• Title/Summary/Keyword: Protection time

Search Result 2,901, Processing Time 0.034 seconds

Development of Asynchronous Blocking Algorithm through Asynchronous Case Study of Steam Turbine Generator (스팀터빈 발전기 비동기 투입 사례연구를 통한 비동기 방지 알고리즘 개발)

  • Lee, Jong-Hweon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.10
    • /
    • pp.1542-1547
    • /
    • 2012
  • Asynchronous phenomenon occurs on the synchronous generators under power system when a generator's amplitude of electromagnetic force, phase angle, frequency and waveform etc become different from those of other synchronous generators which can follow instantly varying speed of turbine. Because the amplitude of electromagnetic force, phase frequency and waveform differ from those of other generators with which are to be put into parallel operation due to the change of excitation condition for load sharing and the sharing load change, if reactive current in the internal circuit circulates among generators, the efficiency varies and the stator winding of generators are overheated by resistance loss. When calculation method of protection settings and logic for protection of generator asynchronization will be recommended, a distance relay scheme is commonly used for backup protection. This scheme, called a step distance protection, is comprised of 3 steps for graded zones having different operating time. As for the conventional step distance protection scheme, zone 2 can exceed the ordinary coverage excessively in case of a transformer protection relay especially. In this case, there can be overlapped protection area from a backup protection relay and, therefore, malfunctions can occur when any fault occurs in the overlapped protection area. Distance relays and overcurrent relays are used for backup protection generally, and both relays have normally this problem, the maloperation, caused by a fault in the overlapped protection area. Corresponding to an IEEE standard, this problem can be solved with the modification of the operating time. On the other hand, in Korea, zones are modified to cope with this problem in some specific conditions. These two methods may not be obvious to handle this problem correctly because these methods, modifying the common rules, can cause another coordination problem. To overcome asynchronizing protection, this paper describes an improved backup protection coordination scheme using a new logic that will be suggested.

A Study on Protection of Generator Asynchronization by Impedance Relaying (임피던스 계전기를 이용한 발전기 비동기 투입 보호 연구)

  • Lee, Jong-Hweon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.11
    • /
    • pp.2000-2006
    • /
    • 2011
  • Asynchronous phenomenon occurs on the synchronous generators under power system when a generator's amplitude of electromagnetic force, phase angle, frequency and waveform etc become different from those of other synchronous generators which can follow instantly varying speed of turbine. Because the amplitude of electromagnetic force, phase frequency and waveform differ from those of other generators with which are to be put into parallel operation due to the change of excitation condition for load sharing and the sharing load change, if reactive current in the internal circuit circulates among generators, the efficiency varies and the stator winding of generators are overheated by resistance loss. Where calculation method of protection settings and Logic for Protection of Generator Asynchronization will be recommended, A distance relay scheme is commonly used for backup protection. This scheme, called a step distance protection, is comprised of 3 steps for graded zones having different operating time. As for the conventional step distance protection scheme, Zone 2 can exceed the ordinary coverage excessively in case of a transformer protection relay especially. In this case, there can be overlapped protection area from a backup protection relay and, therefore, malfunctions can occur when any fault occurs in the overlapped protection area. Distance relays and overcurrent relays are used for backup protection generally, and both relays have normally this problem, the maloperation, caused by a fault in the overlapped protection area. Corresponding to an IEEE standard, this problem can be solved with the modification of the operating time. On the other hand, in Korea, zones are modified to cope with this problem in some specific conditions. These two methods may not be obvious to handle this problem correctly because these methods, modifying the common rules, can cause another coordination problem. To overcome asynchronizing protection this paper describes an improved backup protection coordination scheme using a new Logic that will be suggested.

A Study on the Protection of the Bare and Painted Steel Plates (아연 양극에 의한 도장강판과 나강판의 방식 연구)

  • 문경만;김종신;김진경
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.17 no.1
    • /
    • pp.55-65
    • /
    • 1993
  • Galvanic protection method is one the cathodic protection methods and is mostly used for corrosion prevention of heat exchangers and ship's hull. In this paper, it was investigated that how cathodic potential distribution was varied with according to the bare and painted steel plates in case of galvanic anode protection. The results obtained above were as follows. 1. Cathodic potential distribution of a painted steel plate was smoothed than that of the bare steel plate all over the cathodic surface area. 2. It was shown that polarization potential of the bare steel plate was somewhat shifted to negative potential, on the contrary that of the painted steel plate was somewhat shifted from negative potential to positive potential as time gone by beginning of galvanic anode method. 3. The applied current density in order to maintain constant protection potential(-770mv SCE) in the painted steel plate was less than that of the bare steel plate because of the high resistance polarization of the painted steel plate. 4. It was suggested that required number and life-time of anode for galvanic anode protection could be decided easily with corrosion prevention coefficient obtained by experimental data.

  • PDF

Characteristics of Temperature Distribution of Axially Loaded CFT Column with Fire Protection (축하중을 받는 내화피복 CFT기둥의 온도분포 특성)

  • Kim, Hae-Soo;Yoon, Sung-Kee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.4
    • /
    • pp.78-85
    • /
    • 2010
  • When the fire occur, concrete filled steel tube(CFT) columns expected to form a much distinction in a fire resistance performance according to a kind of fire protection because the steel surface is directly exposed to high temperature. In this study, an experiment by three factors which were kind of fire protection, thickness of protection and time was performed to get the characteristics of temperature distribution types of CFT column with fire protection. As the result of this study, on a basis of heating temperature, spray protection was the most superior in a fire resistance performance, fireproof paint was next, and without fire protection was most inferior. In a heating time-location relationship, the temperature increased slowly on the surface of the concrete, but the temperature increased sharply on the surface of the steel.

