• Title/Summary/Keyword: Project-based materials

Search Result 338, Processing Time 0.026 seconds

Application of Building Information Modeling for Steel Structures (강구조물 건설에서의 Building Information Modeling(BIM)의 도입)

  • Lee Suk-Joo;Cheon Jin-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2006.04a
    • /
    • pp.192-199
    • /
    • 2006
  • BIM is a collaborative. model-based way to work. Structural BIM is one of the key elements in the building process where the majority of structural information is created. Open BIM interfaces make it possible for all design information to be produced and managed within a single 3D product model. To make structural BIM a reality between owners, general contractors, architects and engineers. the software used need to be open in their communication. We used to Tekla Structures to provide an open environment through standard interfaces and Tekla Open API collaboration. We have developed MCP(machine cutting plan) and PIM(product information management)to provide cutting plan and drawing and manage to B.O.M, Materials, Production, Shipping and Project.

  • PDF

Using NIR Spectrometry for Direct Control of Recovered Papers

  • Borel, Pascal;Sabater, Jacques;Tourtollet, Guy Eymin Petot;Cochaux, Alain;Veiga, Joseph
    • Journal of Korea Technical Association of The Pulp and Paper Industry
    • /
    • v.39 no.5
    • /
    • pp.58-63
    • /
    • 2007
  • This paper sums up all the different steps broached in this project : The NIR spectroscopy technique has been studied and implemented at CTP using a mobile spectrometer device and different optical materials. Methods, based on statistical data analysis (in particular PLS regressions), have been investigated. A laboratory "prototype" using these techniques and methods has been developed in order to control the recovered papers quality, in terms of humidity percentage and sample composition (paper, board, contaminants).

Strength and Durability Properties by Concrete Type (콘크리트 종류에 따른 강도 및 내구성 특성)

  • 이병덕;심대원;양우석;안태송
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.04a
    • /
    • pp.189-194
    • /
    • 2000
  • The optimum mix proportioning of concrete is to produce a concrete which satisfies the strength, workability and durability required with minimum component of materials. However in practice the cement content of mix proportioning in construction field is normally higher then required. In this study, the existing mix proportioning of concrete currently used in Korea Highway Corporation has been reviewed by reducing 10kg of cement content by 3~5 strength in strength and workability during the first year of this project. The optimum mix design is established based on the results of the above review and durability were examined during the second year. The experimental results though 2 year show that 103~0% of the reduction of cement content still satisfies the specified strength of concrete and produces higher durability concrete.

  • PDF

Injury prevention for children (아동 사고 예방)

  • Son, Ina
    • The Korean Journal of Emergency Medical Services
    • /
    • v.5 no.1
    • /
    • pp.99-107
    • /
    • 2001
  • Injury has now replaced disease as the biggest single cause of death in children after their first birthday. Each month one child dies from preventable, unintentional injury and the medical cost of these injury is increasing remarkably. It is necessary to develop injury prevention system to manage, evaluate and analysis the information about accident. This resource manual developed as a result of literature review of child care safety project which is based on the Kidsafe Tasmanian Division in Australia and the other resources. The purposes of this study is to; 1. Develop model to enable services to focus on injury prevention 2. Develop standardized child care injury report form 3. Develop home safety checklist 4. Development of injury prevention policies The suggestions to develop injury prevention policies : 1. detail analysis of injury occurrence 2. investigation of known intervention and their effectiveness 3. analysis of policy environment 4. development of policy on implementation of intervention 5. develop protocol and materials to develop an injury prevention focus 6. increase knowledge and awareness among staff and parents of where injuries were occurring and develop.

  • PDF

A Case Study for the Economic Feasibility Analysis of CWM Power Plant (CWM 발전소의 경제성분석 사례연구)

  • Kim, Bong-Jin;Kim, Dong-Chan;Sin, Dae-Hyeon;Kim, Jeong-Deok
    • IE interfaces
    • /
    • v.4 no.2
    • /
    • pp.67-72
    • /
    • 1991
  • CWM(Coal Water Mixture) is a mixed fuel that consists of coal, water and additives. The main advantages of CWM are reducing the oil consumption and the air pollution materials such as flyash, dirt, and $SO_x$. This paper presented a case study for the economic feasibility analysis of changing an existing coal-oil power plant to a CWM power plant. The economic analysis of changing a coal-oil power plant to a CWM power plant was based on the total annual incremental costs of two power plants. We found that this project was economically and environmentally acceptable.

