• Title/Summary/Keyword: Project size

Search Result 917, Processing Time 0.025 seconds

Design of maturity model for software project management level evaluation (소프트웨어 프로젝트의 관리 수준 평가를 위한성숙도 모형 설계)

  • Jeon, Soon-Cheon
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.4
    • /
    • pp.609-615
    • /
    • 2011
  • In recent public institutions and banks to improve competitiveness in the integration of information systems projects are larger in size and may be the project's ever-growing need appropriate software project management plan. However, between the effect of the project management area for systematic research was scarce. Through this study, previous research in the important area of project management is developed, and "scope, schedule, quality, human resources, risk" of each area of impact analysis and the interaction between the progress of each area, the planning, execution, completion Performance levels were analyzed separately. Affected and Performance Analysis of the results to assess the level of the project management model is presented.

A Study of Development of land use design system using GA for Agricultural area (유전자 알고리즘을 이용한 경지 구획 결정 지원 시스템 개발에 관한 연구)

  • Jung, Yun-Chul;Yun, Sung-Soo;Lee, Jung-Jae
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2001.10a
    • /
    • pp.228-235
    • /
    • 2001
  • For standard size of farmland in Korea is small, we have to consume huge labor for cultivation and efficiency of machine is low. We practice the project, which make size of farmland enlarge. For many factors have to consider in design process in case of large-scale farmland, there are difficulties for comparing alternatives if we design it manually. So we need to techniques for establishing various alternatives and choosing the optimum design by the computer. In this study, fixing the boundary of project using the RGIS (Rural Geographical Information System) which standard electronic map in Korea. In the boundary, we analysis the many characteristics of farm land, optimize the adjustment process of field unit of farmland. In this process, we develop automatic farmland division techniques. The results of adapting the developed system show the usefulness to enlarge the size of farmland about 200%.

  • PDF

A Case Study on Applying Function Point Analysis Technique to Measure the Size of Software Systems based on UML (UML기반 소프트웨어시스템의 규모측정을 위한 기능점수분석기법의 응용에 관한 연구)

  • 안계중;이남용
    • The Journal of Society for e-Business Studies
    • /
    • v.7 no.2
    • /
    • pp.173-190
    • /
    • 2002
  • Over the past decade, numerous software managers and engineers have been concerned with measuring the size and complexity of software systems. Function point analysis technique is one of the most popular software sizing techniques. A reasonable software development plan through cost and time estimation should be a prerequisite for the successful project at the beginning stage of the project. It is generally known that software size measurement is useful for this kind of estimation and the function point analysis technique would be more effective than the others. However, it is difficult to apply the technique to object-oriented methodology widely used in the software industry. Thus, the purpose of this study is to present a case study on how to apply function point analysis technique to sizing of the software systems based on UML. The results of this study can be useful to managers and engineers.

  • PDF

A Study on the Space Size Analysis in the Multifamily Housing in aspect of management cost. -Focused on the Central Heating System using the diesel, kerosene- (공동주택 관리비용에 따른 적정공간규모 산정에 관한 연구 -경유, 등유를 사용하는 중앙집중난방방식을 중심으로 -)

  • 이강희;양재혁
    • Journal of the Korean housing association
    • /
    • v.13 no.5
    • /
    • pp.89-99
    • /
    • 2002
  • The multifamily housing has various advantages in construction cost, land-use intensity. KRIHS(1997) recommended the proper scale of th multifamily housing as 800 households in constructability, 1,000 households in facility compactability, 500 households in social aspect. At the early planning stage of project, the size of the multiftmily housing has, until now, been maximizingly considered under the regulation on which has been emphasized at the building volume ratio, land area, etc., except for the expenditure during the maintenance stage. This paper aimed at providing the proper size of multifamily housing in aspect of area and household number with maintenance cost at the early stage of project. For these, it took 곧 average cost function which is made from the 3-rd quardratic form and analyzes the unit increasing rate of the average cost. It surveyed in nationwide focused on the central heating system using diesel and kerosene. The number of samples is 88 and items of management cost is 11. The results are as follows ; first, 3rd-order quadratic function is proper at explaining the cost variation, considering the multicollinearity and statistics. Second, the proper size of multifamily housing is recommended with 83,000 $m^2$ on management area, 820 or over the 2,630 household number in aspect of total management cost.

Quality-Based Software Project Staffing and Scheduling with Project Deadline (제한된 프로젝트 기간을 고려한 품질 기반 소프트웨어 프로젝트 계획 생성 기법)

  • Seo, Dongwon;Shin, Donghwan;Bae, Doo-Hwan
    • Journal of KIISE
    • /
    • v.42 no.7
    • /
    • pp.878-888
    • /
    • 2015
  • Software project planning includes several processes for estimating the effort required to complete software project tasks, allocating human resources to tasks, and creating a project plan. Because software planning is becoming more complicated as the size of software projects grow, it is difficult for project managers to decide on a reasonable project plan. To help them, many automatic software project planning approaches have been proposed. The approaches all focus on minimizing project duration. But if the plan is simply to minimize the duration, without considering software quality, the plan can harm the eventual software quality. In our research to create a reasonable project plan, we consider software quality as well as duration of the project, by defining a software quality score. The project manager can plan the project to maximize software quality for a specific project duration.