A clinical study on the effects of myocardial protection during open heart surgery (개심술에서 술중 심근보호효과에 관한 임상적연구)

  • 김근호
    • Journal of Chest Surgery
    • /
    • v.20 no.2
    • /
    • pp.230-240
    • /
    • 1987
  • Cardioplegia and myocardial protection were performed under cardiopulmonary bypass during open-heart surgery with the use of cold St. Thomas Hospital cardioplegic solution [4=C] for the coronary artery perfusion and normal saline solution [4- C] for the topical cardiac cooling. To maintain the state of myocardial protection, coronary artery reperfusion was carried out using St. Thomas Hospital cardioplegic solution at the interval of 30 minutes. A total number of patients studied were 57 cases, including 37 cases of correction for congenital cardiac anomalies and 20 cases for acquired heart valvular diseases. Cardiopulmonary bypass time during the surgery was observed to be average of 87.89*47.55 hours, aortic cross-clamping time to be average of 76.68~44.27 hours raging from 30 to 191 minutes. In order to evaluate the effects of myocardial protection in the surgery, serum enzyme levels were determined. To observe the relationship between aortic cross-clamping time and myocardial protection effects, patients studied were divided into the following 3 groups. I group: aortic cross-clamping time, 60 minutes, II group: aortic cross-clamping time, 90 minutes, III group: aortic cross-clamping time, over 91 minutes. 1. Changes in serum enzyme levels in postoperative period. [1] SCOT; The postoperative value [increased over 200 units] for ischemic myocardial injury during operation was observed in 11 cases [19.3% of the total] of the total patients studied, of which 4 cases [13.3%] in I group, 1 case [10.0%] in II group, and 6 cases [35.3%] in III group. [2] LDH; The positive value [increased over 900 units] for ischemic myocardial injury during operation was observed in 9 cases [15.7% of the total] of the total patients studied, of which 2 cases [6.6%] in I group, 1 case [10.0%] in II group, and 6 cases [35.3%] in III group. [3] CPK; The positive value [increased over 800 units] for ischemic myocardial injury during operation was observed in 10 cases [17. 5% of the total] of the total patients studied, including 4 cases [13. 3%] in I group, 1 case [10.0%] in II group, and 5 cases [29.4%] in III group. 2. The myocardial protection method used in the present study was demonstrated to be effective for the myocardial protection in the surgery with aortic cross-clamping time of up to 90 minutes. A few ischemic myocardial injury were observed in the surgery with aortic cross-clamping time over 91 minutes, but no significant cardiac dysfunction was noted. The surgery with aortic cross-clamping time of up to 191 minutes did not appear to give rise any significant interference with postoperative recovery.

  • PDF

A study on SFCL System for Korean future distribution power system application considering auto reclosing actions of protection system (미래 배전계통에서의 자동재폐로 동작을 고려한 초전도한류시스템에 관한 연구)

  • Lee, Seung-Ryul;Kim, Jong-Yul;Yoon, Jae-Young
    • Proceedings of the KIEE Conference
    • /
    • 2005.11b
    • /
    • pp.344-346
    • /
    • 2005
  • The recovery time of developing SFCL(Superconducting Fault Current Limiter) has an uncertainty. In general, the recovery time is estimated at 1 sec and more, even though the progress of SFCL technology is considered. However, auto reclosing time of circuit breaker is 0.5 sec in Korean distribution power system. It is impossible to apply only one SFCL to power system because the recovery time is over the reclosing time of protection system. This study proposes a new SFCL system for distribution power system application. The proposed systems consider auto reclosing action for the protection in practical power system and consist of tow parallel SFCLs.

  • PDF

A Study on SFCL Systems for Future Korean T&D Power System Application Considering Auto Reclosing Actions of Protection System (미래 송배전계통에서의 자동재폐로 동작을 고려한 초전도한류시스템에 관한 연구)

  • Lee Seung Ryul;Kim Jong-Yul;Yoon Jae Young
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.12
    • /
    • pp.580-585
    • /
    • 2005
  • The recovery time of developing SFCL(Superconducting Fault Current Limiter) has an uncertainty. In general, the recovery time is estimated at 1 sec and more, even though the progress of SFCL technology is considered. However, auto reclosing time of circuit breaker is 0.3 or 0.5 sec in Korean power system. It is impossible to apply only one SFCL to power system because the recovery time is over the reclosing time of protection system. This study proposes two new SFCL systems for power system application. The proposed systems consider auto reclosing action for the protection in practical power system and consist of tow parallel SFCLs.

Protection Relay Coordination Study for Reducing Arc Flash Hazard (아크플래시 장해 대책 보호계전기 협조 검토)

  • Lee, Kang-Wan;Yang, Jung-Oock
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.545-546
    • /
    • 2015
  • Arc flash hazard study is required for the electric power system of industrial plant nowadays. Arc flash incident energy and level are calculated by arc flash hazard study. The arcing fault clearing time is determined by the response time of protection devices. This paper is protection devices coordination study to reduce potential incident energy for industrial electric power system.

  • PDF