 모색해야 할 것이다. 이러한 노력들은 공공사업의 효율성 제고 뿐만아니라 민간부분에도 많은 영향을 미칠 것으로 기대된다.

  • PDF

공공공사의 발주방식선정을 위한 의사결정요인 연구 (Determining Decision-making Factors for the Selection of Contract Methods in Public Construction)

  • 김대길;이웅균;이학주
    • 한국건축시공학회지
    • /
    • 제15권4호
    • /
    • pp.405-412
    • /
    • 2015
  • 공공공사의 발주는 발주방식의 선정이 발주부서 또는 발주업무 담당자의 업무적 경험 위주로 선정되고 있어, 해당 공사의 유형이나 특성 분석이 고려된 객관적인 선정 프로세스를 거치지 못하고 있다. 따라서 본 연구는 프로젝트 발주방식 선정 모델의 개발을 위한 초기 연구로써 공공공사의 발주방식 선정에 영향을 끼치는 주요 요인들을 분석하여 제시하고자 한다. 기존의 발주방식 관련 문헌조사를 통해 1차 요인을 제시하고, 요인분석을 통해 최종 영향 요인을 제시한다. 그 결과 발주자의 특성, 건설시장 환경, 조직, 프로젝트 특성, 비용, 책임요소의 6가지 대분류로 나뉘었으며, 하위요인으로 14가지가 선정되었다. 본 연구에서 제시된 요인들은 향후 공공공사 발주방식 선정을 위한 의사결정 지원 모델개발의 기초자료로 활용될 것이다.

공공아파트 계획설계단계에서의 공사비 예측모델 (Cost prediction model of Public Multi-housing Projects in Schematic Design Phase)

  • 권호석;문현석;이성균;홍태훈;구교진;현창택
    • 한국건설관리학회논문집
    • /
    • 제9권3호
    • /
    • pp.65-74
    • /
    • 2008
  • 국내 건설산업의 공공 발주자는 사업의 초기단계의 사업비관리에 대한 중요성을 충분히 인식하고 있음에도 불구하고 체계화된 공사비 산정시스템을 보유하고 있지 못한 실정이다. 이에 신규 공공 건설공사를 기획하고 사업비를 책정하는 단계에서는 예산을 수립하는 담당자가 기존의 실적데이터와 경험을 바탕으로 공사비를 추정하고 있으며, 기본설계단계와 실시설계단계 이후 산정된 공사비를 책정된 예산과 비교 후 사업의 추진여부를 검토하거나 설계내용을 예산에 맞도록 변경하고 있다. 이에 본 연구에서는 공공아파트의 사업초기단계에서 공사비를 산정할 수 있는 공공아파트 계획설계단계에서의 공사비 예측모델을 개발하고자 하였다. 본 연구의 결과를 바탕으로 계획설계단계에서 공사비를 예측하고 사업비 및 전반적인 설계를 관리한다면 지금보다 더 효율적인 방법으로 국가의 재원을 적절하게 책정하고 집행할 수 있을 것으로 판단된다.

Construction of Time - Cost Model for Building Projects in Vietnam

  • Long, Le-Hoai;Lee, Young-Dai;Cho, Jeong-Wook
    • 한국건설관리학회논문집
    • /
    • 제10권3호
    • /
    • pp.130-138
    • /
    • 2009
  • Bromilow's time-cost (BTC) relationship was examined for building projects in Vietnam using actual construction time and total construction cost. Data set was collected from 77 historical building construction projects completed between 1999 and 2005 which were adjusted by consumer price index (CPI) to 2000 price. Time-cost equations were specified respected to two sectors, public and private, in Vietnamese construction industry and all cases. It is shown that a public funded building project has the longer construction duration than a similar budget private funded project. The resulting models are statistically significant. The adjusted R-square coefficients of all cases, public and private projects models are respectively 0.403, 0.436 and 0.377 mean that the BTC regression lines moderately fit the data set.

도시이미지 향상을 위한 공사 가림막 표현특성에 관한 연구 - 서울시 공사 가림막을 중심으로 - (A Study on the Nature of the Expression of Construction Fence Screens to enhance the Images of Cities - Focus on the fence screens of Seoul -)

  • 오상민;한영호
    • 한국실내디자인학회논문집
    • /
    • 제20권3호
    • /
    • pp.259-266
    • /
    • 2011
  • Today, construction fence screens which were understood simply as structures of separating people from the dangers of construction sites have evolved into landmarks to enhance the images of Cities. Now, construction fence screens should have the function as landmarks stimulating people's sensibility through providing aesthetic values as well as the function of protecting people from the dangers of fields of construction. For this reason, this study tried 1) to show the relationships among these 4 classifications. is 4 realms of Human Beings - Cultural - Ecological - Digital in the expression methods of the construction fence screens of Seoul and 2) to simplify the characteristic elements of construction fence screens by way of extracting with Ecology, Installation Art, Symbolic, Commercial Expression. This study examined whether or not the construction fence screens of Seoul were playing the role as landmarks stimulating people's sensibility with sustainable improvement to the environment of Seoul as public design structures, by investigating some of the construction fence screens of Seoul. Also through analyzing the diversity of expression methods of the construction fence screens of other local governments as well as those of Seoul, we hope that they will be the public structures for enhancing the images of Cities.