A Model for Software Effort Estimation in the Development Subcycles (소프트웨어 개발 세부단계 노력 추정 모델)

  • 박석규;박영목;박재흥
    • Journal of the Korea Computer Industry Society
    • /
    • v.2 no.6
    • /
    • pp.859-866
    • /
    • 2001
  • Successful project planning relies on a good estimation of the effort required to complete a project, together with the schedule options that may be available. Despite the extensive research done developing new and better models, existing software effort estimation models are present only the total effort and effort (or manpower: people per unit time) function for the software life-cycle. Also, Putnam presents constant effort rate in each subcycles. However, the size of total efforts are variable according to the software projects under the influence of its size, complexity and operational environment. As a result, the allocated effort in subcycle also differ from project to project. This paper suggests the linear and polynomial effort estimation models in specifying, building and testing phase followed by the project total effort. These models are derived from 128 different projects. This result can be considered as a practical guideline in management of project schedule and effort allocation.

  • PDF

Development of Change Management System for Urban Development Project (신도시 건설사업의 변화관리시스템 구축에 관한 연구)

  • Cho, Jinyoung;Jang, Ounsung;Yu, Junhyuk;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.79-86
    • /
    • 2014
  • Construction project become larger and more complicated. Korea go through government complex relocation Mega-size program including many sub-projects which were complicated, long-term, and need extensive funding. Effective change management is very important for this kind of mega-project since it has many stakeholders and can't avoid continual change of schedule, budget, etc. Especially, change management process and system is very important for program success. When each project have changes, program is impacted by these changes. So, Change management is very important for effective program budget and time management. This study try to develop change management process and framework considering continuous changes in project level for effective program management. In addition, this study developed change management system and applied it to new mega-size program and analyze the effectiveness.

Risk Analysis on Offshore Windfarm Industry in South Korea: Based on the Jeonnam Offshore Windfarm Project

  • Kim, Tae Hyun;Kim, Yea-Sang;Chin, Sangyoon;Pallesen, Kristian
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.204-212
    • /
    • 2022
  • Recently, the Korean government has been actively promoting the smart city as their strategic agenda. However, to build smart cities that are greener, the authors believe it is essential to rapidly transit conventional energy sources such as fossil fuels to renewable energy. Although there is a big potential for Offshore wind in Korea, there has not been a full-scale commercial offshore wind farm until today. Since Korea is relatively a new market compared to the EU, it can be risky for developers. The authors will introduce risk management best practices in the offshore wind industry applicable to the Korean environment. This paper will mainly introduce an offshore wind project size of 99 MW. The project is expecting a Finance Close (FC) in Q3 2022, so the project team has prepared a risk register with over 150 risks and levers throughout the project lifecycle. Overall risks include risks with Development Expenditure (DEVEX) impact, a Capital Expenditure (CAPEX) impact, and an Operating Expenditure (OPEX) impact. Based on the identified risks, a more qualitative assessment of Cost and Schedule Impact was conducted. In conclusion, a Monte Carlo simulation was performed to propose a quantitative risk assessment to evaluate a benchmark contingency of the project cost.

  • PDF

기술혁신 기업과 R&D 프로젝트 파이낸스 : 지속적 기술혁신을 위한 자금조달의 대안

  • 김영훈;변혜영;이정동
    • Proceedings of the Technology Innovation Conference
    • /
    • 2006.02a
    • /
    • pp.170-186
    • /
    • 2006
  • The guarantee funds for government policy fund, venture capital investment fund, technology guarantee debt are the core parts of the external financing system in the constant technology innovation company. However, the enterpriser's requirement to keep the technology innovation with minimized management intervention and policy maker's hope to advance technology development with clear operation of funds is enough to request for research of the project investment plan to the R&D project. This paper will analyze whether technology innovation company that creates cash flow prefers to the project investment as a financing program or not, and if prefers, what characters of company affect on this preference. The more the company that pursuit the additional R&D activity separated to on-going items becomes over the fixed size, the more prefers the project investment as future external fund-raising. Together with that, this paper suggests that we can apply the plan like special purpose vehicle, SWORD(Stock Warrant Off-Balance sheet R&D) and R&D Limited Partnership as R&D project investment policy, and improve the system itself.

  • PDF

A Study on the Establishment of Masterplanner Operating Model for Residents' Participation Regeneration Project in Old Settlements of Downtown Jeju (제주시 원도심 주민참여형 재생사업의 총괄계획가 운영 모델 수립에 관한 연구)

  • Yang, Gun;Yi, Sang-Ho;Baek, Seung-Heon
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.17 no.3
    • /
    • pp.37-44
    • /
    • 2015
  • The purpose of this study is to find important factors for establishment of masterplanner operating model in residents' participation regeneration project suitable for small provincial city compared with Seoul city's which were already operated these days. The study showed the following results: 1) Conditions required for masterplanners are professional, regionality, sustainability, balance, independence. 2) Regionality and professionality can be guaranteed by expert-recommendation and perform manual suitable for character of project and regional conditions. 3) Conditions required for masterplanners are applied flexibly depending on the size and duration of project.