Journal of Korea Society of Industrial Information Systems
/
v.4
no.3
/
pp.1-7
/
1999
An important task for any software project manager is to be able to predict and control project size. Unfortunately, there is comparatively little work that deals with the problem of building prediction methods for software size in fourth-generation languages and database projects. In this paper, we propose a new estimation method for estimating for software size based on minimum relative error(MRE) criterion. The characteristic of the proposed method is insensitive to the extreme values of the observed measures which can be obtained early in the development life cycle. In order to verify the performance of the proposed estimation method for software size in terms of both quality of fit and predictive quality, the experiments has been conducted for the dataset Ⅰ and Ⅱ, respectively. For the data set Ⅰ and Ⅱ, our proposed prediction method was shown to be superior to the traditional method LS and RLS in terms of both the quality of fit and predictive quality when applied to data obtained from actual software development projects.
Proceedings of the Korea Society for Industrial Systems Conference
/
1999.05a
/
pp.97-105
/
1999
An important task for any software project manager is to be able to predict and control project size. Unfortunately, there is comparatively little work that deals with the problem of building estimation methods for software size in fourth-generation languages systems. In this paper, we propose a new estimation method for estimating for software size based on minimum relative error(MRE) criterion. The characteristic of the proposed method is insensitive to the extreme values of the observed measures which can be obtained early in the development life cycle. In order to verify the performance of the proposed estimation method for software size in terms of both quality of fit and predictive quality, the experiments has been conducted for the dataset I and II, respectively. For the data set I and II, our proposed estimation method was shown to be superior to the traditional method LS and RLS in terms of both the quality of fit and predictive quality when applied to data obtained from actual software development projects.
Many companies and governments perform information technology (IT) projections repeatedly for higher competitiveness and efficiency. Moreover, as the sizes of IT projects increase, the manpower and cost estimation of the projects are getting more important. In this research, we present a size estimation method of information system development projects on the basis of the function point method at the stage of information strategy planning(ISP), and illustrate the size calculation of an example IT project. According to the method, we first identify the types of projects, the scope and boundaries of size estimation, then count data and transaction functions from the artifacts of the ISP project. The unadjusted function points are adjusted to function point by the table of the Early Function Point. The way of calculating the sizes of IT projects will support successful IT projects by estimating reasonable manpower and cost for the projects.
Journal of Construction Engineering and Project Management
/
v.4
no.1
/
pp.37-44
/
2014
Comparatively, the construction industry has, on average, a higher rate of fatal and major injuries, work induced ill-health and damage to properties than other industrial sectors; and this is a source of concern to industry stakeholders. The study showed that although subcontracting could be contributory to an increase in workplace accidents in the construction industry, contractual aspects of subcontracting arrangements (such as the power imbalance that exist along the client-customer interface) also present opportunities for improvements in health and safety management (HSM) practices in organisations. This conclusion was reached after an analysis of a questionnaire survey (with a 27% response rate) that assessed the attitudes and perception to health and safety issues.
Journal of Information Technology Applications and Management
/
v.15
no.4
/
pp.77-101
/
2008
The market size of Internet portals has been continuously expanded and also competition has been fierce. For the business success of Internet portals, it is necessary to repeatedly perform a renewal project which improves their services, reflecting more improved or changed strategies. Accordingly, this paper proposes an analysis methodology for performing the renewal project more systematically and effectively. The methodology consists of four phases : establishing improved strategies, analyzing customers, deriving service alternatives, and determining services. The methodology places an emphasis on reflecting effectively customers' standpoints (i.e. customers' needs) and service providers' standpoints (i.e. business strategy) upon service improvement. Furthermore, the methodology includes a specific technique for analyzing the feasibility of services. To demonstrate the practical usefulness of the methodology, a real-life case is illustrated.
Journal of the Korean Professional Engineers Association
/
v.19
no.2
/
pp.34-42
/
1986
These brief studies and reports of the use of exposed aggrigate precast concrete in practice are combined with a description of some notable co-ordination such as shop drawing, manufacturing and erection in the field construction. Above mentioned exposed aggrigate P. C. means architectural P. C. which was used to the VOTRAKON site in Riyadh, Saudi Arabia. Fabricated P. C. on the site without autoclaving and steam curing plant had been successfully carried out on this project-core building, conference room and others. The project designed by HOPE/VTN international INC. which is located in San Diego, California U.S.A. stands for vocational training and related support facilities contract. We had to submit shop drawings showing complete information for fabrication and installation of P. C. unit reinforcement. Also we should be indicated member dimension and cross section, location size and type of necessary for erection. We can delineate the following characteristic results. One of the most important things how to handle exposed aggrigate P.C. unit as specified was quality assurance and co-ordination for shop drawing, manufacturing and erection.
Journal of Korean Institute of Industrial Engineers
/
v.12
no.1
/
pp.147-155
/
1986
Nations, especially developing countries, hope to license the technology developed at the expense of government Research and Development (R&D) investment to the corresponding firms for commercial exploitation. Since commercial process is owing to lots of risk, firms have to grope the possibility of forming a partnership in order to reduce the risk. Therefore, a joint venture between firms would be needed to share the risk. This methodology suggests a way that probabilistic information of commercial project payoffs can be obtained using experts in project evaluation committee and the ratio of individual firm's investment size can be derived using risk sharing concept. Also simple examples are given.
Korean Journal of Computational Design and Engineering
/
v.17
no.5
/
pp.342-352
/
2012
As a futuristic construction model, building information model (BIM) based project management system (PMIS) and mobile BIM simulator apps have been showing visible sign. However, researches on the BIM based 3D simulator using mobile device are hard to find result from limitation of mobile device (slow speed at huge 3D file, display size, and etc.) and undefined standard of business processes. Therefore, this research aims at studying application of mobile BIM apps based on cloud computing. Total 8 BIM cloud apps were selected and analyzed in the 5 application feasibility characteristics (speed, view, inquiry, markup, and usability). This research would be essential phase to construct BIM based mobile project management system using cloud computing in the future.
Proceedings of the Korean Operations and Management Science Society Conference
/
1994.04a
/
pp.410-420
/
1994
In many project-oriented production systems, e.g., shipyards or large-scale steel products manufacturing, resource loading by an activity is flexible, and the activity duration is a function of resource allocation. For example, if one doubles the size of the crew assigned to perform an activity, it may be feasible to complete the activity in half the duration. Such flexibility has been modeled by Weglarz [131 and by Leachman, Dincerler, and Kim [7] in extended formulations of the resource-constrained project scheduling problem. This paper presents a new algorithmic approach to the problem that combines the ideas proposed by the aforementioned authors. The method we propose involves a two-step approach: (1) solve the resource-constrained scheduling problem using a heuristic, and (2) using this schedule as an initial feasible solution, find improved resource allocations by solving a linear programming model. We provide computational results indicating the superiority of this approach to previous methodology for the resource-constrained scheduling problem. Extensions to the model to admit overlap relationships of the activities also are presented.
Journal of the Korean Institute of Rural Architecture
/
v.9
no.3
/
pp.63-72
/
2007
Recently, with the policy balance development in the country, Ministries of the government as managers related each of regional projects have prepared pan-governmental support system to achieve Making Livable Area Policy. This study is analysis result of investigation in 2007 authorized cases of MLCP(Making Livable City Project) which Ministry of Construction & Transportation have propelling from city and rural-urban area of town, myeon and dong, to rural area of small village size. Areas chosen for MLCP have the active participation of inhabitants, and to promote successfully project, need to support system and originality for area. Such projects will finally increase the life quality, and make life-spaces wanting to live in the area.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.