공공발주처의 공사감독 업무영역과 비용 분석 (Analysis of the Work and Cost of Supervisor in the Public Construction Corporation)

  • 조성수
    • 한국건설관리학회논문집
    • /
    • 제4권3호
    • /
    • pp.146-152
    • /
    • 2003
  • 건설프로젝트에 있어서 공사감독은 공정관리, 품질관리 안전관리, 원가관리에 중요한 영향을 미친다. 그러므로 건설공사의 초기단계에서부터 감독의 지속적인 관리활동이 필요하다. 그러나 국내 공공 건설공사에서 감독의 업무량과 비용에 대한 평가가 미비한 실정이다. 또한 공사 감독이 초기단계에서부터 지속적인 관리활동이 가능한지에 대해서도 회의적인 시각이 상존하고 있다. 본 연구에서는 우리나라 공공발주처에서 시행하는 공사의 감독 업무와 외국에서의 공사감독의 관리활동을 비교$\cdot$분석하였다. 또한 국내 건설공사에서 감독에 소요되는 비용과 감독을 대체한 감리원을 활용하였을 때의 비용을 평가하였다. 이를 통하여 향후 감독업무의 개선이 가능하고 비용적 측면에서 인건비 등 공사 간접비의 절감을 기할 수 있겠다.

공공아파트 프로젝트 기획단계 공사비 산정시스템 개발 (Conceptual Cost Estimating System Development for Public Apartment Projects)

  • 이현수;이흥근;박문서;김수영;안요섭
    • 한국건설관리학회논문집
    • /
    • 제13권4호
    • /
    • pp.152-163
    • /
    • 2012
  • 건설 프로젝트의 초기 단계인 기획단계에서 산정된 공사비는 발주자의 의사결정에 큰 영향을 미치며, 프로젝트의 성공에 있어 중요한 요소로 작용한다. 그러나 국내 공공아파트 건설프로젝트의 경우, 공사비 예측은 실적데이터를 활용한 면적당 단가 방식에 머물러 있으며, 몇몇의 발주기관을 제외하고는 체계적인 건축공사비 산정 시스템을 구축하고 있지 않기 때문에 사업 초기단계에서 적정한 공사비를 예측할 수 없는 어려움이 따른다. 이에 본 연구는 선행연구에서 제시한 사례기반추론을 이용하는 공사비 예측방법을 사용하여 공공아파트 기획단계 적정 공사비 산정 시스템을 개발하였으며, 시스템 데이터베이스에 포함되지 않은 10개의 공공아파트 프로젝트 사례와 19명의 공공발주기관 실무담당자를 대상으로 시스템의 효용성과 적용된 방법론의 타당성을 검증하였다. 검증결과 평균 6.15%, 표준편차 4.39%의 총 공사비 예측 오차율을 나타내었으며, 공공발주기관의 실무자들은 본 연구에서 개발한 시스템이 현행 공사비 산정업무를 크게 개선할 수 있을 것이라고 평가하였다. 본 연구는 국내 공사비 예측 기술 및 사업비 관리 기술 발전의 토대를 제공하고 공사비 산정결과의 정밀성 및 일관성을 향상시킬 수 있을 것으로 기대한다.

AN ANALYSIS ON FACTORS AFFECTING SCHEDULE PERFORMANCE OF PUBLIC HOUSING PROJECTS: CASE OF SINGAPORE

  • Bon-Gang Hwang;Xianbo Zhao;Si Yi Ng
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.412-418
    • /
    • 2013
  • With the increasing demand for public housing, the Singapore government decided to reduce the waiting time of future public housing owners, which requires these projects to be completed on time. As a result, this study aims to identify the frequent and impactful factors affecting schedule performance of public housing projects in Singapore. The survey conducted with 36 industry experts revealed that "site management", "coordination among various parties", "design changes by owner during construction", "availability of laborers on site", "availability of material", and "availability of staff to manage projects" were the six factors that should be emphasized to assure the schedule performance of public housing projects. In addition, there was statistically significant agreement between public housing projects and other building projects on both the frequency and impact ranks of the factors. The findings from this study will help practitioners involving public housing projects to take measures to assure the achievement of project schedule objectives.

  • PDF

일본의 민관협력에 의한 공공건축 조성방식 사례 연구 (A Case Study on Public Building Construction Method by Public-Private Partnership in Japan)

  • 염철호
    • 대한건축학회논문집:계획계
    • /
    • 제34권12호
    • /
    • pp.3-12
    • /
    • 2018
  • The purpose of this study is to draw implications for revitalizing public-private partnership system that can reduce the financial burden of the government and utilize the creative know-how of the private sector by analyzing the cases of public building construction projects by public-private partnership method in Japan. In this study, first of all, I looked at the current state of public-private partnership policy in Japan and then selected 8 representative projects as an analysis target. Next, in order to grasp the specific situation that is aimed at securing publicity and revitalizing private participation, I analyzed the role sharing between public and private sectors in the maintenance and management of public buildings, and examined the conditions for private revenue facilities. As a result of the analysis, the following implications were drawn. First, the methods of public building construction by public-private partnership in Japan are largely divided into BTO method based on the PFI method, and the method of installing public facilities and private revenue facilities based on the term leasehold rights system. Second, measures were taken to mitigate the burden of the state and local governments in establishing public facilities. Third, the public has delegated to the private sector actively about the role that the private sector can play, expanding the role of private sector widely from design to operation in the public building construction projects. Fourth, in order to actively participate in private sectors and promote regional revitalization, private profit-making projects are widely accepted, but consideration has been given to guarantee a certain level of publicity.