  • PDF

The research of Economical Re-oder point Estimating Method for building construction on the Downtown Area (도심지 건설공사 건설 자재의 효율적 재주문시점 산정 방안에 관한 연구)

  • Yun, Jung-Suk;Kim, Geun-Hwan;Jo, Young-Sik;Kim, Chang-Duk
    • KIEAE Journal
    • /
    • v.13 no.1
    • /
    • pp.159-165
    • /
    • 2013
  • Recently buildings are being constructed on the downtown area. In most building construction sites on the downtown area, the need for adequate material inventories are critical in order to avoid project delays and cost increases due to inappropriate deliveries of key materials. However immoderate material inventories cause increasing inventory cost. Therefore, we need a proper management material inventories. This research re-establishes the existing safety stock and analyzes relationship between safety stock and service level. It suggests an economical re-order point based on safety stock considering service level, various demand and delivery time.

A Fundamental Study on the Comparison of As-Planned with As-Built of Free-form Building Skins Using Laser Scanning Technology (Laser Scanning 기술을 이용한 비정형 건축외피의 As-Planned와 As-Built 비교에 관한 기초적 연구)

  • Kwen, Soon-Ho;Shim, Hyoun-Woo;Jang, Hyoun-Seung;Ock, Jong-Ho
    • Korean Journal of Computational Design and Engineering
    • /
    • v.16 no.2
    • /
    • pp.126-136
    • /
    • 2011
  • The existing approaches to freeform building construction cause many problems. However, recent BIM technique development based on parametric modeling method and improvement of freeform materials manufacturing technology using IT technology encouraged many advanced countries to try experimental projects. Thus, laser scanning technique is in the limelight as a new alternative in the field of freeform building construction and inspection. This study selected a domestic small freeform building and practiced laser scanning and as-planned modeling by using Reverse Engineering. Then each deviation was comparatively analyzed through figures which extracted data by numerically analyzing the newly modeled as-built and Excel spread sheet. Through the process, limits and follow-up research subjects are discussed as well.

Greenhouse Gas Management Policy during Construction Execution Phase -Focused on Green Building Rating Systems and Japanese Case- (건축물 시공단계에서의 온실가스 배출 관리 방안 -국내외 친환경 인증제도와 일본 현장의 대응 방안을 중심으로-)

  • Song, Sang Hoon
    • KIEAE Journal
    • /
    • v.10 no.5
    • /
    • pp.139-150
    • /
    • 2010
  • Until now, the eco-friendly construction (green construction) has been focused on reducing environmental impacts in use(operation and maintenance) phase. Considering the environmental influence along the life cycle of construction project, the impact in execution phase is rather lower than that in use phase. However, that impact is thought to be greatly decreased by well-organized activities. Based on its urgency and requirement for timely action, this study aimed to discuss the greenhouse gas (GHG) reduction plan in execution phase from a broad perspective. To achieve this purpose, the green building rating systems in domestic and foreign countries have been reviewed, and the practice in Japan was investigated. In order to improve current on-site greenhouse gas management, the integration among construction phases, participants, and environmental factors, and institutional supports are required as well as the contractor's efforts.

Elaboration and characterization of fiber-reinforced self-consolidating repair mortar containing natural perlite powder

  • Benyahia, A.;Ghrici, M.;Mansour, M. Said;Omran, A.
    • Advances in concrete construction
    • /
    • v.5 no.1
    • /
    • pp.1-15
    • /
    • 2017
  • This research project aimed at evaluating experimentally the effect of natural perlite powder as an alternative supplementary cementing material (SCM) on the performance of fiber reinforced self-consolidating repair mortars (FR-SCRMs). For this purpose, four FR-SCRMs mixes incorporating 0%, 10%, 20%, and 30% of natural perlite powder as cement replacements were prepared. The evaluation was based on fresh (slump flow, flow time, and unit weight), hardened (air-dry unit weight, compressive and flexural strengths, dynamic modulus of elasticity), and durability (water absorption test) performances. The results reveal that structural repair mortars confronting the performance requirements of class R4 materials (European Standard EN 1504-3) could be designed using 10%, 20%, and 30% of perlite powder as cement substitutions. Bonding results between repair mortars containing perlite powder and old concrete substrate investigated by the slant shear test showed good interlocking justifying the effectiveness of these produced mortars.

FALCON code-based analysis of PWR fuel rod behaviour during RIA transients versus new U.S.NRC and current Swiss failure limits

  • Khvostov, G.;Gorzel, A.
    • Nuclear Engineering and Technology
    • /
    • v.53 no.11
    • /
    • pp.3741-3758
    • /
    • 2021
  • Outcomes of the FALCON code analysis-related part of the STARS-ENSI Service Project on Evaluation of the new U.S.NRC RIA Fuel Safety Criteria and Application to the Swiss Reactors are presented. Substantial conservatism of the updated safety limits for high-temperature and PCMI cladding failure, as proposed in the NRC Regulatory Guide RG 1.236, is confirmed. Applicability of the updated failure limits to fuel safety analysis in the Swiss PWRs, as applied to standard fuel designs using UO2 fuel pellets and SRA Zry-4 as cladding materials is discussed. Conducting of new integral RIA tests with irradiated samples using doped- and gadolinia fuel pellets to support appropriate fuel safety criteria for RIA events is recommended.